Telangana State Cooperative Oilseeds Growers Federation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Cooperative Oilseeds Growers Federation Limited Tender

Works
Civil And Construction
Excavation
Opening Date1 Mar 2024
Closing Date18 Mar 2024
Tender Amount₹ 12,44,62,235 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹45,000/MT*
Telangana

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of PEB shed for PKO mill;Supply and placing in postion water stopper 8 - 10 mm thick 225 mm wide including cost and conveyance of all materials to site and sales and other taxes except GST on all materials to site etc., complete for finished item of work

91

659

59969

... More
Construction of PEB shed for PKO mill;Providing, fixing and removing for pockets with plywood in RCC/PCC foundations including cost & conveyance of all materials, all incidental, operational and Labour charges etc for finished item of work. as per the directions of the engineer in charge

2152

350

753200

... More
Construction of PEB shed for PKO mill;Providing and laying of conbextra GP-2 for grouting between pedestal and base plate including cost and conveyance of all materials to the site and all labour charges for Laying and finishing and all incidental charges etc complete for finished item of work.

30.34

138740

4209371.6

... More
Construction of PEB shed for PKO mill;Providing 160 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., and overheads & contractors profit complete for finished item of work. (APSS No. 1328)

411

555

228105

... More
Construction of PEB shed for PKO mill;Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws etc., including cost and conveyance of all materials , labour charges , but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors Crimp curve @ Ridge

37

497

18389

... More
Construction of PEB shed for PKO mill;Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws etc., including cost and conveyance of all materials , labour charges , but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors Flashings/Aprons (upto 600mm)

561

486

272646

... More
Construction of PEB shed for PKO mill;Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws etc., including cost and conveyance of all materials , labour charges , but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors Gutter (600 mm over all girth)

120

1314

157680

... More
Construction of PEB shed for PKO mill;Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws etc., including cost and conveyance of all materials , labour charges , but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors Ridges plain (500 - 600mm)

60

532

31920

... More
Construction of PEB shed for PKO mill;Supply and fixing powder coated aluminium fully glazed swing door as per the approved drawing using aluminium sections of 101.60 mm x 44.45mm, 3.18 mm thick for frame and door shutter made of styles, top and middle rail of 47.62mm x 44.45mm, 3.18 mm thick and bottom rail of 114.30mm x 44.45 mm, 3.18mm thick,powder coating of alluminium sections 25mm microns thick, double shutters fitted with 5mm thick frosted / ground glass in the top half and 12mm thick prelaminated particle board (One side choice colour and other side balancing white lamnation) in the bottom half fitted with suitable aluminium glazing clips and rubber beading,shutters mounted on double action hydraulic floor spring of approved brand manufacture IS : 6315 marked , Hardwyn make M-3000 for doors including cost of cutting floors as required, embedding in floors and SS cover plates with brass pivot and sigle piece MS Sheet outer box with slide plate etc.complete (Weight Capacity up to 130 Kgs) as approved by Engineer-in-Charge including supply and fixing ISI marked powder coated aluminium fixtures of 4 Nos.tower bolts 10mm bolt (IS:204) 300mm long, 4 Nos. alluminium handles (IS:208) 150mm dia and 2 Nos. aldrops (IS:2681) 300mm long, 1no. heavy duty mortise lock 6/7 levers (IS:2209) with PC or CP handles complete set including labour charges for manufacturing door, fixing the door with required No. of screws etc., including overheads & contractors profit complete for finished item of work. (The Aluminium section used shall be standard make confirming to IS 1948?1961) and as approved by the Engineer) (1200mm x 2100mm).

5.04

12701

64013.04

... More
Construction of PEB shed for PKO mill;Providing and fixing double glazed hermetically sealed glazing in aluminium windows, ventilators and partition etc. with 6 mm thick clear float glass both side, having 12 mm air gap, including providing EPDM gasket, perforated aluminium spacers, desiccants, sealant (Both primary and secondary sealant) etc. as per specifications, drawings and direction of Engineer-in-charge complete.

72

4998

359856

... More
Construction of PEB shed for PKO mill;Providing and fixing 12mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS:12823 Grade l Type ll, in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer-in-charge.

43.2

1139

49204.8

... More
Construction of PEB shed for PKO mill;Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) :

1008

495

498960

... More
Construction of PEB shed for PKO mill;Supply and fixing of Cement Bonded Prelaminated Particle Board aluminum glazed partitions using 10mm Cement Bonded Prelaminated Particle Board and 5.00mm thick plain glass to full height. Using with Cement Bonded Prelaminated Particle Board to a height of 0.91 meter at bottom panel and remaining height with glass and aluminum sections anodized to 12 to 15 microns and of sections of size 37mm x 62mm and 1.5mm thickness with one meter centre to centre duly fixed with clip beading on both sides including fixing the frame to pillars by M.S. flats, bolts and nuts including cost and conveyance of all materials etc., complete as directed during execution including overheads & contractors profit etc., complete for finished item of work.

144

4745

683280

... More
Construction of PEB shed for PKO mill;Supplying and fixing MDF Board false ceiling using 12.0 mm thick MDF Board interior - oneside laminated conforming to IS 15932 with standard GI ceiling angles, sections perimeter channels including cost and conveyance of all materials , labour charges , overheads and contractor profit etc., complete for finished item of work

172.8

1781

307756.8

... More
Construction of PEB shed for PKO mill;Providing and fixing in true horizontal level 14 mm - Mineral Fiber sheet 595 x 595 (Square / Tegular) Fissura fine model edge tiles with a Humidity Resistance of 90% RH,Average NRC 0.50, Light Reflectance >80%, Thermal Conductivity ?= 0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1 using hot dipped Galvanized Steel section exposed surface with pre-coated capping, main Tee of size 24 x 32 mm at every 1200 mm c/c maximum and rotary stitched cross tee of size 24 x 27 mm at every 600 mm c/c and sub-cross tee of size 24 mm x 25 mm at 1200 mm c/c and wall angle of size 19 x 19 mm fixed to periphery of the wall and the above grid is suspended at every 1200 mm c/c in both directions using 2.0 mm thick pre-straightened GI Wire including cost and conveyance of all materials and labour charges such as cutting , fixing of standing of frame work exposing roof making, overheads & contractor profit etc., complete for finished item of work in all floor in all floors.

72

1390

100080

... More
Construction of PEB shed for PKO mill;Supply and Errection of Ventilation Turbo Air Ventilator System(Aluminum) with Aluminum Base Plate, For Industrial, Size: 24 Inch(610mm) with neccesary accessories including labour charges

20

15400

308000

... More
Construction of PEB shed for PKO mill;Supplying, fabricating, hoisting,erecting in position structural steel works comprising of trusses, lattice girders, brackets, column, bracing, rafters and other connected works with necessary joints, channels, angles, I-section, plates, bolts and nuts, washers as showin in the detailed approved drawings including cutting, welding, hoisting and Epoxy painting of 2 coats of epoxy Finish over one coat of epoxy primer including cost and conveyance of all materials, labour charges for fabrication erection at site work for all heights etc., complete as directed by the Engineer-in-Charge.

1

162566

162566

... More
Construction of PEB shed for PKO mill;Supply of Structural Steel hollow Square & Rectangular sections conforming to IS 4923-1997 for fixing of GI Sheet including cost of 2 coats of epoxy Finish over one coat of epoxy primer including cost and conveyance of all materials to work site and all operational, incidental, labour charges , overheads & contractors profit for finished item of work.etc., complete for finished item of work in all floors

4

188538

754152

... More
Construction of PEB shed for PKO mill;Supplying and fabricating, erecting and fixing in position tabular trusses of approved design with M.S tube conforming to I.S-1161 specifications including roof frame work consisting of rafters,ties struts and purlins including cost of foundations bolts, cleats, bearings plates,etc.,complete as per the sketch enclosed and including cost of 2 coats of epoxy Finish over one coat of epoxy primer including cost and conveyance of all materials, labour charges for erecting & fixing all structural steel works erecting in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete in position, labour charges for fabrication, all incidental charges, but excluding taxes like GST etc., overheads and contractor profit etc., complete for finished item of work as directed by the Engineer-in-Charge

17

184039

3128663

... More
Construction of PEB shed for PKO mill;Providing & fixing Electroplated Foundation Bolts of EN 4.6 Grade with required double nuts including cost of Labour charges for fixing in position, overheads and contractor's profit, etc. complete for finished item of work.

2.25

106116

238761

... More
Construction of PEB shed for PKO mill;Providing & fixing Foundation Bolts of EN 4.6 Grade with required double nuts including cost of Labour charges for fixing in position, overheads and contractor's profit, etc. complete for finished item of work.

3.72

81121

301770.12

... More
Construction of PEB shed for PKO mill;Procuring, Fabrication, Shot Blasting (SA-2.5), Epoxy painting of 2 coats of epoxy Finish over one coat of epoxy primer (total DFT of 150 microns), Transportation and installation of Pre-engineered Building (PEB) other structural items with Hot Rolled Items which includes Rod or Angle barcings, Pipe Struts, Sag Angles, Flange brace, Mezzanine Staircase, Hand rails, Cage Ladder, etc., Members fabricated from hot rolled structural shapes shall conform to the physical specifications of ASTM A572/ A572M (Grade 36) or equivalent and shall have a minimum yield strength of 250 MPA including cost and conveyance of hinges and all wastages and all operational, incidental, Labour charges for fabricating steel works including cost of welding rods, power charges, including cost of fixing in position, including preparation of shop drawings, cost of Labour charges, etc. complete in position etc. complete for finished item of work.

4.07

171525

698106.75

... More
Construction of PEB shed for PKO mill;Procuring, Cold forming, Transportation and installation of Pre-engineered Building (PEB) Secondary members which includes Purlins, Girts, Edge Angle, etc. Members formed from Galvanized Coils of 275 GSM and will conform to the physical specifications of ASTM A572/ A572M (Grade 50) or equivalent and shall have a minimum yield strength of 345 MPA. including cost and conveyance of hinges and all wastages and all operational, incidental, Labour charges for fabricating steel works including cost of welding rods, power charges, including cost of fixing in position, including preparation of shop drawings ,cost of Labour charges, overheads & contractor's profit, etc. complete in position etc. complete for finished item of work.

40.65

178285

7247285.25

... More
Construction of PEB shed for PKO mill;Procuring, Fabrication, Shot Blasting (SA-2.5), Epoxy painting of 2 coats of epoxy Finish over one coat of epoxy primer (total DFT of 150 microns), Transportation and installation of Pre-engineered Building (PEB) Primary members which includes all built-up Main columns, Main rafters, Mezzanine Columns, Mezzanine Beams, Mezzanine Joists with fixing of all necessary base plates, gusset plates & other connection plates. Members fabricated from plate or bar stock shall have flanges and webs joined on both side of the web by a continuous welding process and will conform to the physical specifications of ASTM A572/ A572M (Grade 50) or equivalent and shall have a minimum yield strength of 345 MPA including cost and conveyance of hinges and all wastages and all operational, incidental, Labour charges for fabricating steel works including cost of welding rods, power charges, including cost of fixing in position, including preparation of shop drawings , cost of Labour charges, overheads & contractor's profit, etc. complete in position etc. complete for finished item of work.

112.5

177166

19931175

... More
Construction of PEB shed for PKO mill;Providing 10mm thick UV resistant multiwall polycarbonate sheets fixed to the purlins with aluminum universal glazing set 40mm wide for jointing and fixing sheets and 14 size selfdrilling screws with neoprene washer. Side laps are stitched with self-tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape including cost and conveyance of all materials and labour charges, overheads and contractor's profits , etc. complete for finished item of work

132

2726

359932.32

... More
Construction of PEB shed for PKO mill;Roofing with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove including cost and conveyance of all materials , labour charges ,but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors.

4902

957

4691214

... More
Construction of PEB shed for PKO mill;Finishing with Epoxy paint for concrete work (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.

478

223

106594

... More
Construction of PEB shed for PKO mill;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, excluding taxes like GST on all materials , incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

48

193

9264

... More
Construction of PEB shed for PKO mill;White washing two coats with white cement to ceiling, internal, external walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST.

1399

50

69950

... More
Construction of PEB shed for PKO mill;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

317

570

180690

... More
Construction of PEB shed for PKO mill;Vaccum dewatering cement concrete flooring 75 mm thick using M 25 grade design mix corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry in panels (2.00 Mts x 2.00 Mts) as per drawing / design, laid to proper level and slope including consolidating with power driven mechanical vibrators (both needle & screed vibrators), dewatering by vacuum process "Tremix" method, floated with neat cement and power troweled to achieve smooth finishing, including groove cutting using diamond studded blades of 6mm x 25mm and filling bitumen, MS Shuttering, finishing, rounding of the edges, curing including cost and conveyance of all materials like cement, coarse aggregate, sand etc., to site, centering, shuttering, machine mixing, laying concrete, vibrating, curing, hire charges of all tools and plants, all other incidental and operational charges, labour charges and excluding seigniorage charges and taxes like GST on all materials etc., complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work.

1272

725

922200

... More
Construction of PEB shed for PKO mill;Supplying and fixing of MS Grill to windows / in open court yards using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 300mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including cost all taxes and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

11.25

1430

16087.5

... More
Construction of PEB shed for PKO mill;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractors profit etc., complete for finished item of work.

9

8088

72792

... More
Construction of PEB shed for PKO mill;Extra for providing grilled rolling shutters out of 8mm dia M.S.bar instead of laths as per design approved by Engineer-in-charge (area of grill to be measured) includingcost and conveyance of all materials and labour charges etc., overheads & contractors profit complete for finished item of work

14.4

760

10944

... More
Construction of PEB shed for PKO mill;Extra for providing mehanical device chain and crank operation for operating rolling shutters in the area exceeding 10.00 Sqm and upto 16.80 Sqm including cost and conveyance of all materials and labour charges etc., overheads & contractors profit complete for finished item of work

14

1260

17640

... More
Construction of PEB shed for PKO mill;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc., overheads & contractors profit complete for finished item of work as per special spn: 1108

14.4

5217

75124.8

... More
Construction of PEB shed for PKO mill;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). From 3.6 mts to 7.2 mts level

35

584

20440

... More
Construction of PEB shed for PKO mill;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). upto 3.6 mts level

1278

532

679896

... More
Construction of PEB shed for PKO mill;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904). From 3.6 mts to 7.2 mts level

29

608

17632

... More
Construction of PEB shed for PKO mill;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904). upto 3.6 mts level

454

557

252878

... More
Construction of PEB shed for PKO mill;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

698.53

179

125036.87

... More
Construction of PEB shed for PKO mill;Masonry work in CM (1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 501 & 504). From 3.6 mts level to 7.2 mts level

7

8812

61684

... More
Construction of PEB shed for PKO mill;Masonry work in CM (1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 501 & 504). upto 3.6 mts level

99

8233

815067

... More
Construction of PEB shed for PKO mill;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). For storage tanks

40.84

84659

3457473.56

... More
Construction of PEB shed for PKO mill;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126).

198.8

77501

15407198.8

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 75mm thick precasr slab manholes

1

829

829

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 150 thick rcc slabs

91

1794

163254

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Roof beams

1.2

13311

15973.2

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 230 thick rcc walls

128

3885

497280

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Tank Haunch concrete

2.4

9573

22975.2

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with cement content of 400 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 450mm thick Sump bottom slab

52

11047

574444

... More
Construction of PEB shed for PKO mill;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

192

7578

1454976

... More
Construction of PEB shed for PKO mill;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using weigh batcher / mixer including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for sill slabs.

0.3

7970

2391

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Steel scaffolding pipes, jack props, Steel centering Plates etc.,for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903).

9

709

6381

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 450 thick rcc side walls

340.47

14386

4898001.42

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 300 thick rcc side walls

250

4567

1141750

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 230 thick rcc side walls

252

3045

767340

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 200 thick RCC Walls

10

3552

35520

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 200 thick grade slab

66

2185

144210

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 150mm thick RCC side walls

166

3045

505470

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Lintel beam upto 3.6 mts level

3.33

14505

48301.65

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Column Pedestals

775.4

14530

11266562

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Plinth beams

30

13930

417900

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Raft & Center slab

181.93

10838

1971757.34

... More
Construction of PEB shed for PKO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Footings

825

10924

9012300

... More
Construction of PEB shed for PKO mill;Vibrated Plain Cement Concrete (1:3:6) nominal mix using 40mm size machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, excluding seigniorage charges, GST on all materials, all charges for mixing, laying concrete in position, vibrating, curing , centering charges , overheads & contractors profit etc., for finished item of work for footings and basement.

1039

6303

6548817

... More
Construction of PEB shed for PKO mill;Filling with useful available excavated earth by manual means (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for finished item of work. (APSS NO. 309 & 310)

8044.5

220

1769790

... More
Construction of PEB shed for PKO mill;Filling with carted gravel by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for fnished item of work. (APSS NO. 309 & 310)

2789

418

1165802

... More
Construction of PEB shed for PKO mill;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work but excluding seigniorage charges & taxes like GST etc.. (APSS No. 402).

417.6

4693

1959796.8

... More
Construction of PEB shed for PKO mill;Grouting the holes with neat cement slurry excluding cost of steel but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work

971

132

128172

... More
Construction of PEB shed for PKO mill;Drilling holes of 25 mm dia and 800mm deep in hard rock or sheet rock with pneumatic compressor and placing of 20mm dia Tor steel bars and grouting the holes in CM(1:2) prop. excluding cost of steel and its fabrication charges but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work.

971

182

176722

... More
Construction of PEB shed for PKO mill;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock.

74

6938

513412

... More
Construction of PEB shed for PKO mill;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work but excluding seigniorage charges & taxes like GST etc. (APSS No. 402).

143.13

4855

694896.15

... More
Construction of PEB shed for PKO mill;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work but excluding seigniorage charges & taxes like GST etc. (APSS No. 402).

324.98

4892

1589802.16

... More
Construction of PEB shed for PKO mill;Earth work excavation for foundations for buildings in hard rock (requiring blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

779

1080

841320

... More
Construction of PEB shed for PKO mill;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary rock (not requiring blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

779

164

127756

... More
Construction of PEB shed for PKO mill;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

127

270

34290

... More
Construction of PEB shed for PKO mill;Earth work excavation for foundations for buildings in hard rock (blasting prohibited) and depositing on bank for all lifts and with a lead of 1KM and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

2181

2481

5411061

... More
Construction of PEB shed for PKO mill;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary rock (not requiring blasting) and depositing on bank for all lifts and with a lead of 1KM and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

2349.07

206

483908.42

... More
Construction of PEB shed for PKO mill;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308).

6858

129

884682

... More
Construction of PEB shed for PKO mill;Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps including all labour charges.

1872

5

9360



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.