Telangana State Cooperative Rural Irrigation Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Cooperative Rural Irrigation Corporation Limited Tender

Works
Civil And Construction
Building Construction
Opening Date7 Feb 2025
Closing Date21 Feb 2025
Tender Amount₹ 24,02,686 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of additional floor;Providing independent earthling by C450 excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete

1

3995

3995

... More
Construction of additional floor;Supply and Fixing of 16A/6A 3pin plug socket with shutter and 16A modular switch control duly recessed in wall with Galvanised hot deep box of with common switch board including earth connections and all labour charges etc., complete. Makes of Switches : Legrand myreus/Crabtree verona / Gold Madel curve / Million / LogusAnchor Roma viola / Great White /CPL/Vimal/ GM four-five/HPL/L&T

12

544

6531

... More
Construction of additional floor;Supply and fixing of 6A 3/2 pin Modular wall plug socket with shutter and 6A 1 way modular switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes of Switches : Legrand myreus/Crabtree verona / Gold Madel curve / Million / LogusAnchor Roma viola / Great White /CPL/Vimal/ GM four-five/HPL/L&T/Salzar / Stanjo

12

382

4590

... More
Construction of additional floor;Supply and fixing of modular Electronic stept type fan regulator hum free step type socket size with MS box, front plate in the existing switch board ( Modular Type ) Makes :Makes : Legrand Arteor / Schneider Zen celo / Honeywell Blenge Plus / Cabtree Amare / Logus Platina. ( ELEC-1.9.1.n)

22

763

16805

... More
Construction of additional floor;Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard / Gold Medal / Kundancab / HPL / RPG /Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal /Suncab. ( ELEC-1.5.4)

22

281

6200

... More
Construction of additional floor;Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box with hook including all Labour charges etc., complete.

22

237

5218

... More
Construction of additional floor;Supply of 48" (1200mm) 5 star rated Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings but without Regulator. with all standard accessories. Makes : Crompton / Bajaj / Orient. ( ELEC- 5.1.1)

22

3538

77856

... More
Construction of additional floor;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 18 Watt CFL bulb (for new installation).Makes : Gold Medal /Million / Vimal

6

222

1333

... More
Construction of additional floor;Supply and Fixing and transportation of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per ISspecifications, minimum CRI=80,.etc complete with 50,000 burning hours with BIs Certification. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. ( ELEC-3.9.10, ELEC-3.8.3)

15

829

12441

... More
Construction of additional floor;Supply and run of 2 of 2.5 Sq mm PVC F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications and 1 run of 1.00 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connection. Makes of Wires : Finolex / RR kabel / Havells / APAR EBXL / KEI /L&T / V-Guard.

150

154

23243

... More
Construction of additional floor;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant Low Smoke (FRLS) / HFFR P.V.C. insulated 1100 V Grade as per IS: 694 / 1990 specification for flexible copper cable (ISI MARK) in existing pipe with 6A 1 way flulsh type modular switch, Ceiling rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings Makes of Wires : Finolex / RR kabel Makes of Switches : Finolex/RR Cables/ Havells/ L&T/ V guard /APAR EBXL/KEI

30

833

24998

... More
Construction of additional floor;Supply and Fixing of ISI 25mm outer dia mediumgrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in wall with all required accessories including masonary work for light, fan and separate plug point with 8 or 9 Module Hot dip galvanized Metal Box including all labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision. ( ELEC-1.2.2, ELEC-9.1.4, ELEC-1.3.1, ELEC-1.1.5, ELEC-1.2.7, ELEC-9.4.11 )

60

136

8178

... More
Construction of additional floor;Supply and Fixing of ISI 25mm outer dia heavygrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision (ELEC-1.2.1, ELEC-1.1.5, ELEC-1.2.7 )

82

120

9844

... More
Construction of additional floor;Supply and fixing MS plain sheet door of Single leave of size 0.75x2.13mts made of with frame of equal angle of 40x40x6mm hor-2no, ver- 2no, shutter frame made of with equal angle 25x25x4mm hor-2no, ver-2no, welded with MS plain sheet 18guage, supported with MS flat 30x5mm-0.53mt long-1no at F/s and MS flat 25x5mm - 057 mts long 4no at B/s to each shutter and fixtures like MS Butt hinges of 125mm long -6no, MS Aldrop 300mm long-1 no, MS tower bolt -100mm long - 2no, MS hold fasts- 6no, sales & other taxes on all materials , red oxide primer grade -I quality one coat, labour charges etc complete for finished item of the work. shutter size 0.71 x 2.09 Mts

1

4503

4503

... More
Construction of additional floor;Supplying and fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded conenction conforming to IS 8931 including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

2

371

743

... More
Construction of additional floor;Dadooing to walls with any color glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work (APSS No.701 & 707) in All Floors

11.3

877

9912

... More
Construction of additional floor;Supplying and fixing 580 mm x 440 mm long Orissa pan white glazed Water Closet 1st qualityISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick masonry seat, CC squatting plate and fixing 12.70mm dia NP Push cock 1st quality , P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges etc., complete for finished item of work.

