Telangana State Education Women And Infrastructure Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Education Women And Infrastructure Development Corporation Tender

Works
Civil And Construction
Civil Works Others
Opening Date4 Mar 2024
Closing Date11 Mar 2024
Tender Amount₹ 17,82,385 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building work;Supply, Transportation and Installation of 1 HP Single phase open well ISI submersible motor pumpset. Makes: Texmo / CRI / KSB / Aryan Varsha / Lubi / Falcon

1

14200

14200

... More
Building work;Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges for placing and fixing in position as directed by Engineer-in-Charge.

1000

10

10500

... More
Building work;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007) OD Pipe SDR 13.522.20mm

12

186

2243

... More
Building work;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007) OD Pipe SDR 13.528.6mm

12

246

2961

... More
Building work;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, (TATA, SAIL, VSP,JSW & Shyam Steel) cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126)

1.5

78865

118298

... More
Building work;Providing impervious coat with required slopes in CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903).

121

453

54813

... More
Building work;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc, complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403)Sump Top slab-115mm thick Top slab-115mm thick

32

1309

41899

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) RCC Wall 200mm thick

11.9

12385

147382

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard blasted Trap crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Bottom Slab VRCC M20 for Slabs 150 mm thick

32

1531

49016

... More
Building work;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using,40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage chargesfor finished item of work for Foundations and Flooring Bed (APSS No. 402)

4

4408

17633

... More
Building work;Earth work excavation and depositing on bank (Manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Septic tank soak pit and sump.(APSS No. 308)

85

364

30987

... More
Building work;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, (TATA, SAIL, VSP,Jindal & Shyam Steel) cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126)

1.88

78865

148267

... More
Building work;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work .

670.67

219

147179

... More
Building work;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

670.67

412

276316

... More
Building work;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).

34.78

6794

236304

... More
Building work;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cms thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all opretional, incidental, labour charges , hire charges of T&P etc. complete for finished item of work (APSSNo. 309 & 310)

22.25

169

3762

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) FootingsFor Roof beam

1.09

11454

12485

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) FootingsFor Plinth Beam

7.23

12135

87739

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) FootingsFor Columns

6.28

12385

77778

... More
Building work;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) FootingsFor Footing

5.57

9594

53441

... More
Building work;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using , 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations (APSS No. 402)

5.18

4591

23786

... More
Building work;Earth work excavation and depositing on bank (manual means) with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work excluding seignerage charges and dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

34.53

364

12588



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.