Telangana State Cooperative Rural Irrigation Corporation Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 27,833Document Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
556180Tender No
03/EE/RR/SDF/2024-25 DT: 11.11.2024Tender Authority
Telangana State Cooperative Rural Irrigation Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
laying of SWG line;Additional manhole 0.10 M depth constructon of 0.90 circular sewer man hole of 0.90 mts depth with Fly Ash bricks in CM(1:6) Prop as per specification etc complete. benching / chanelling,internal plastreng with 20 mm thick cm 1:4 and External Plasterng with 12mm thick CM (1:4) with fine rendering including cost and fixing of CI steps and fixing FC/ CI cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days complete all as per specification etc complete.
8.4
1126
94660
laying of SWG line;Constructon of 0.90 M Circular Sewer Man hole of 0.90 mts x 0.55 m of 0.90 M depths with Fly Ash bricks in cm 1:6 prop and corbelling too including cc bed ( 1: 4 : 8 ) prop using 40 mm gauge HG Metal 0.10 mt thick and CC (1:2:4) Prop benching / chanelling,internal plastreng with 20 mm thick cm 1:4 and External Plasterng with 12mm thick CM (1:4) with fine rendering including cost and fixing of CI steps and fixing FC/ CI cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days completeas per specification etc complete.
46
15861
729624
laying of SWG line;Refilling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyence of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work.
367
62
22783
laying of SWG line;Carting the excavated earth to a lead of 10 KMS including Labour chargess for loading and unlosding, Transportation etc. complete as per specification
141.5
258
36508
laying of SWG line;Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn but excluding cost and conveyance of pipe. (Reference to specifications BIS No. 6530/72)
329
576
189567
laying of SWG line;Supply and laying of Mdpe Pipe water pipe of 12mm dia. For house hold water connections
54
80
4320
laying of SWG line;Redoing of House Hold Connections to the complete including cost and conveyance of materials , jointing and testing charges to complete item of work.
55.5
339
18844
laying of SWG line;Supply of SWG SP-1 pipe conforming to ISI 651 - 12" dia (300 mm)
329
1928
634486
laying of SWG line;Excavation in Hard rock (blasting prohibited) with rock breakersin hard rock including breaking rock, stacking of materials as per technical specifications 302.3.5
50
2785
139286
laying of SWG line;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH
449.5
357
160881
laying of SWG line;Cutting open C.C. road surface including stacking of excavated materials including hire charges of all tools and plants and all labour charges for finished item of work as directed by the Engineer - in - Charge.
58.2
2520
146715
laying of SWG line;Item Detailed Specification Description
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%