For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 11,800
Summary
Construction Of Bituminous Arterial Road
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
253937Bid Award Id
ViewTender No
18/CE/TSIIC/2021-22, Dated:14.07.2021Tender Authority
Telangana State Industrial Infrastructure Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Girth from 300 mm to 600 mm
167.25
-
380.93
... More
Girth from 600 mm to 900 mm
123.75
-
656.17
... More
Girth from 900 mm to 1800 mm
84.75
-
1312.39
... More
Girth above 1800 mm
39
-
2519.16
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including all hire and operational charges of T&P, all labour charges, complete for finished item of work as per MORTH(5th Revision) Spec No.301 (payment will be based on levels for finished item of work).excluding GST,
110775.7
-
110.9
... More
Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres including all operational,labour charges such as shoring,sheeting,planking, strutting etc.,for finished item of work excluding dewatering charges etc., as per technical specification clause 301MORTH (5th Revision) excluding GST
31650.2
-
260.03
... More
Earth Work Excavation for Road way in hard rock(Blasting Prohibited) by mechanical means including breaking rock and depositing on bank for all lifts and with an initial lead including all operational,labour charges such as shoring,sheeting,planking, strutting etc.,for finished item of work excluding dewatering charges etc., as per technical specification clause 301MORTH (5th Revision) excluding GST
15825.1
-
798.69
... More
Formation of embankment / subbase with useful excavated soils obtained from Road, drains and Culverts by mechanical means and spreading in layers not more than 200mm thick each or as directed by the Engineer-in-Charge including pre-watering soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory roller of 8 to 10 Tonnes capacity @ OMC compaction to meet requirement of table 300.1 and 300-2 of MORT&H including labour charges for all operations, hire and operational charges of T&P, all water leads duly maintaining the required camber in the formation etc., complete for finished item of work as per MORTH Specification clause 305 (5th Revision) (Payment will be made based on level for finished item of work). Excluding GST
33831
-
123.08
... More
Filling with available soil at median (Construction of Median and Island) above road level with approved material deposited at site from roadway cutting and excavation for drain and foundation of other structures,spreaded,graded and compacted with plate compactor to achieve the desired density,including cost and conveyance of all material,labour charges for all operations,hire and operational charges all T & P,diversion of traffic etc complete for finished item of work as per clause 407 MORTH Specification. Excluding GST.
2356.11
-
212.57
... More
Providing Granular Sub Base using HBG crushed close graded material confirming to grading -I of MoRTH table - 400.1 (50% of 53mm to 9.5mm , 20% of 9.5 to 2.36mm and 30% of 2.36mmm below)including spreading the HBG material in layers of uniform thickness not exceeding 150mm thick with motor grader on prepared surface, mixing by mix in place method at OMC and compacting with vibratory roller to achieve the desired density complete as per technical specification as directed by the Engineer-in-charge etc, including cost and conveyance of HBG material, water etc to site, , labour charges for all operations, all incidentals hire & operational charges of roller and other T&P etc, complete for finished item of work as per MoRT&H (5th Revision) Specification 401. Excluding GST & Seignoriage Charges.
7186.41
-
1318.45
... More
Providing, laying, spreading and compacting graded stone aggregates to Wet Mix Macadam specification including cost & conveyance of all material, hire and operational charges of T&P, labour charges for all operations, premixing the material with water at OMC in mechanical mix plant, carriage of material by tipper to site, laying in uniform layers with paver finisher in subbase/ base course on well prepared surface and compacting with vibratory roller to achieve the desired density, including lighting, grading, barricading and maintenance of diversion of trafic, etc., complete for finished item of work, as per table 400.13 of technical specification clause 406 MORTH(5th Revision). excluding GST & Seignoriage Charges
11626.44
-
1574.16
... More
Providing and applying Primer coat with bitumen emulsion (SS-1) (Slow Setting) over the prepared surface of granular base as WMM surface at the rate of 6Kg/10sqm including cleaning the road surface with mechanical broom and air compressor and spraying uniformly with the aid of bitumen pressure sprayer including cost and conveyance of bitumen emulsion and water, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 502. Excluding GST
43131.72
-
50.69
... More
Providing and applying Tack coat with bitumen emulsion (RS-1)(Rapid Setting) over the prepared surface before laying DBM at the rate of 2.5kg/10 sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T&P necessary to complete the finished item of work as directed by the Engineer-in-Charge as per MORTH (5th Revision) specification 503. excluding GST
43131.72
-
11.78
... More
Providing and laying 50mm thick dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading (grade-II), premixed with bituminous binder with VG-30 grade @ 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete for finished item of work as per MoRTH (5th Revision) specification clause No. 507 complete in all respects. Excluding GST & Seignoriage Charges
2156.59
-
7924.36
... More
Providing and applying Tack coat with bitumen emulsion RS-1 (Rapid Setting) over the prepared surface before laying BC @ 2kg/ 10Sqm including cleaning the road surface with mechanical broom and air compressor and applying uniformly with the aid of emulsion pressure sprayer including cost and conveyance of bitumen emulsion, labour charges, cleaning, hire charges and operational charges of all T & P necessary to complete the finished item of work, excluding GST, as direced by the Engineer-in-Charge as per MORTH (5th Revision) specification 503
43131.72
-
9.8
... More
Providing, laying bituminous concrete of thickness 40mm on prepared surface with specified graded crushed aggregate grade II and VG-30 grade bitumen binder @ 5.5% of weight of mix conforming to MORTH (5th Revision) 508 for wearing course including loading aggregates with F.E. loader, heating & mixing the aggregate and binder in 100 - 120 TPH Capacity batch type hot mix plant, transporting the mixed material with tipper and laying with 100TPH capacity Paver Finisher Hydrostatic with sensor control to the required grade, level & alignment and rolling with vibratory roller of 8 - 10T static weight, power roller of 8 to 10 Tones capacity and tandem roller to achieve the desired density including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete for finished item of work excluding GST & seigniorage charges.
1725.27
-
9195.84
... More
Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface,including hire and operational charges of all T & P, cost and conveyance of all materials, labour charges for all operations, diversion of traffic, etc., complete for finished item of work excluding GST & seigniorage charges. as per clause 515.
17221
-
595.02
... More
Providing gravel berms to the required thickness including spreading in layers of 150 mm thick with side slope of 2:1(2H:1V),sectioning each layer to proper camber, watering, consolidation of each layer with vibratory roller of 8 to10 tonnes capacity to achieve desired density at OMC including cost conveyance of gravel, water etc., to site, labour charges for all operations, hire and operational charges of vibratory roller and other T&P diversion of traffic, etc., complete for finished item of work, as per MORT&H (5th Revision) Spc.No.401. Excluding GST & Seignoriage charges.
25709.25
-
291.33
... More
CROSS DRAINAGE WORKS
-
-
-
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including all hire and operational charges of T&P, all labour charges, complete for finished item of work as per MORTH(5th Revision) Spec No.301 (payment will be based on levels for finished item of work).excluding GST,
1904.65
-
110.9
... More
Laying Plain Cement concrete (1:4:8) Prop using 40mm size HBG machine crushed stone aggregate confirming to table 1000-1 and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT&H specification including cost,conveyance of all materials (viz) cement, stone aggregate, sand, water etc., to site, labour charges for all operations, machine mixing, laying, finishing smooth to required level, curing, all other incidental and operational charges etc, complete for finished item of work as per MORT&H specification 2100 (5th revision) and as directed by the Engineer-in-charge , except GST & Seigniorage charges. all work up to plinth level - For Culverts
55.75
-
3419.93
... More
Providing and laying Viberated Reinforced Cement Concrete corresponding M30 grade using 10 to 20mm with cement and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT & H specification including cost and conveyance of all materials (Viz) cement, stone aggregate, sand water to site, centering, shuttering, machine mixing, laying concrete, vibrating, finishing smooth to required level, curing, all other incidental and operational charges, labour charges etc., as per Morth specification 1500, 1600 & 1700 (C) - (For Drains - Bed/Side walls/Top Slab) Excluding GST & Seignoriage charges
215.28
-
5959.91
... More
Supplying fitting and placing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of all diametres using primary producers like TATA, SAIL, VSP, Jindal, Shyam Steel etc., of bar reinforcements for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes except GST on all materials etc, including overheads & contractors profit etc., complete for finished item of work.
4.41
-
71777.41
... More
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including all hire and operational charges of T&P, all labour charges, complete for finished item of work as per MORTH(5th Revision) Spec No.301 (payment will be based on levels for finished item of work).excluding GST,
634.88
-
129.44
... More
Laying Plain Cement concrete (1:4:8) Prop using 40mm size HBG machine crushed stone aggregate confirming to table 1000-1 and fine aggregate { 50% of River Sand (Natural Sand) & 50% of Manufactured Sand/Crushed stone sand/Rock sand 4.75mm to 2.36 mm confirming to IS 383 } conforming to table 1000-2 of MORT&H specification including cost,conveyance of all materials (viz) cement, stone aggregate, sand, water etc., to site, labour charges for all operations, machine mixing, laying, finishing smooth to required level, curing, all other incidental and operational charges etc, complete for finished item of work as per MORT&H specification 2100 (5th revision) and as directed by the Engineer-in-charge , except GST & Seigniorage charges. all work up to plinth level ( under Pipe Line)
78.88
-
3419.93
... More
Providing laying Reinforced cement concrete Hume Pipe of NP-4 class plain ended tongue and groove model pipe including cost and conveyance of pipe and labour charges for laying, jointing of RCC Hume pipe in position with Cement Mortar (1:2) including lifting, aligning, lowering and hoisting etc., as per drawing and as per MORTH specification 2900,2905 and 2906 and as directed by Engineer-in-charge complete for finished item of work for Pipe culvert . Excluding GST & Seignoriage charges
-
-
-
... More
300mm Dia
200
-
1704.88
... More
500 mm Dia
330
-
3201.77
... More
900 mm Dia
90
-
9145.25
... More
1000 mm Dia
90
-
10790.98
... More
Lowering the RCC S/S pipes carefully into the trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water with a water lead up to 500 meters including cost of rubber rings as per BIS No.783/1985as directed by Engineer-in-Charge etc.,including all hire and operational charges of T&P, all labour charges, complete for finished item of work,except GST
-
-
-
... More
300mm Dia
200
-
179.42
... More
500 mm Dia
330
-
275.1
... More
900 mm Dia
90
-
560.73
... More
1000 mm Dia
90
-
663.86
... More
No. of Items : 24 Twenty Four only)
-
-
-
... More
(Rupees Twelve Crores Sixty Lakhs Ninety Four Thousand One Hundred and Sixty Two Only)
-
-
-
... More
Part-I
-
-
-
... More
Part-II - Seigniorage Charges payable as per actuals
-
-
-
... More
Note :
-
-
-
... More
1) The rates mentioned in schedule 'A' are including overhead charges & Contractors Profit. The overhead charges includes Labour Amenitites and Labour Importation / Compensation / Site Supervision / Quality Control Charges and Bankers Charges, etc. Hence the contractros quoted percentage is inclusive of all the above including Technical persons labour welfare cess, District mineral fund and work insurance and no reimbursement for these will be made. 2)The above rates for finished items of work including cost and convenyance of all requisite materials to site, Labour Charges for all operationas, curing wherever needed, all Incidental, Hire and Operational charges of all T&P barricading, Diversion of traffic etc., including all taxes except GST & Seigniorage Charges .
-
-
-