Telangana State Cooperative Oilseeds Growers Federation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Cooperative Oilseeds Growers Federation Limited Tender

Civil And Construction
Water Storage And Supply
Opening Date21 Jun 2023
Closing Date28 Jun 2023
Tender Amount₹ 4,36,40,542 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONSTRUCTION OF WATER STORAGE POND;Formation of embankments using excavated soil in layers not exceeding 30cms thick consolidating each deposit layer including spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller including all hire and operational charges of T&P, cost and conveyance of water to work site incidental, labour charges, for formation of bunds,prepartion of sub-base for internal roads as directed by Engineer -In- charge including up to a lead of 3.0 km

30000

48

1440000

... More
CONSTRUCTION OF WATER STORAGE POND;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING - Upto GL

50

4284

214200

... More
CONSTRUCTION OF WATER STORAGE POND;Supply and placing of Plain Cement Concrete (1:2:4) (cement: fine aggregate: Coarse aggregate)g to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)

55

6350

349250

... More
CONSTRUCTION OF WATER STORAGE POND;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

1

86614

86397.47

... More
CONSTRUCTION OF WATER STORAGE POND;Providing and Constructing Dry rubble stone pitching 22.5 cm thick laid in courses and required profile on slopes with hammer dressed stones having no side less than 15 cm, with minimum depth of 20 cm, including flush pointing at joints in cement mortar 1:4 (1 cement : 4 Fine sand),Pin header (Through stone) 40 cm at every 3.0 sqm area including preparing the bedding surface, filling interstices with moorum, 20mm,40mm stone aggregate, consolidation with mechanical compactor etc. all complete with cost of materials,labour,hand packing,finishing etc.,

12123

1004

12171492

... More
CONSTRUCTION OF WATER STORAGE POND;Recovery to be made from above item(item No: 8 Providing and Constructing Dry rubble stone pitching 22.5 cm ) for using rubble stone obtained from blasting after hand dressing to suitable size and shape for revetting / dry stone pitching. Actual amount of recovery will be based on area of dry stone pitching done by using rubble stone obtained from blasting. Quantity mentioned is only for operation of item. However it may likely to increase depending up on availability of rubble stone.

1

254

-254

... More
CONSTRUCTION OF WATER STORAGE POND;Providing and laying non-pressure NP2 class R.C.C.pipes 450 mm dia with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints in trenches to the required level and line including all accessories like collers, bends, sockets and jointing complete all incidental, operational, labour charges such as cutting, placing in position, jointing on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work

160

2098

335696



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.