2

3136

6273

... More
Construction of additional floor;Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges for placing and fixing in position as directed by Engineer-in-Charge.

1000

11

11400

... More
Construction of additional floor;Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes with fittings in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for finished item of work.

20

267

5340

... More
Construction of additional floor;Supplying & fixing Ashirvad/Astral flow guard for equivalent CPVC Pipes with fittings in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges complete for finished item of work.

20

202

4045

... More
Construction of additional floor;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500/550 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.

3.8

82211

312405

... More
Construction of additional floor;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors

12

268

3227

... More
Construction of additional floor;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors

148.35

329

48815

... More
Construction of additional floor;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal Walls.(APSS No. 912) in All Floors

266

237

63135

... More
Construction of additional floor;Supplying and fixing of Unplasticised PolyVinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1- mesh shutter) duly manufactured using UPVC reinforced profiles (Compositionofprofileshall consists a minimum of 5.5 PHR of TiO2 andnot morethan12PHRofCaCo3forevery100parts of PVCresin) of (94mmx45mm) /(80mmx52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/ (54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced withhot dip galvanized up to 50 microns of minimum thicknessof1.0/ 1.2mmprefabricated & welded through fusion welding. The window sashshall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be 42mm x25mm) /(52mmx21.5mm)x 2.0mm fittedwithVinylCoatedFibremesh-onrollers/ pulley duly fixed with Grey colourTPVGasketfor sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single pont locking with Touch Lockand thesystemis to be installed at the site usinganchorfasteners, silicon rubber sealant, easyglazing/ deglazingat site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item ofwork. (TBSC-M.II-11)

12

8088

97059

... More
Construction of additional floor;Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Medium teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long MS Powder coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, MS Powder coated heavy Door stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

2

14603

29206

... More
Construction of additional floor;Flooring with Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete but including seigniorage charges for finished item of work.(APSS No.703 & 701)

2.5

1082

2707

... More
Construction of additional floor;Supplying and fixing of Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) in Single piece with the edges flat nosed and set over a base coat of CM (1:8), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work for Treads (APSS No.701 & 707)

6.6

1071

7072

... More
Construction of additional floor;Supplying and fixing of Polished Shabad/Tandur blue Slabas 15 to 18 mm thick (0.457M x 0.457M) in Single piece with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work For raisers (APSS No.701 & 707

4

1209

4837

... More
Construction of additional floor;Flooring with Nano polished vitrified floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less than 600 mm x 600 mm , 8mm thickness regular finish and normal colours with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)

111.1

1410

156740

... More
Construction of additional floor;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)

0.33

7451

2459

... More
Construction of additional floor;Providing impervious coat with required slopes in CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903).

127

824

104774

... More
Construction of additional floor;Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for Internal walls

94.6

287

27216

... More
Construction of additional floor;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)

49.35

891

43972

... More
Construction of additional floor;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)

99

827

81891

... More
Construction of additional floor;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

49.5

856

42407

... More
Construction of additional floor;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

102

792

80876

... More
Construction of additional floor;Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site,, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

164

831

136377

... More
Construction of additional floor;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work (APSS No. 402 & 403)

0.6

18479

11088

... More
Construction of additional floor;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete including seigniorage charges for finished item of work. (APSS No. 501 & 504).

5.3

11746

62258

... More
Construction of additional floor;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete including seigniorage charges for finished item of work. (APSS No. 501 & 504).

18.05

11169

201608

... More
Construction of additional floor;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work butincluding seigniorage charges (APSS No. 402 & 403)

11.55

2426

28024

... More
Construction of additional floor;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work butincluding seigniorage charges (APSS No. 402 & 403)

126.7

2047

259387

... More
Construction of additional floor;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work butincluding seigniorage charges (APSS No. 402 & 403)

8.2

16583

135986

... More
Construction of additional floor;Vibrated Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work butincluding seigniorage charges (APSS No. 402 & 403)

3.2

19506

62422

... More
Construction of additional floor;Item Detailed Specification Description

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.