Telangana State Cooperative Oilseeds Growers Federation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Cooperative Oilseeds Growers Federation Limited Tender

Works
Civil And Construction
Excavation
Opening Date28 Feb 2024
Closing Date15 Mar 2024
Tender Amount₹ 19,75,70,006 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹44,500/MT*
Telangana

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of PEB shed and machinery foundations for CPO mill;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete. Reinforced cement concrete

50

3977

198850

... More
Construction of PEB shed and machinery foundations for CPO mill;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete. Unreinforced cement concrete more than 15cm thickness

20

3626

72520

... More
Construction of PEB shed and machinery foundations for CPO mill;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete. Unreinforced cement concrete upto 15cm thickness

30

1813

54390

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing and laying of conbextra GP-2 for grouting between pedestal and base plate including cost and conveyance of all materials to the site and all labour charges for Laying and finishing and all incidental charges etc complete for finished item of work.

16

138740

2219840

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing 160 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., and overheads & contractors profit complete for finished item of work. (APSS No. 1328)

759

555

421245

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws etc., including cost and conveyance of all materials , labour charges , but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors Crimp curve @ Ridge

92

497

45724

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws etc., including cost and conveyance of all materials , labour charges , but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors Flashings/Aprons (upto 600mm)

1248.72

486

606877.92

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws etc., including cost and conveyance of all materials , labour charges , but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors Gutter (600 mm over all girth)

305

1314

400770

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws etc., including cost and conveyance of all materials , labour charges , but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors Ridges plain (500 - 600mm)

153

532

81396

... More
Construction of PEB shed and machinery foundations for CPO mill;Supply and fixing powder coated aluminium fully glazed swing door as per the approved drawing using aluminium sections of 101.60 mm x 44.45mm, 3.18 mm thick for frame and door shutter made of styles, top and middle rail of 47.62mm x 44.45mm, 3.18 mm thick and bottom rail of 114.30mm x 44.45 mm, 3.18mm thick,powder coating of alluminium sections 25mm microns thick, double shutters fitted with 5mm thick frosted / ground glass in the top half and 12mm thick prelaminated particle board (One side choice colour and other side balancing white lamnation) in the bottom half fitted with suitable aluminium glazing clips and rubber beading,shutters mounted on double action hydraulic floor spring of approved brand manufacture IS : 6315 marked , Hardwyn make M-3000 for doors including cost of cutting floors as required, embedding in floors and SS cover plates with brass pivot and sigle piece MS Sheet outer box with slide plate etc.complete (Weight Capacity up to 130 Kgs) as approved by Engineer-in-Charge including supply and fixing ISI marked powder coated aluminium fixtures of 4 Nos.tower bolts 10mm bolt (IS:204) 300mm long, 4 Nos. alluminium handles (IS:208) 150mm dia and 2 Nos. aldrops (IS:2681) 300mm long including labour charges for manufacturing door, fixing the door with required No. of screws etc., including overheads & contractors profit complete for finished item of work. (The Aluminium section used shall be standard make confirming to IS 1948?1961) and as approved by the Engineer) (3000mm x 3500mm).

