Telangana State Cooperative Oilseeds Growers Federation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Cooperative Oilseeds Growers Federation Limited Tender

Works
Civil And Construction
Building Construction
Opening Date17 Sep 2023
Closing Date26 Sep 2023
Tender Amount₹ 5,91,69,980 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of telephone jack type socket with top on MS box with modular plate cover with screws connections etc., Makes : GM G Home / Gold Medal Olive / Million Zoom /Anchor Penta Cherry / Great white Omega / HPL

5

565

2826.75

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and laying of LAN cable Cat-6(A) UTP CABLE in the existing metallic/non metallic conduit pipe with connections etc.,complete Makes:D Link/ AMP / Molex / Legrand / Krone

90

44

3964.5

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and laying of 2 pair telephone wire in the existing metallic/non metallic conduit pipe with connections etc.,complete Makes : Finolex / Delton / Surabi / Polycab

80

26

2108

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and transportation of 60W LEDStreet light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Suitable lens on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >110 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates.fixing on wall with 1.0mt 40mm dia GI pipe bracket and anti-tilting MS flat, 2.5 Sq.mm flexible copper cable etc.,including all labour charges for mason work and giving connections etc.,. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Surya / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA / Capart / Fortune Arrt / FIEM / Panasonic / Arraystorm / GM / Goldmedal / Silicon / Leksa / Orient / HPL LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. Makes: Finolex / RR kabel / Havells / Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR)

1

7080

7080.7

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete

8

619

4954.48

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply,Transportation of light duty exhaust fan 9"(225 mm) size 900 rpm with metal blades wiremesh with all accessories etc complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.

8

1783

14264

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and erecting 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan complete.

12

180

2167.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard (HFFR) / Gold Medal / Kundancab / HPL / RPG /Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal /Suncab

12

231

2779.8

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of modular Electronic stept type fan regulator hum free step type socket size with MS box, front plate in the existing switch board ( Modular Type ) Makes Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

12

620

7441.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient

12

3503

42046.8

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of batten holder / slanting holder (Makes : Anchor / Gold Medal Olive / Million Zoom). in lieu of ceiling rose of light point complete with all connections and all labour charges with 9 Watt LED lamp Makes : Phillips / Crompton / Bajaj / Surya / Havells / HPL/ Halonix.

5

223

1116.5

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and Fixing and transportation of 20W +/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification, fixing on wall / Ceiling with / TW round blocks, 23/0060 Twin Core wire with all accessories including giving connections and all labour charges etc., complete. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

44

831

36575

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing 8 Way SPN Distribution board with IP-43 protection (Metal Door) suitable for 1 No. 40 A single phase ELCB / RCCB/DP Isolator as incomer and 8 Nos. 6-32 A 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete Makes : Legrand / Schneider / Siemens / L&T

5

6674

33374.45

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and run of 5 of 10 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications and 1 run of 6 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connections Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

50

889

44460

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and run of 3 of 6 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connections Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

90

346

31225.5

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and run of 3 of 4 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connection Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

450

254

114660

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and run of 3 of 2.5 Sq mm PVC F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connection. Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

295

167

49515.75

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and run of 1 of 22/0.3 mm ( 1.5 sq.mm) FRLS / HFFR PVC insulated 1100 V grade as per IS: 694 / 1990 specifications for flexible copper cable for existing pipe for earth continuity including all labour charges etc., complete. Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

300

39

11985

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and Fixing of 16A/6A 3pin plug socket with shutter and 16A modular switch control duly recessed in wall with Galvanised hot deep box of with common switch board including earth connections and all labour charges etc., complete. Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

15

490

7362.75

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of 3 Nos 6A ISI mark Modular type switch with 3Nos 6A 3/2 pin wall plug socket on suitable size Modular deep box with cover frame GI switch box fixing on separate board including all labour charges etc., complete. Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

10

1214

12140.5

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Wiring with 3 of 22/0.3mm ( 1.5 Sq.mm) FRLS / HFFR P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch and 6A, 3/2 pin socket Modular type with 6A switch control and MS boxes with cover plate and GI switch box fixing on separate board including all labour charges etc., complete. Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR). Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

16

573

9173.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of 6A 3/2 pin Modular wall plug socket with shutter and 6A 1 way modular switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

12

340

4083.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant Low Smoke (FRLS) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A 2 Way Modular switch, Ceiling rose and Modular cover frame to switch control box including all labour charges etc., complete for Stair case and 2 way light / fan points in Non-Residential Buildings Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR). Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

2

1372

2744.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant Low Smoke (FRLS) / HFFR P.V.C. insulated 1100 V Grade as per IS: 694 / 1990 specification for flexible copper cable (ISI MARK) in existing pipe with 6A 1 way modular switch, Ceiling rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR). Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

72

914

65869.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box with hook including all Labour charges etc., complete.

72

210

15174

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and Fixing of ISI 25mm outer dia mediumgrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in wall with all required accessories including masonary work for light, fan and separate plug point with 8 or 9 Module Hot dip galvanized Metal Box including all labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

700

117

82250

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and Fixing of ISI 25mm outer dia heavygrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

1050

105

110565

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work.

500

11

5680

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying & Fixing Indian make white glazed vitreous china porcelain sink conforming to IS:2556-Part-5-1994 on cantilever brackets with waste fittings like rubber plug, chain,32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 : 750 x 450 x 250of Ist quality ncluding chiselling brick masonry wall and making good & restoring to original surfaces overheads & contractors profit complete.for finished item of work in all floors..

1

6315

6315

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all labour charges, overheads & contractors profit complete for finished item of work for all floors.

7

107

749

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of SWR PVC pipes (Prince/ Sudhakar/ Kisan/ Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) - 110mm dia

17

362

6154

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of SWR PVC pipes (Prince/ Sudhakar/ Kisan/ Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)-75mm dia

20

258

5160

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work.-32mm Nominal bore

1

2337

2337

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work.-25mm Nominal bore

3

1538

4614

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work.-20mm Nominal bore

3

1070

3210

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels.54.00mm OD pipe

3

699

2097

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels.41.30mm OD pipe

24

479

11496

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels.-34.90mm OD pipe

11

386

4246

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels.- 28.60mm OD pipe

18

284

5112

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels.-22.20mm OD pipe

25

237

5925

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels.-15.90mm OD pipe

12

197

2364

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 7 - 10 years warranty with necessary fittings etc., complete including cost and conveyance of all materials, labour charges, overheads & contractor profit complete for finished item of work in all floors.

2

4019

8038

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing 15 mm brass body CP finish self closing tap push type conforming to IS 1711 as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work in all floors.

2

368

736

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931 as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , overheads & contractors profit complete for finished item of work in all floors.

3

323

969

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of 25.4mm dia, 609.6mm long aluminium anodized towel rods with brackets and aluminium screws including cost and conveyance of all materials, labour charges , overheads & contractors profit for finished item of work.

3

207

621

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm , plywood back with NP screws 1st quality including cost and conveyance of all materials, labour charges , overheads & contractors profit for finished item of work in all floors.

3

641

1923

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing CP finish brass soap dish of approved make ISI quality including cost and conveyance of all materials, labour charges for fixing, overheads & contractors profit for finished item of work in all floors

3

737

2211

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make heavy duty complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock 12.70mm dia. first quality Indian make heavy duty, 30mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work.

3

3187

9561

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal components and fixed using required size of nails and screws, 15 mm nominal size CP finish brass angled stop valve screw type with internal /external threaded conforming to IS 8931, 12mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

3

6523

19569

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

4

194

776

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

1

16142

16142

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

5

9959

49795

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of SWG Gully traps 150mm x 100mm of ISI make confirming to IS 651 & 4127 with C.I grating & constructing cement brick masonry in CM (1:6) prop., intermediate chamber and fitted with 304.8 mm X 288.6 mm (12"x9") C.I Frame with hinged cover of standard make as approved including cost and conveyance of all materials to site, labour charges, overheads & contractors profit etc., complete for finished item of work.

4

792

3168

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

4

5238

20952

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318).-152.40mm dia upto 1524.0mm (5') depth

45

975

43875

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and laying, filling, jointing and testing SWG SP-1 pipe conforming to ISI 651 & 4127 with air tight Cement joints in CM (1.5:1) prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping to the required slope including cost and conveyance of all materials to site and all labour charges , overheads & contractor profit etc., complete for finished item of work (APSS NO 1301 & 1318). - 101.60mm dia upto 914.40mm (3') depth

5

583

2915

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, excluding taxes like GST on all materials , incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

17

193

3281

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of MS Grill to windows / in open court yards using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 300mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including cost all taxes and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

17

1430

24310

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin). Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractor profit etc., complete for finished item of work.

0.4

7279

2911.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractors profit etc., complete for finished item of work. W2

17

8088

137496

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of not less than 10mm) (800mm x 2100mm). D2

1.7

5666

9632.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Aluminium fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1000mm x 2100mm). MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Aluminium fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1000mm x 2100mm). D1

4.2

4741

19912.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing dadooing to walls with glazed full body ceramic tiles of any size and thickness between 5 to 7mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work.OHSR

11

1203

13233

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing skirting to internal walls up to 10 cm height with with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 &707). OHSR

47

111

5217

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707) OHSR

3

951

2853

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707). OHSR

81

1122

90882

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). OHSR

163

532

86716

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) OHSR

20

178

3560

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). OHSR

139

532

73948

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Ornamental ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in- harge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) -OHSR

84

547

45948

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 402)- OHSR

0.6

5986

3591.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509).

9

905

8145

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Masonry work in CM (1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 501 & 504).

21

8228

172788

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Aluminium fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1000mm x 2100mm). Lintels

0.8

14360

11488

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply of Structural Steel hollow Square & Rectangular sections conforming to IS 4923-1997 for Railing including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit for finished item of work.etc., complete for finished item of work in all floors for stair case head room roof.

2000

146

292000

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST. up to 26.15 m level

139

145

20155

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST. up to 23.25 m level

121

135

16335

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST. up to 20.80 m level

139

125

17375

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST. upto 18.00 mts level

121

115

13915

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST.upto 15.00 mts level

197

105

20685

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST.upto 12.00 mts level

197

95

18715

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST.upto 9.00 mts level

197

85

16745

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST.upto 6.00 mts level

197

75

14775

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST.upto 3.00 mts level

197

65

12805

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904 up to 26.15 m level

139

337

46843

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904 up to 23.25 m level

121

319

38599

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904 up to 20.80 m level

139

301

41839

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904 upto 18.00 mts level

121

283

34243

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904 upto 15.00 mts level

197

265

52205

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904 upto 12.00 mts level

197

247

48659

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904 upto 9.00 mts level

197

228

44916

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) upto 6.00 mts level

197

210

41370

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) upto 3.00 mts level

197

192

37824

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).at 26.15 mt level

81

974

78894

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). at 20.80 mt level

81

884

71604

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing and applying food grade epoxy based water proof coat over existing RCC/Concrete flooring surfaces in three-part applications containing low solvent - coloured, epoxy resin based coating with low voc properties specially formulated for food grade application for potable water storage tanks in ambient temperatures including cost and conveyance of all materials , labour charges , overheads and contractors profit etc., complete for finished item of work in all floors.Total Quantity

334

377

125918

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing impervious coat to exposed RCC roof slab surfaces of sump, sump side wall,sump bottom slab, in side of septic tank, in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand 12mm thick mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). RCC Side walls @ 23.35 mts level

167.4

299

50052.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing impervious coat to exposed RCC roof slab surfaces of sump, sump side wall,sump bottom slab, in side of septic tank, in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand 12mm thick mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). RCC Side walls @ 18.00 mts level

167.4

275

46035

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). OHSR At 26.15m level

5.4

97578

526921.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). OHSR At 23.25m level

3.9

95964

374259.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). OHSR At 20.8m level

18.2

94349

1717151.8

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). OHSRAt 18.0m level

4.2

92734

389482.8

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). OHSR At 15.0m level

3.1

91119

282468.9

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). OHSR At 12.0m level

3.1

89504

277462.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). OHSR At 9.0m level

3.1

87889

272455.9

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). OHSR At 6.0m level

3.1

86274

267449.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). OHSR At 3.0m level

9.4

84659

795794.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock. Steps up to 26.15level

0.4

9913

3965.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock. Steps up to 23.25 level

0.4

9612

3844.8

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock.Steps up to 20.80 level

0.4

9311

3724.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock.Steps up to 18.00 level

0.4

9010

3604

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock.Steps up to 15.00 level

0.4

8709

3483.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock. Steps up to 12.00 level

0.4

8408

3363.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock. Steps up to 9.00 level

0.4

8108

3243.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock. Steps up to 6.00 level

0.4

7807

3122.8

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock.Steps up to 3.00 level

0.4

7506

3002.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 150mm thick Roof Slab @ 26.15 mts level :

86

2131

183266

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 150mm thick Roof Slab @ 20.80 mts level :

86

2043

175698

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 200mm thick Roof Slab @ 23.25mts level :

86

2497

214742

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 200mm thick Roof Slab @ 18.00 mts level :

86

2403

206658

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 150mm thick Roof Slab @ 23.25mts level :

13

2090

27170

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 150mm thick Roof Slab @ 20.80 mts level :

13

2043

26559

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 150mm thick Roof Slab @ 18.00 mts level :

13

2003

26039

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 150mm thick Roof Slab @ 15.00 mts level :

13

1961

25493

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 150mm thick Roof Slab @ 12.00 mts level :

13

1920

24960

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 150mm thick Roof Slab @ 9.00 mts level :

13

1879

24427

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 150mm thick Roof Slab @ 6.00 mts level :

13

1837

23881

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 150mm thick Roof Slab @ 3.00 mts level :

13

1761

22893

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR 125mm thick Roof Slab @ 3.00 mts level :

86

1582

136052

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR Roof Beams @ 26.15 mts level :

6.8

16289

110765.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR Roof Beams @ 23.25 mts level :

6.7

15936

106771.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR Roof Beams @ 20.80 mts level :

6.8

15581

105950.8

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc.,including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR Roof Beams @ 18.00 mts level :

6.7

15226

102014.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR Tie beam @ 15.00 mts level

8.6

14872

127899.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR Tie beam @ 12.00 mts level

8.6

14517

124846.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR Tie beam @ 9.00 mts level

8.6

14164

121810.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR Tie beam @ 6.00 mts level

8.6

13809

118757.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR Roof beam @ 3.00 mts level

6.3

13220

83286

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR 230mm thick RCC Side walls @ 23.35 mts level

95.4

4219

402492.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR 230mm thick RCC Side walls @ 18.00 mts level

95.4

4160

396864

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR Columns 23.25 m level to 26.15 m level

8.22

19849

163158.78

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR Columns 20.80 m level to 23.25 m level

6.95

19327

134322.65

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR Columns 18.00 m level to 20.80 m level

7.94

18806

149319.64

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR Columns 15.00 m level to 18.00 m level

8.51

18284

155596.84

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR Columns 12.00 m level to 15.00 m level

8.51

17761

151146.11

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR Columns 9.00 m level to 12.00 m level

8.51

17240

146712.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR -Columns 6.00 m level to 9.00 m level

8.51

16718

142270.18

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR - Columns 3.00 m level to 6.00 m level

8.51

16197

137836.47

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) OHSR - Columns 0.00 m level to 3.00 m level

8.51

14504

123429.04

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) - OHSR -Columns Upto Plinth beam @ 0.00 m level

6.4

14504

92825.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Plinth beams-OHSR

9

13962

125658

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Footings- OHSR

38.4

10956

420710.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing and fixing of Expansion joint filler board for buildings, columns, beams and slabs 25 mm thick including cost and conveyance of all materials to site, all incidental, operational, labour charges etc.overheads & contractors profit complete for finished item of work as per approved drawing for all floors

49

483

23667

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing and fixing concertina coil fencing with punched tape concertina coil 600mm dia 10metre openable length (total length 90 m), having 50 Nos rounds per 6 metre length, upto 3m height of wall with existing angle iron Y-shaped placed 2.4m or 3.0 mt apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tiled with G.I. staples and G.I clips to retain horizontal, including necessary bolts or G.I. barbed wire tiled to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape (R.B.T)/spring core(2.5mm thick) wire of high tensile strength of 165 Kg/Sq.mm with tape (0.52 mm thick ) and weight 43.478 gm/metre (Cost of M.S.angle, C.C Block shall be paid seperately) etc., including cost and conveyance of all materials , labour charges , overheads and contractors profit etc., complete for finished item of work in all floors.

736

345

253920

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing in postion water stopper 8 - 10 mm thick 310 mm wide including cost and conveyance of all materials to site and sales and other taxes except GST on all materials to site etc., complete for finished item of work

108

521

56268

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (5th revision)

103

397

40891

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Construction of reinforced cement concrete crash barriers using M 35 grade by using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for crash barriers

200

3885

777000

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th revision) for finished item of work.

576

1919

1105344

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing and laying a minimum of 80 KN/M High tensile strength of "Polyester Bi-Axial Geo-grid" made of high tenacity polyster yarn by knitting/weaving and coated with pvc/latex/bitumen and it shall have the ultimate tensile strength of 80KN/M in both machine and cross machine directions, with the tensile strength @ 5% strain should not be less than 60KN/M and tensile elongation ( MD & CMD) not more than 10% confirming to the standards of ASTM D6637 and the other relevant standard codes and laying of geo-grid at required locations as sub grade reinforcement etc., complete as per the direction of Engineer-in-charge. (The unit rate of item includes cost of materials, transportation,testing charges, and equipment required to lay the geo-grid etc., and net plan area is only considered for payment)

2160

250

540000

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing and laying a minimum of 100 KN/M High tensile strength of "Polyester Bi-Axial Geo-grid" made of high tenacity polyster yarn by knitting/weaving and coated with pvc/latex/bitumen and it shall have the ultimate tensile strength of 100KN/M in both machine and cross machine directions, with the tensile strength @ 5% strain should not be less than 60KN/M and tensile elongation ( MD & CMD) not more than 10% confirming to the standards of ASTM D6637 and the other relevant standard codes and laying of geo-grid at required locations as sub grade reinforcement etc., complete as per the direction of Engineer-in-charge. (The unit rate of item includes cost of materials, transportation,testing charges, and equipment required to lay the geo-grid etc., and net plan area is only considered for payment)

4620

287

1325940

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Construction of RS wall (Designed Hundred years life) which includes designs detailed drawings, procurement of all required material for concrete ( M-35 grade ) for panels / blocks for facia required material for concrete ( M-35 grade ) for panels/ blocks for facia , required reinforcement, all necesarry accessories , geotextile material for wrapping the reinforced soil layers and the drain pipe , pvc drain pipe , all required mechinery , supervision, quality checks , coordinating wall construction with soil filling behind walls ( as per reinforced soil wall approved design and drawing) .Defect liability period , all leads , lifts and temporary form work if necessary, complete for finished iteam of work for different ranges of heights(2m increment ) in accorance with MORTH specification 1500,1600,1700,2200 and 3100 for materials construction and quality ( excluding block/pad ang ground improvement, fill material/ compaction etc) in the height range. 4.00-6.00 m height

520

3791

1971320

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Construction of RS wall (Designed Hundred years life) which includes designs detailed drawings, procurement of all required material for concrete ( M-35 grade ) for panels / blocks for facia required material for concrete ( M-35 grade ) for panels/ blocks for facia , required reinforcement, all necesarry accessories , geotextile material for wrapping the reinforced soil layers and the drain pipe , pvc drain pipe , all required mechinery , supervision, quality checks , coordinating wall construction with soil filling behind walls ( as per reinforced soil wall approved design and drawing) .Defect liability period , all leads , lifts and temporary form work if necessary, complete for finished iteam of work for different ranges of heights(2m increment ) in accorance with MORTH specification 1500,1600,1700,2200 and 3100 for materials construction and quality ( excluding block/pad ang ground improvement, fill material/ compaction etc) in the height range. 2.00-4.00 m height

624

3412

2129088

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Construction of RS wall (Designed Hundred years life) which includes designs detailed drawings, procurement of all required material for concrete ( M-35 grade ) for panels / blocks for facia required material for concrete ( M-35 grade ) for panels/ blocks for facia , required reinforcement, all necesarry accessories , geotextile material for wrapping the reinforced soil layers and the drain pipe , pvc drain pipe , all required mechinery , supervision, quality checks , coordinating wall construction with soil filling behind walls ( as per reinforced soil wall approved design and drawing) .Defect liability period , all leads , lifts and temporary form work if necessary, complete for finished iteam of work for different ranges of heights(2m increment ) in accorance with MORTH specification 1500,1600,1700,2200 and 3100 for materials construction and quality ( excluding block/pad ang ground improvement, fill material/ compaction etc) in the height range. 0-2.00 m height

680

3412

2320160

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

668

7496

5007328

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Construction of Granular sub-base by providing HBG material confirming to Grading - III of MORT & H Table 400-2 including cost and conveyance of all material to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix place method with Rotavator/ approved means, at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT& H specification 401 (4th revision) and as directed by the Engineer- in - charge (Payment will be made based on levels for finished item of work)

3168

1961

6212448

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Vibrated cement concrete M15 Grade using Max size of 40mm hard broken graded trap metal SS-5 and 20 mm & 10 mm size HBG crushed stone aggregate (ss-5) including cost seignorage and conveyance of cement and all materials to site and all labour charges for mechine mixing laying in position . compacting ,vibrating and curing including all other incidental and all other operational charges of T&P required etc, complete as per MORT& H Specification 1500,1700& 2100 for Leveling pad as per approved reinforced soil wall drawing . for Levelling Pad

51

5154

262854

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing 160 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., and overheads & contractors profit complete for finished item of work. (APSS No. 1328) First Floor

12

555

6660

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing pitched roof cladding with terracota tiles of size 125mm x 200mm and 12mm to 15mm thick set over base coat of CM(1:3) 12mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water , scaffolding etc., and overheads & contractors profit complete for finished item of work. Ground Floor

117

781

91377

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying, fabricating, hoisting,erecting in position structural steel works comprising of trusses, lattice girders, brackets, column, bracing, rafters and other connected works with necessary joints, channels, angles, I-section, plates, bolts and nuts, washers as showin in the detailed approved drawings including cutting, welding, hoisting and painting redoxide primer one coat before erection including cost and conveyance of all materials, labour charges for fabrication erection at site work for all heights etc., complete as directed by the Engineer-in-Charge. Ground Floor

2.2

124613

274148.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fabricating, erecting and fixing in steel works like MS Gate,Window Grills, Compound Wall Grills, Iron Doors, Windows, compound wall angles including cost of welding rods, power charges of approved design and including cost and conveyance of all materials, labour charges for erecting & fixing all structural steel works erecting in position and fixing etc., complete in position, labour charges for fabrication, all incidental charges, overheads and contractor profit etc., complete for finished item of work as directed by the Engineer-in-Charge angle Ground Floor

5204

126

655704

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing impervious coat to exposed RCC roof slab surfaces of sump, sump side wall,sump bottom slab, in side of septic tank, in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand 12mm thick mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Second Floor/Terrace Floor

12

226

2712

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing impervious coat to exposed RCC roof slab surfaces of sump, sump side wall,sump bottom slab, in side of septic tank, in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand 12mm thick mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Ground Floor:

187

202

37774

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Second Floor/Terrace Floor

154

658

101332

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).First Floor

111

613

68043

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903). Ground Floor

59

567

33453

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of Two shutters cupboards as per drawing with medium teak wood frames of size 75mm x 40mm section with 2 Nos styles and 3 Nos rails at top, bottom and Middle rails and shutters of MDF Board Interior grade both sides laminated 18mm thick of 4Nos shutters size each of 0.987 x 0.7 m with 18mm x 12mm alround teak wood beading to each shutter including fixtures like Piano Hinges each shutter of length 4 Nos 0.987m Powder coated Mild steel as per IS-3818 : 1992 of nominal size 25mm (B) of thickness 0.8 to 1.0 mm, 2 no's Stainless Steel Tower Bolt-10 mm Bolt (IS:15833) 100 mm Long, 4 Nos of Stainless Steel Door Handles 100 mm Long and standard cup board locks 2Nos, and magnets catche'rs 4Nos for shutters including cost and conveyance of all materials to site, labour charges, over heads and contractor profit etc., complete for finished item of work. First Floor

11

4028

44308

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of Two shutters cupboards as per drawing with medium teak wood frames of size 75mm x 40mm section with 2 Nos styles and 3 Nos rails at top, bottom and Middle rails and shutters of MDF Board Interior grade both sides laminated 18mm thick of 4Nos shutters size each of 0.987 x 0.7 m with 18mm x 12mm alround teak wood beading to each shutter including fixtures like Piano Hinges each shutter of length 4 Nos 0.987m Powder coated Mild steel as per IS-3818 : 1992 of nominal size 25mm (B) of thickness 0.8 to 1.0 mm, 2 no's Stainless Steel Tower Bolt-10 mm Bolt (IS:15833) 100 mm Long, 4 Nos of Stainless Steel Door Handles 100 mm Long and standard cup board locks 2Nos, and magnets catche'rs 4Nos for shutters including cost and conveyance of all materials to site, labour charges, over heads and contractor profit etc., complete for finished item of work. Ground Floor

15

4028

60420

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;RCM facia 50mm thick in CM (1:3) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer-In-Charge with dubara sponge finishing,including cost and conveyance of all materials to site, sales & othertaxes on all materials,operationals &incidental,cost and conveyance of cement,wire mesh,water to work site,centering, scaffolding and form work,lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.403&903). First Floor

3

3138

9414

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;RCM facia 50mm thick in CM (1:3) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer-In-Charge with dubara sponge finishing,including cost and conveyance of all materials to site, sales & othertaxes on all materials,operationals &incidental,cost and conveyance of cement,wire mesh,water to work site,centering, scaffolding and form work,lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.403&903). Ground Floor

3

2981

8943

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work. First Floor

111

761

84471

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work. Ground Floor

60

761

45660

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, excluding taxes like GST on all materials , incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207). Second Floor/Terrace Floor

3

193

579

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, excluding taxes like GST on all materials , incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207). First Floor

12.15

193

2344.95

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, excluding taxes like GST on all materials , incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207). Ground Floor

218.6

193

42189.95

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc., overheads & contractors profit complete for finished item of work as per special spn: 1108 Ground Floor

12

5217

62604

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of MS Grill to windows / in open court yards using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 300mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including cost all taxes and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. Second Floor/Terrace Floor

3

1430

4290

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of MS Grill to windows / in open court yards using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 300mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including cost all taxes and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. First Floor

12.15

1430

17374.5

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of MS Grill to windows / in open court yards using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 300mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including cost all taxes and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. Ground Floor

31.6

1430

45189.14

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) Fixed Glazing duly manufactured using UPVC reinforced profiles of 60 mm x 56 mm x 2.25 mm for outer frames and the mullion sections are of 60 mm x 70 mm x 2.25 mm frames are structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm the sash shall be fitted with 4 mm thick pinheaded glass of reputed make duly fixed with EPDM weathering seal resistant including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site with templates for casement sizing scaffolding including overheads and contractor profit etc., complete for finished item of work. Ground Floor

8.04

3995

32123

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin). Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractor profit etc., complete for finished item of work. First Floor

0.4

7279

2911.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin). Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractor profit etc., complete for finished item of work. Ground Floor

0.94

7279

6842.26

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 2 Track?2 Panel Sliding windows duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (62mm x 60 mm)/(60 mm x 45 mm) x 2.20 mm for outer frames, (66 mm x 38 mm)/(58 mm x 39 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractors profit etc., complete for finished item of work. Second Floor/Terrace Floor

2.43

7746

18822.78

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 2 Track?2 Panel Sliding windows duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (62mm x 60 mm)/(60 mm x 45 mm) x 2.20 mm for outer frames, (66 mm x 38 mm)/(58 mm x 39 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractors profit etc., complete for finished item of work. First Floor

12.15

7746

94113.9

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 2 Track?2 Panel Sliding windows duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (62mm x 60 mm)/(60 mm x 45 mm) x 2.20 mm for outer frames, (66 mm x 38 mm)/(58 mm x 39 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractors profit etc., complete for finished item of work. Ground Floor

9.72

7746

75291.12

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of not less than 10mm) (750mm x 2100mm). Ground Floor Ground Floor

17.49

8088

141442.94

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of not less than 10mm) (750mm x 2100mm). Ground Floor

3.15

5850

18427.5

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of not less than 10mm) (800mm x 2100mm). Second Floor/Terrace Floor

1.68

5666

9518.88

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of not less than 10mm) (800mm x 2100mm). First Floor

1.7

5666

9632.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 30mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of medium teak wood door frame, flush shutter, including suply and fixing 6 Nos. MS Z hold fasts of size 300mm x 40mm x 5mm including ISI marked Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. rubber bush including supplying and fixing 1.20mm thick PVC sheet to full height of the shutter inside including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002. (The vertical frame of door shall be embedded in flooring for deth of not less than 10mm) (800mm x 2100mm). Ground Floor

1.7

5666

9632.2

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Aluminium fixtures of 3 Nos. butt hinges (IS:205) 150mm long, 1 No. aldrop (IS:2681) 300mm long, 1 No. tower bolt (IS:204) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles (IS:208), 1 No. door stopper and 1 No. rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1000mm x 2100mm). Ground Floor

5

4741

23705

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick single shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Stainless steel fixtures of 3 Nos. butt hinges (IS:12817) 150mm long, 1 No. aldrop (IS:15834) 300mm long, 1 No. tower bolt (IS:15833) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles , 1 No. door stopper and 1 No. rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1000mm x 2100mm) First Floor

2.1

5074

10655.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and fixing doors as per drawings with medium teak wood frame of section 100mm x 65 mm and ISI marked flush door shutters of 30 mm thick double shutters with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of teak wood frame, flush shutter including supply and fixing 6 Nos. MS Z hold fasts of size 300 mm x 40 mm x 5mm including cost of ISI marked Stainless steel fixtures of 6 Nos. butt hinges (IS:12817) 150mm long, 1 No. aldrop (IS:15834) 300mm long, 2 Nos. tower bolts (IS:15833) of 200 mm x 10 mm dia at top, 2 Nos. 150 mm long handles, 2 Nos. door stoppers and 2 Nos. rubber bushes including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc., including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002 (The vertical frame of door shall be embedded in flooring for a depth of not less than 10 mm) (1200mm x 2100mm). First Floor

2.6

5048

13124.8

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) openable doors with openable shutters duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12PHR of CaCo3 for every 100 parts of PVC resin) of 60mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60mm x 2.40 mm for mullion sections as per the need and 102 mm x 60 mm x 2.40 mm for openable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gaskets for sash & Glazing bead shall be coextruded with Grey colour soft PVC.System shall be provided with 4 no?s of 3D Hinges for each shutter and multipoint locking with keys.with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractors profit etc., complete for finished item of work

5.04

9707

48923.28

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Painting to new wood work and flush shutters with lappam finish, over a primary coat and painting two coats of synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc., and overheads & contractors profit complete in all floors (APSS No.1200, 1207 & 1211).Second Floor/Terrace Floor

4

222

888

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Painting to new wood work and flush shutters with lappam finish, over a primary coat and painting two coats of synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc., and overheads & contractors profit complete in all floors (APSS No.1200, 1207 & 1211).First Floor

15

222

3330

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Painting to new wood work and flush shutters with lappam finish, over a primary coat and painting two coats of synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc., and overheads & contractors profit complete in all floors (APSS No.1200, 1207 & 1211).Ground Floor

21

222

4662

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., but excluding taxes like GST and overheads & contractors profit complete for finished item of work in all floors. Second Floor/Terrace Floor

51

293

14943

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., but excluding taxes like GST and overheads & contractors profit complete for finished item of work in all floors.First Floor

186

293

54498

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., but excluding taxes like GST and overheads & contractors profit complete for finished item of work in all floors.Ground Floor

3486

293

1021398

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, incidental, operational and all labour charges but excluding taxes like GST etc., and overheads & contractors profit complete for finished item of work in all floors.Second Floor/Terrace Floor

44

202

8888

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, incidental, operational and all labour charges but excluding taxes like GST etc., and overheads & contractors profit complete for finished item of work in all floors.First Floor

302

202

61004

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, incidental, operational and all labour charges but excluding taxes like GST etc., and overheads & contractors profit complete for finished item of work in all floors.Ground Floor

760

202

153520

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST.Second Floor/Terrace Floor

11

50

550

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST.First Floor

145

50

7250

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;White washing two coats with white cement to ceiling, internal walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST.Ground Floor

271

50

13550

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Flooring with 16 to 18 mm thick high polished granite stone slabs black colour as approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edge , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for platforms (S.S.701 & special) Polished granite for Platforms Ground Floor

13.5

5184

69984

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing skirting to internal walls up to 10 cm height with with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 &707). First Floor

77

116

8932

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing skirting to internal walls up to 10 cm height with with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 &707). Ground Floor

174

111

19314

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing dadooing to walls with glazed full body ceramic tiles of any size and thickness between 5 to 7mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. First Floor

15

1253

18795

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing dadooing to walls with glazed full body ceramic tiles of any size and thickness between 5 to 7mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. Ground Floor

24

1203

28872

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 & special) Risers-First Floor

5

4536

22680

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 & special) Risers -Ground Floor

7.8

4513

35201.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 & special) Treads First Floor

8

6850

54800

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work for treads and risers (S.S.701 & special) Treads Ground Floor

14

6758

94612

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Flooring with 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special) First Floor

3

4780

14340

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Flooring with 16 to 18mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8) , 20mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of work (S.S.701 & special) Ground Floor

13

4688

60944

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707). First Floor

128

1172

150016

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707). Ground Floor

74

1122

83028

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707) First Floor

4

1001

4004

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Flooring with non-skid full body ceramic floor tiles of size 300mm x 300mm and thickness between 7 - 8mm 1st quality conforming to IS: 13711, IS: 13712, IS: 13630(Part 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707) Ground Floor

7

951

6657

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Vaccum dewatering cement concrete flooring 75mm thick using M 25 grade design mix corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry in panels as per drawing / design, laid to proper level and slope including consolidating with power driven mechanical vibrators (both needle & screed vibrators), dewatering by vacuum process "Tremix" method, floated with neat cement and power troweled to achieve smooth finishing, including MS Shuttering, finishing, rounding of the edges, curing including cost and conveyance of all materials like cement, coarse aggregate, sand etc., to site, centering, shuttering, machine mixing, laying concrete, vibrating, curing, hire charges of all tools and plants, all other incidental and operational charges, labour charges and excluding seigniorage charges and taxes like GST on all materials etc., complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work.

115

718

82570

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 20mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904) Basement

2913

287

836031

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). Internal plastering Second Floor/Terrace Floor

44

635

27940

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). Internal plastering First Floor

272

583

158576

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). Internal plastering Ground Floor

546

532

290472

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) Basement

87

178

15486

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904).External Plastering Second Floor/Terrace Floor

51

635

32385

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904).External Plastering First Floor

186

583

108438

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904).External Plastering Ground Floor

393

532

209076

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Ornamental ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in- harge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) Second Floor/Terrace Floor

10

662

6620

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Ornamental ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in- harge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) First Floor

145

604

87580

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Ornamental ceiling plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in- harge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) Ground Floor

271

547

148237

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.(APSS No.126) First Floor

0.17

89853

15275.01

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.(APSS No.126) Ground Floor

0.69

88238

60884.22

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). Second Floor/Terrace Floor

1.6

87889

140622.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). First Floor

5.4

86274

465879.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). Ground Floor

57.88

84659

4900062.92

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Reinforced cement concrete (1:5:10) proportion (Cement: fine aggregates: coarse aggregate) using 40mm size (SS5) hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site including centering using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., shuttering, machine mixing, laying concrete, lifting concrete manually , curing etc., and overheads & contractors profit complete as per drawings but excluding cost of steel and it's fabrication charges for finished item of work (APSS NO. 402 & 403) for Dummy columns. Second Floor/Terrace Floor

1

12313

12313

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 nominal mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 300 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work for coping on top of compound wall/ bed blocks for holding angles (APSS No. 402 & 403). Ground Floor

3

5989

17967

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 402) Second Floor/Terrace Floor

0.2

6322

1264.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 402) First Floor

0.5

6154

3077

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 402) Ground Floor

1.8

5986

10774.8

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using weigh batcher / mixer, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work (APSS No. 402 & 403) for steps & Sheet Rock. For columns First Floor

1

7807

7807

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using weigh batcher / mixer, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work (APSS No. 402 & 403) for steps & Sheet Rock. For columns Ground Floor

1

7506

7506

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete M 20 design mix using weigh batcher / mixer, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work (APSS No. 402 & 403) for steps & Sheet Rock. For Column Footings

9.7

6859

66532.3

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509). First Floor

36

996

35856

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509). Ground Floor

1259

905

1139395

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Masonry work in CM (1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 501 & 504). Second Floor/Terrace Floor

18

9385

168930

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Masonry work in CM (1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 501 & 504). First Floor

32

8806

281792

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Masonry work in CM (1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 501 & 504). Ground Floor

90

8228

740520

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Steel scaffolding pipes, jack props, Steel centering Plates etc.,for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903). Sunshades Second Floor/Terrace Floor

2

776

1552

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Steel scaffolding pipes, jack props, Steel centering Plates etc.,for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903). Sunshades First Floor

10

740

7400

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Steel scaffolding pipes, jack props, Steel centering Plates etc.,for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903). Sunshades Ground Floor

10

706

7060

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using weigh batcher / mixer including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for sill slabs. First Floor

0.3

8247

2474.1

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using weigh batcher / mixer including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for sill slabs. Ground Floor

1.6

7891

12625.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for Shelves First Floor

7

304

2128

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for Shelves Ground Floor

80

291

23280

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for Platforms & Lofts First Floor

16

608

9728

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for Platforms & Lofts Ground Floor

46

581

26726

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Lintels Second Floor/Terrace Floor

0.1

15804

1580.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Lintels First Floor

0.7

15083

10558.1

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Lintels Ground Floor

2.4

14360

34464

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Pump Room columns Sump & pump room roof beams Ground Floor 150mm thick Roof Slab

59

1761

103899

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Waist slab (175mm thick) First Floor

13

2019

26247

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Waist slab (175mm thick) Ground Floor

13

1938

25194

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Roof Slab 150 mm thick Second Floor/Terrace Floor

6

1892

11352

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Roof Slab 150 mm thick First Floor

145

1817

263465

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Roof Slab 150 mm thick Ground Floor

145

1743

252735

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Roof beams Roof Slab 125 mm thick Ground Floor

117

1912

223704

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Roof beams Roof Slab 125 mm thick Second Floor/Terrace Floor

19

1704

32376

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Roof beams Roof Slab 125 mm thick Ground Floor

84

1568

131712

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Roof beamsSecond Floor/Terrace Floor

2

14248

28496

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Roof beams First Floor

7

13675

95725

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Roof beams Ground Floor

11.5

13102

150673

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) 300mmthick Side Walls Ground Floor

81

4419

357939

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) 150mmthick Side Walls Ground Floor

1

2901

2901

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete mechanically, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) but excluding seigniorage charges & GST etc (APSS No. 402) Sump Bottom Slab

35.3

10129

357553.7

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 150 mm thick water tank side walls 200mmthick Retaining wall Ground Floor

13

3383

43979

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 150 mm thick water tank side wallsSecond Floor/Terrace Floor

8

3016

24128

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Second Floor/Terrace Floor Columns

2

16055

32110

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) First Floor columns

5.9

15220

89798

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Ground Floor columns

32.1

14386

461790.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Plinth beams

62.1

13844

859712.4

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Footings

108.31

10838

1173863.78

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Filling with soling stone by manual means (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for finished item of work. (APSS NO. 309 & 310)

42

354

14868

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Filling with 200mm down size aggregate compacted gravel by manual means (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for finished item of work. (APSS NO. 309 & 310)

14

1884

26376

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Filling with available excavated earth including pre-watering of soil, removal of top soil, spreading soils, breaking clods, sectioning and consolidation with Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (4th revision) including cost and conveyance of all materials , labour charges , overheads and contractors profit etc., complete for finished item of work (Payment will be made based on level for finished item of work).

13350

151

2015850

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Filling with useful available excavated earth by manual means (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for finished item of work. (APSS NO. 309 & 310)

669

220

147180

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site, including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work but excluding seigniorage charges and taxes like GST etc., in foundation and basement. (APSS No. 601 & 615)

26

4195

109070

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Vibrated Plain Cement Concrete (1:3:6) nominal mix using 40mm size machine crushed hard granite metal and 20mm graded machine crushed hard granite metal (coarse aggregate) in (2:1) ratio from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, excluding seigniorage charges, GST on all materials, all charges for mixing, laying concrete in position, vibrating, curing, centering charges, overheads & contractors profit etc.,for finished item of work for footings and basement.

29

6253

181337

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work but excluding seigniorage charges & taxes like GST etc.. (APSS No. 402).

27.9

4664

130125.6

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work but excluding seigniorage charges & taxes like GST etc. (APSS No. 402).

443

4855

2150765

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Grouting the holes with neat cement slurry excluding cost of steel but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work

252

132

33264

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Drilling holes of 25 mm dia and 800mm deep in hard rock or sheet rock with pneumatic compressor and placing of 20mm dia Tor steel bars and grouting the holes in CM(1:2) prop. excluding cost of steel and its fabrication charges but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work.

262

182

47684

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Earth work excavation for foundations for buildings in hard rock (requiring blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

199

1080

214920

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary rock (not requiring blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

199

164

32636

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

45

270

12150

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308).

868

129

111972

... More
PHASE 1 CIVIL WORKS AT OIL PALM COMPLEX;Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps including all labour charges.

4350

5

21750



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.