Telangana State Cooperative Oilseeds Growers Federation Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
469024Bid Award Id
ViewTender No
P&P/CIVIL WORKS-SIDDIPET/656/23-2Tender Authority
Telangana State Cooperative Oilseeds Growers Federation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Off Take Sluice Hoist & Hoist Bridge Gear Hoist Including Platform for Below 5 Tons Capacity(SmallGates): Fabrication, supply, erection, testing and commissioning of Embedded Parts consisting of Supporting Strucure and Platform etc with all accessories for sluice shutters including cost of Bearings, Forged Steel Plate,Cover, Screw Rod Base, Nuts,Shaft etc and all material machinery,labour, cutting, bending, aligning, anchoring,welding, applying primary coat with two coat of Zinc Chromite Red oxide primer followed by finishing three coats with synthetic enamel paint with material labour and all accessories with all leads and lifts. finishing etc complte as per specification of drawings and as directed by Engineer - in -charge.
2
161497
322995.8
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Off Take (OT) Sluice Gate: Fabrication, supply, erection, testing and commissioning of Skin plate,Horizontal and vertical angles , stiffeners, rubber seals ,clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc,applying primary coat with two coat of Zinc Chromite Red oxide primer followed by finishing three coats with synthetic enamel paint with material labour and all accessories with all leads and lifts etc complete as per specification of drawings and approved drawings and as directed by Engineer - in -charge
1.1
279283
307212.07
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Off Take (OT) sluice E & M Parts: Fabrication, supply, erection, testing and commissioning of sill beam,slide tracks,seal seats, SS guide plates etc with all accessories including cost of material,machinery,labour, applying primary coat with two coat of Zinc Chromite Red oxide primer followed by finishing three coats with synthetic enamel paint with material labour and all accessories with all leads and lifts.etc complte as per specification of drawings and approved drawings and as directed by Engineer - in -charge.
1.05
118012
123913.54
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Laying and Jointing 600mm dia NP2 class or IRC standard Hume pipes in CM 1:2 proportion by volume including cost of all materials( exculding pipes and collars), machinery,labour, aligning, packing joints with hemp, finishing, curing etc,. Complete with initial lead upto 50m and all lifts.(Cement content:24.8 Kg/joint, FA:0.025 cum/joint, Hemp yarn:0.22 kg/joint)
166
687
114174.8
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Manufacture, & installation of 600mm dia R.C.C Spun /Vibrated Cast (Reinforced) Socket and Spigot Pipes conforming to B.I.S 458/2003 (Payment will be made for effective length of the pipe laid in position)
390
1933
754154.7
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing, fabricating and placing in position reinforcement steel TMT bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with all leads and all lifts.
2700.47
84
229269.9
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Constructing 904.0 mm (3'0") dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.
3
9959
29878.47
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Laying and Jointing 300mm dia NP2 class or IRC standard Hume pipes in CM 1:2 proportion byvolume including cost of all materials( exculding pipes and collars), machinery,labour, aligning, packing joints with hemp, finishing, curing etc,. Complete with initial lead upto 50m and all lifts.(Cement content:24.8 Kg/joint, FA:0.025 cum/joint, Hemp yarn:0.22 kg/joint)
66
600
39600
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Supply & Installation of NP2 RCC Hume pipe of 300mm Diameter Spun /Vibrated Cast (Reinforced) Socket and Spigot Pipes conforming to B.I.S 458/2003 (Payment will be made for effective length of the pipe laid in position)
165
1390
229350
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and fixing MS Ladder fabricated with MS structural steel of approved make and size as per the instructions of Engineer-in-charge.
300
125
37500
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and fixing 100 mm dia perforated PVC pipes 40 cm long for Weep holes including cost of all materials, labour, drilling 8 mm dia holes etc. complete with all leads and lifts.
71
241
17132.3
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and Fixing 20mm thick 150mm depth tarfelt expansion joint filler boards for cement concrete lining of canal including cost of all materials, labour etc,. Complete with all leads and lifts.
160
121
19488
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and constructing sand filters in the bed of the canal, below lining using clean approved sand satisfy filter criteria including cost of all maerials, machinery, labour, compacting etc,.complete with initial lead upto 50m and alllifts.
240.75
809
194959.35
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Back Filling with useful excavated earth above pipes including breaking clods, spreading in layers of 10 to 15 cm watering, compaction by Compactor.Lead upto a distance of 5 KM including hire charges of T & P, labour charges,Conveyance Charges of Soil, Loading & Unloading Charges etc., and overheads & contractors profit complete for finished item of work.
1841.62
108
198894.96
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining(of thickness 100 mm) of canal including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
13
6988
90851.8
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for wearing coat including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
15
6605
99088.5
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for for slabs for small culverts span upto 2 mts including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
7
8832
61824.7
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for Sub Structure /Super Structure works including cost of all materials, labour, machinery, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts. ( Cement content : 330 kg / cum with use of super plasticiser, CA : 0.80 cum, Blending Ratio of CA -- 65:35, FA : 0.45 cum) M-20 Grade-20MM Metal - For Bed Blocks
25
7675
191877.5
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
174
6893
1199486.4
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 320 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum)
61
7541
460025.4
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
130
6517
847275
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for Levelling course including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.
27
6517
175972.5
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Excavation in ordnary rock without blasting for foundations of canal cross drainage and other appurtenant structures and placing the excavated stuff neatly in specified dump area or disposing off the same as directed etc., complete with initial lead upto 50 m and initial lift upto 3 m.
600
157
94200
... More
CONSTUCTION OF CR AND OFF TAKE AT NARMETTA;Earth work in excavation in all kinds of soils- Mechanical Means for foundation of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps, dewatering and other deleterious matter, dressing of sides and bottom and back filling with approved/available material.(Depth upto 3 m ) up to a lead of 10 Meters.
2341.71
123
288498.67
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements