Telangana State Education Women And Infrastructure Development Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Education Women And Infrastructure Development Corporation Tender

Works
Civil And Construction
Civil Works Others
Opening Date2 Mar 2024
Closing Date11 Mar 2024
Tender Amount₹ 7,42,132 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of compound wall;Supply and fixing of 32mm dia M.S. clampset.

2

175

350

... More
Construction of compound wall;Supply and fixing of 7/20 Service Wire

200

12

2400

... More
Construction of compound wall;Supply and fixing jointing Kit.

1

100

100

... More
Construction of compound wall;Supply and fixing of bore cover

1

100

100

... More
Construction of compound wall;Supply and fixing of 32mm dia G.I. Coupling.

2

50

100

... More
Construction of compound wall;Supply and fixing of 32mm dia G.I. bend.

2

70

140

... More
Construction of compound wall;Supply and fixing of 32mm dia HDPE SS Nipple.

2

385

770

... More
Construction of compound wall;Supply and fixing of 4 sqm 3 core cable wire.

360

110

39600

... More
Construction of compound wall;Supply and fixing 40mm dia HDPE pipe 10 Kg/ cm²

355

140

49700

... More
Construction of compound wall;Supply and Transportation of star rated ---Three phase ISI submersible motor pumpset suitable for 6" Bore well.Makes: Texmo / CRI / KSB / Aryan Varsha / Lubi / Falcon 5.00 HP 12-16 Stage (ELEC-5.6.1)

1

42109

42109

... More
Construction of compound wall;Geological survey charges for selection of bore point.

1

1000

1000

... More
Construction of compound wall;Supply and inserting of 180mm PVC 6 Kgs/Cm2 casing pipe ISI

20

624

12480

... More
Construction of compound wall;Drilling of 6 1/2" borewell with power rig to a finished dia in all formation to the bore to required depth and dia to suit lowering of 6 1/2" dia internal dia casing pipe with coupling fixing of pipe, flushing borewell at an average pressure of 150 PSI including transportation - 7th Depth - 240-260m

20

690

13800

... More
Construction of compound wall;Drilling of 6 1/2" borewell with power rig to a finished dia in all formation to the bore to required depth and dia to suit lowering of 6 1/2" dia internal dia casing pipe with coupling fixing of pipe, flushing borewell at an average pressure of 150 PSI including transportation - 6th Depth - 210m-240m

30

537

16110

... More
Construction of compound wall;Drilling of 6 1/2" borewell with power rig to a finished dia in all formation to the bore to required depth and dia to suit lowering of 6 1/2" dia internal dia casing pipe with coupling fixing of pipe, flushing borewell at an average pressure of 150 PSI including transportation - 5th Depth - 180-210m

30

471

14130

... More
Construction of compound wall;Drilling of 6 1/2" borewell with power rig to a finished dia in all formation to the bore to required depth and dia to suit lowering of 6 1/2" dia internal dia casing pipe with coupling fixing of pipe, flushing borewell at an average pressure of 150 PSI including transportation - 4th Depth - 150- 180m

30

419

12570

... More
Construction of compound wall;Drilling of 6 1/2" borewell with power rig to a finished dia in all formation to the bore to required depth and dia to suit lowering of 6 1/2" dia internal dia casing pipe with coupling fixing of pipe, flushing borewell at an average pressure of 150 PSI including transportation - 3rd Depth - 120 - 150m

30

372

11160

... More
Construction of compound wall;Drilling of 6 1/2" borewell with power rig to a finished dia in all formation to the bore to required depth and dia to suit lowering of 6 1/2" dia internal dia casing pipe with coupling fixing of pipe, flushing borewell at an average pressure of 150 PSI including transportation - 2nd Depth - 90-120m

30

335

10050

... More
Construction of compound wall;Drilling of 6 1/2" borewell with power rig to a finished dia in all formation to the bore to required depth and dia to suit lowering of 6 1/2" dia internal dia casing pipe with coupling fixing of pipe, flushing borewell at an average pressure of 150 PSI including transportation - 1st Depth - 90m

90

305

27450

... More
Construction of compound wall;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors

49.29

126

6245

... More
Construction of compound wall;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal Walls.(APSS No. 912) in All Floors

624.67

199

124434

... More
Construction of compound wall;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

624.67

560

350034



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.