Telangana State Education Women And Infrastructure Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Education Women And Infrastructure Development Corporation Tender

Works
Civil And Construction
Civil Works Others
Opening Date27 Jan 2025
Closing Date30 Jan 2025
Tender Amount₹ 9,02,686 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building work;Vaccum dewatering of freshly laid cement concrete floor using 100% air tight suction mat of suitable size and length,vaccum pump to maintain vaccum pressure 0.7-0.8 atmosphere as per the standard procedure,floating with power floater,vibrating using Screed vibrator, mechanical trowelling, finishing with sound edges and corners,including hire and operational charges of machinery ,labour,fuel etc,complete for finished item as directed by the -in-Charge.

372

75

27900

... More
Building work;Construction of Sawn joint groove using Diamond studded blades 3 to 5mm wide, 25mm completing with clause 602.6.5 of specification of Roads & bridgs, filling the grooves with Bitumein hot sealing compound including cost and conveyance of all materilas and labour charges etc., complete for finished item of work.

310

125

38750

... More
Building work;Vibrated Cement Concrete M25 grade using 20mm & 10mm HBG crushed stone aggregate (coarse aggregate conforming to table 1000-1 and fine aggregate ( Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50 ) conforming to 1000-2) including cost,seiginiorage , conveyance of all materials to site and labour charges, centering, machine mixing laying, vibrating, curing etc, all operational, incidental and operational charges of all T&P etc, complete for finished item of work As per MoRT&H specification 1500,1700,2100& 2702 ( 4th Revision) and as directed by Engineer in charge For CC Pavement

56

5882

329423

... More
Building work;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50,40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage chargesfor finished item of work for Foundations and Flooring Bed (APSS No. 402)

48

4797

230263

... More
Building work;Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

52

512

26666



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.