21

5660

118860

... More
Construction of PEB shed and machinery foundations for CPO mill;Supply and fixing powder coated aluminium fully glazed swing door as per the approved drawing using aluminium sections of 101.60 mm x 44.45mm, 3.18 mm thick for frame and door shutter made of styles, top and middle rail of 47.62mm x 44.45mm, 3.18 mm thick and bottom rail of 114.30mm x 44.45 mm, 3.18mm thick,powder coating of alluminium sections 25mm microns thick, double shutters fitted with 5mm thick frosted / ground glass in the top half and 12mm thick prelaminated particle board (One side choice colour and other side balancing white lamnation) in the bottom half fitted with suitable aluminium glazing clips and rubber beading,shutters mounted on double action hydraulic floor spring of approved brand manufacture IS : 6315 marked , Hardwyn make M-3000 for doors including cost of cutting floors as required, embedding in floors and SS cover plates with brass pivot and sigle piece MS Sheet outer box with slide plate etc.complete (Weight Capacity up to 130 Kgs) as approved by Engineer-in-Charge including supply and fixing ISI marked powder coated aluminium fixtures of 4 Nos.tower bolts 10mm bolt (IS:204) 300mm long, 4 Nos. alluminium handles (IS:208) 150mm dia and 2 Nos. aldrops (IS:2681) 300mm long, 1no. heavy duty mortise lock 6/7 levers (IS:2209) with PC or CP handles complete set including labour charges for manufacturing door, fixing the door with required No. of screws etc., including overheads & contractors profit complete for finished item of work. (The Aluminium section used shall be standard make confirming to IS 1948?1961) and as approved by the Engineer) (1200mm x 2100mm).

7.56

12701

96019.56

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing and fixing double glazed hermetically sealed glazing in aluminium windows, ventilators and partition etc. with 6 mm thick clear float glass both side, having 12 mm air gap, including providing EPDM gasket, perforated aluminium spacers, desiccants, sealant (Both primary and secondary sealant) etc. as per specifications, drawings and direction of Engineer-in-charge complete.

36

4998

179928

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing and fixing 12mm thick prelaminated particle board flat pressed three layer or graded wood particle board conforming to IS:12823 Grade l Type ll, in panelling fixed in aluminum doors, windows shutters and partition frames with C.P. brass / stainless steel screws etc. complete as per architectural drawings and directions of engineer-in-charge.

36

1139

41004

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/appropriate Z sections and other sections of approved make conforming to IS: 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge. (Glazing, paneling and dash fasteners to be paid for separately) :

252

495

124740

... More
Construction of PEB shed and machinery foundations for CPO mill;Supply and fixing of Cement Bonded Prelaminated Particle Board aluminum glazed partitions using 10mm Cement Bonded Prelaminated Particle Board and 5.00mm thick plain glass to full height. Using with Cement Bonded Prelaminated Particle Board to a height of 0.91 meter at bottom panel and remaining height with glass and aluminum sections anodized to 12 to 15 microns and of sections of size 37mm x 62mm and 1.5mm thickness with one meter centre to centre duly fixed with clip beading on both sides including fixing the frame to pillars by M.S. flats, bolts and nuts including cost and conveyance of all materials etc., complete as directed during execution including overheads & contractors profit etc., complete for finished item of work.

346

4745

1641770

... More
Construction of PEB shed and machinery foundations for CPO mill;Finishing with Epoxy paint for concrete work (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.

613

223

136699

... More
Construction of PEB shed and machinery foundations for CPO mill;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, excluding taxes like GST on all materials , incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

15

193

2895

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing and Fixing M.S. Chequered Plates of approved thickness with MS angles of approved sizes for cable trenches/Drains and wherever required, at all levels, etc, complete, as per standard specifications / approved detailed drawings including cutting, welding, hoisting & including cost and conveyance of all materials, all taxes except GST, labour charges for fabrication erection at site work etc., complete and as directed by engineer-in-charge.

11775

142

1672050

... More
Construction of PEB shed and machinery foundations for CPO mill;Supplying, fabricating, hoisting,erecting in position structural steel works comprising of trusses, lattice girders, brackets, column, bracing, rafters and other connected works with necessary joints, channels, angles, I-section, plates, bolts and nuts, washers as showin in the detailed approved drawings including cutting, welding, hoisting and Epoxy painting of 2 coats of epoxy Finish over one coat of epoxy primer including cost and conveyance of all materials, labour charges for fabrication erection at site work for all heights etc., complete as directed by the Engineer-in-Charge.

4

162566

650264

... More
Construction of PEB shed and machinery foundations for CPO mill;Supply and Errection of Motorized Ventilation Turbo Air Ventilator System(Aluminum) with Aluminum Base Plate, For Industrial, Size: 24 Inch(610mm) with neccesary accessories including labour charges

30

51750

1552500

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing & fixing Electroplated Foundation Bolts of EN 4.6 Grade with required double nuts including cost of Labour charges for fixing in position, overheads and contractor's profit, etc. complete for finished item of work.

9.8

106116

1039936.8

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing & fixing Foundation Bolts of EN 4.6 Grade with required double nuts including cost of Labour charges for fixing in position, overheads and contractor's profit, etc. complete for finished item of work.

14.7

81121

1192478.7

... More
Construction of PEB shed and machinery foundations for CPO mill;Procuring, Fabrication,Erection, Shot Blasting (SA-2.5), Epoxy painting of 2 coats of epoxy Finish over one coat of epoxy primer (total DFT of 150 microns), Transportation and installation of Pre-engineered Building (PEB) other structural items with Hot Rolled Items which includes Rod or Angle barcings, Pipe Struts, Sag Angles, Flange brace, Mezzanine Staircase, Hand rails, Cage Ladder, etc., Members fabricated from hot rolled structural shapes shall conform to the physical specifications of ASTM A572/ A572M (Grade 36) or equivalent and shall have a minimum yield strength of 250 MPA including cost and conveyance of hinges and all wastages and all operational, incidental, Labour charges for fabricating steel works including cost of welding rods, power charges, including cost of fixing in position, including preparation of shop drawings, cost of Labour charges, etc. complete in position etc. complete for finished item of work.

14.85

171525

2547146.25

... More
Construction of PEB shed and machinery foundations for CPO mill;Procuring, Cold forming, Transportation and Erection of Pre-engineered Building (PEB) Secondary members which includes Purlins, Girts, Edge Angle, etc. Members formed from Galvanized Coils of 275 GSM and will conform to the physical specifications of ASTM A572/ A572M (Grade 50) or equivalent and shall have a minimum yield strength of 345 MPA. including cost and conveyance of hinges and all wastages and all operational, incidental, Labour charges for fabricating steel works including cost of welding rods, power charges, including cost of fixing in position, including preparation of shop drawings ,cost of Labour charges, overheads & contractor's profit, etc. complete in position etc. complete for finished item of work.

155

178512

27669360

... More
Construction of PEB shed and machinery foundations for CPO mill;Procuring, Fabrication,erection, Shot Blasting (SA-2.5), Epoxy painting of 2 coats of epoxy Finish over one coat of epoxy primer (total DFT of 150 microns), Transportation and installation of Pre-engineered Building (PEB) Primary members which includes all built-up Main columns, Main rafters, Mezzanine Columns, Mezzanine Beams, Mezzanine Joists with fixing of all necessary base plates, gusset plates & other connection plates. Members fabricated from plate or bar stock shall have flanges and webs joined on both side of the web by a continuous welding process and will conform to the physical specifications of ASTM A572/ A572M (Grade 50) or equivalent and shall have a minimum yield strength of 345 MPA including cost and conveyance of all materials like hinges and all wastages and all operational, incidental, Labour charges for fabricating steel works including cost of welding rods, power charges, including cost of fixing in position, including preparation of shop drawings , cost of Labour charges, overheads & contractor's profit, etc. complete in position etc. complete for finished item of work.

490

177166

86811340

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing 10mm thick UV resistant multiwall polycarbonate sheets fixed to the purlins with aluminum universal glazing set 40mm wide for jointing and fixing sheets and 14 size selfdrilling screws with neoprene washer. Side laps are stitched with self-tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape including cost and conveyance of all materials and labour charges, overheads and contractor's profits , etc. complete for finished item of work

459

2726

1251582.84

... More
Construction of PEB shed and machinery foundations for CPO mill;Roofing with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove including cost and conveyance of all materials , labour charges ,but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors.

14500

957

13876500

... More
Construction of PEB shed and machinery foundations for CPO mill;White washing two coats with white cement to ceiling, internal, external walls to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., and overheads & contractors profit complete for finished item of work in all floors but excluding taxes like GST.

2920

50

146000

... More
Construction of PEB shed and machinery foundations for CPO mill;Supplying and fixing of MS Grill to windows / in open court yards using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 300mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including cost all taxes and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

15

1430

21450

... More
Construction of PEB shed and machinery foundations for CPO mill;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fiber mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractors profit etc., complete for finished item of work.

15

8088

121320

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing skirting to internal walls up to 10 cm height with with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 &707).

168

111

18648

... More
Construction of PEB shed and machinery foundations for CPO mill;Supplying and fixing MDF Board false ceiling using 12.0 mm thick MDF Board interior - oneside laminated conforming to IS 15932 with standard GI ceiling angles, sections perimeter channels including cost and conveyance of all materials , labour charges , overheads and contractor profit etc., complete for finished item of work

222

1781

395382

... More
Construction of PEB shed and machinery foundations for CPO mill;Supplying and fixing Gyp board Fine line Grid false ceiling (GS-FLC-4.6)using 12.5mm thick Gyp Board sheet tiles of size 595mm x 595mm conforming to IS 2095 - 1992 fixing to Gyp steel precoated GI wall angle of size 25mm x 25mm x 0.70mm thick along the perimeter of ceiling screw fixed to brick work / partition at 610mm center to center and suspending the frame work using precoated GI Tee section (24mm x 38mm x 0.7mm) from soffit at 1220mm center to center fixed with GI Soffit Cleat, rawl plugs and steel expansion fasteners & connecting clip to the GI Tee section with 4mm dia GI rod with galvanised spring steel level clip of PVC unversal holding clips system at 1200mm center to center and fixing the 12.5mm Gypboard sheet tiles of size 595mm x 595mm and finishing two coats of drywall top coat, overheads and contractor profit complete for finished item of work in all floors.

222

1125

249750

... More
Construction of PEB shed and machinery foundations for CPO mill;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707).

222

1123

249306

... More
Construction of PEB shed and machinery foundations for CPO mill;Vaccum dewatering cement concrete flooring 75 mm thick using M 25 grade design mix corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry in panels (2.00 Mts x 2.00 Mts) as per drawing / design, laid to proper level and slope including consolidating with power driven mechanical vibrators (both needle & screed vibrators), dewatering by vacuum process "Tremix" method, floated with neat cement and power troweled to achieve smooth finishing, including groove cutting using diamond studded blades of 6mm x 25mm and filling bitumen, MS Shuttering, finishing, rounding of the edges, curing including cost and conveyance of all materials like cement, coarse aggregate, sand etc., to site, centering, shuttering, machine mixing, laying concrete, vibrating, curing, hire charges of all tools and plants, all other incidental and operational charges, labour charges and excluding seigniorage charges and taxes like GST on all materials etc., complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work.

5180

725

3755500

... More
Construction of PEB shed and machinery foundations for CPO mill;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). above 3.6 mts to 7.2 mts level

88

584

51392

... More
Construction of PEB shed and machinery foundations for CPO mill;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904). upto 3.6 mts level

1452.1

532

772517.2

... More
Construction of PEB shed and machinery foundations for CPO mill;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904). above 3.6 mts to 7.2 mts level

84

608

51072

... More
Construction of PEB shed and machinery foundations for CPO mill;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904). upto 3.6 mts level

869

557

484033

... More
Construction of PEB shed and machinery foundations for CPO mill;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

377

179

67483

... More
Construction of PEB shed and machinery foundations for CPO mill;RCM facia 50mm thick in CM (1:3) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer-In-Charge with dubara sponge finishing,including cost and conveyance of all materials to site, sales & othertaxes on all materials,operationals &incidental,cost and conveyance of cement,wire mesh,water to work site,centering, scaffolding and form work,lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.403&903).

9

2987

26883

... More
Construction of PEB shed and machinery foundations for CPO mill;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 402)

0.3

6036

1810.8

... More
Construction of PEB shed and machinery foundations for CPO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Steel scaffolding pipes, jack props, Steel centering Plates etc.,for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903).

12

709

8508

... More
Construction of PEB shed and machinery foundations for CPO mill;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using weigh batcher / mixer including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for sill slabs.

1

7970

7970

... More
Construction of PEB shed and machinery foundations for CPO mill;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509).

4

906

3624

... More
Construction of PEB shed and machinery foundations for CPO mill;Masonry work in CM (1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 501 & 504). above 3.6 mts to 7.2 mts level

17

8812

149804

... More
Construction of PEB shed and machinery foundations for CPO mill;Masonry work in CM (1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 501 & 504). upto 3.6 mts level

218

8233

1794794

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.(APSS No.126)

0.04

88238

3529.52

... More
Construction of PEB shed and machinery foundations for CPO mill;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126).

146.8

77501

11377146.8

... More
Construction of PEB shed and machinery foundations for CPO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Lintel beam upto 3.6 mts level

1

14505

14505

... More
Construction of PEB shed and machinery foundations for CPO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 230 THICK RCC WALLS

28

3885

108780

... More
Construction of PEB shed and machinery foundations for CPO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) 150mm thick Drain side walls

525

3045

1598625

... More
Construction of PEB shed and machinery foundations for CPO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Column Pedestals

437.2

14530

6352516

... More
Construction of PEB shed and machinery foundations for CPO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Plinth beams

105.35

13930

1467525.5

... More
Construction of PEB shed and machinery foundations for CPO mill;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Footings

615

10924

6718260

... More
Construction of PEB shed and machinery foundations for CPO mill;Vibrated Plain Cement Concrete (1:3:6) nominal mix using 20/40mm size machine crushed hard granite metal and 20mm graded machine crushed hard granite metal (coarse aggregate) in (2:1) ratio from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, excluding seigniorage charges, GST on all materials, all charges for mixing, laying concrete in position, vibrating, curing, centering/Shuttering charges, overheads & contractors profit etc.,for finished item of work for footings and basement.

175

6303

1103025

... More
Construction of PEB shed and machinery foundations for CPO mill;Filling with useful available excavated earth by manual means (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming with compactor including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for finished item of work. (APSS NO. 309 & 310)

2937

220

646140

... More
Construction of PEB shed and machinery foundations for CPO mill;Filling with carted gravel by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming with compactor including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for fnished item of work. (APSS NO. 309 & 310)

6187

418

2586166

... More
Construction of PEB shed and machinery foundations for CPO mill;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work but excluding seigniorage charges & taxes like GST etc.. (APSS No. 402).

981.2

4693

4604771.6

... More
Construction of PEB shed and machinery foundations for CPO mill;Grouting the holes with neat cement slurry with non-shirink grout excluding cost of steel but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work

989.34

132

130592.88

... More
Construction of PEB shed and machinery foundations for CPO mill;Drilling holes of 25 mm dia and 800mm deep in hard rock or sheet rock with pneumatic compressor and placing of 20mm dia Tor steel bars and grouting the holes in CM(1:2) prop. excluding cost of steel and its fabrication charges but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work.

988

182

179816

... More
Construction of PEB shed and machinery foundations for CPO mill;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock.

126

6938

874188

... More
Construction of PEB shed and machinery foundations for CPO mill;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work but excluding seigniorage charges & taxes like GST etc. (APSS No. 402).

294

4892

1438248

... More
Construction of PEB shed and machinery foundations for CPO mill;Earth work excavation for foundations for buildings in hard rock (blasting prohibited) and depositing on bank for all lifts and with a lead of 1KM and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

1470

2481

3647070

... More
Construction of PEB shed and machinery foundations for CPO mill;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary rock (not requiring blasting) and depositing on bank for all lifts and with a lead of 1KM and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

1470

206

302820

... More
Construction of PEB shed and machinery foundations for CPO mill;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308).

2937

129

378873

... More
Construction of PEB shed and machinery foundations for CPO mill;Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps including all labour charges.

5400

5

27000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.