Telangana State Education Women And Infrastructure Development Corporation Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 31,700Document Cost
Refer DocumentsTender Fee
₹ 10,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
543440Bid Award Id
ViewTender No
SE/TGEWIDC/HYD/NIT/271/2024-25, DT:06.09.2024Tender Authority
Telangana State Education Women And Infrastructure Development Corporation ViewPurchaser Address
-Website
http://https://www.roadbuild.telangana.gov.in/home.do
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Building work;Supply and run of 3 of 2.5 Sq mm PVC F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connection. Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).
30
153
4613
Building work;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant Low Smoke (FRLS) / HFFR P.V.C. insulated 1100 V Grade as per IS: 694 / 1990 specification for flexible copper cable (ISI MARK) in existing pipe with 6A 1 way modular switch, Ceiling rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR). Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity
18
705
12695
Building work;Supply and transportation of 20W +/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with Single / double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj /Havells / Jaquar / IB LED / Panasonic /Halonix / HPL / Syska / Eveready / Surya/ Keselec / Arraystorm / GM / Goldmedal LED MAKE : PHILIPS LUMILEDS / CREE /NICHIA / OSRAM / SAMSUNG / LG LEDs.
12
441
5303
Building work;Supply and fixing of 1 Module Modular type Electronic Fan Regulator in the existing switch board Makes :Legrand Arteor / Schneider Zencelo / Honeywell Blenge Plus / CabtreeAmare / Logus Platina / Gold Medal GIFA/ GM-Zenova/ L&T- Englaze
12
673
8078
Building work;Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard (HFFR) / Gold Medal / Kundancab / HPL / RPG /Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal /Suncab
12
235
2829
Building work;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current (BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient
12
3114
37378
Building work;Supply and Fixing of ISI 25mm outer dia mediumgrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in wall with all required accessories including masonary work for light, fan and separate plug point with 8 or 9 Module Hot dip galvanized Metal Box including all labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision
5
118
592
Building work;Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box with hook including all Labour charges etc., complete.
8
198
1590
Building work;Electrical:-- Supply and Fixing of ISI 25mm outer dia heavygrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision
54
102
5546
Building work;Painting to New wood work with two coats of ready mixed synthetic enamel paint Grade I all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
6
238
1430
Building work;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors
205.5
290
59595
Building work;Supply and Fixing of Door with Double leaf shutter only off Size 1.22x2.13 mtrs with Flush Door Shutter Solid Bond Wood black board type with commercial ply on both faces of 30mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long MS Powder coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, MS Powder coated heavy Door stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.
1
15630
15630
Building work;Supply and Fixing MS Purlins 50mm dia including Labour Charges for fixing complete including cost and conveyance of all materials to site, sales and other taxes, all labour charges etc., complete for finished item of work
10.95
610
6685
Building work;Roofing: - Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove
14
884
12383
Building work;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
205.5
643
132291
Building work;First Floor:-Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).
15.5
8984
139240
Building work;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126)
7
74193
519351
Building work;Painting to New wood work with two coats of ready mixed synthetic enamel paint Grade I all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
17.05
238
4063
Building work;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors
154.9
290
44921
Building work;Painting to new walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal Walls.(APSS No. 912) in All Floors
509.3
209
106520
Building work;Making Green Chalk Board of size 3.00Mx1.20Mts including border with plastering in CM (1:2) 12mm thick as base coat and 3mm thick top coat with cement green oxide powder in (1:1) prop. and making border of 50x20mm thick alround the chalk board over existing plastered surface and painting the chalk board surface with chalk board paint as per direction of Engineer-in-Charge including cost and conveyance of all materials, sales and other taxes on cost of materials and all operational, incidental and labour charges etc., complete but excluding seigniorage charges for finished item of work (APSS No.1603)
12.6
850
10719
Building work;Flooring with Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) Manufactured Sand (Rock sand) and natural river sand (Screened sand ) in the ratio of 50:50over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.703 & 701)
120.6
883
106520
Building work;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
505.05
587
296944
Building work;Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall but excluding seigniorage charges for finished item of work. (APSS 901,903 & 904)
170.2
607
103385
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403)-Sunshade
6.5
1194
7764
Building work;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403)-Lintels
1.85
14749
27315
Building work;Providing & Fixing of Open able Windows with Flymesh made of pre-painted steel as per IS 513 of 0.58mm thick galvanized as per IS 277 finish painted with a polyester paint and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 0.5 mm thick Galvalume corrugated sheet and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch , complete for Centre fixed both side open able shutter window for a size 5?0?x4?0? (1524mm x1219.2mm).
18.25
8051
146890
Building work;Supply and Fixing of Door with Double leaf shutter off Size 1.22x2.13 mtrs with Flush Door Shutter Solid Bond Wood black board type with commercial ply on both faces of 30mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long MS Powder coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, MS Powder coated heavy Door stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.
3
15630
46890
Building work;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).
39.36
8361
329110
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc, complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Roof slab 125mm thick
159.3
1403
223605
Building work;Plain Cement Concrete M20 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., complete but excluding seigniorage charges for finished item of work for steps
0.75
7897
5943
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc, complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) MLB
9.5
11641
110568
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc, complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Staircase wasist slab 150mm thick
16.35
1584
25907
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using(50%50) of river sand and Manufactured Sand , 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Manufactured sand and River sand in the Ratio 50:50), coarse aggregate, water etc., to site and cost of all materials including centering using CaSteel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) -Plinth Beam
9.25
14586
134936
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using(50%50) of river sand and Manufactured Sand , 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Manufactured sand and River sand in the Ratio 50:50), coarse aggregate, water etc., to site and cost of all materials including centering using CaSteel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) -Columns
5.4
15446
83412
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using(50%50) of river sand and Manufactured Sand , 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Manufactured sand and River sand in the Ratio 50:50), coarse aggregate, water etc., to site and cost of all materials including centering using CaSteel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) -Pedestals
2.8
12314
34450
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using(50%50) of river sand and Manufactured Sand , 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Manufactured sand and River sand in the Ratio 50:50), coarse aggregate, water etc., to site and cost of all materials including centering using CaSteel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) -Footings
17.99
11572
208249
Building work;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using (Manufactured sand and River sand in the Ratio 50:50) , 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage chargesfor finished item of work for Foundations and Flooring Bed (APSS No. 402)
13.5
4954
66892
Building work;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using (Manufactured sand and River sand in the Ratio 50:50) ,40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations (APSS No. 402)
5.2
5134
26719
Building work;Ground Floor:- Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)
77.5
510
39550
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements