Telangana State Cooperative Oilseeds Growers Federation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Cooperative Oilseeds Growers Federation Limited Tender

Works
Transportation and Logistics
Opening Date8 Nov 2023
Closing Date22 Nov 2023
Tender Amount₹ 3,98,02,343 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box with hook including all Labour charges etc., complete.

7

210

1475.25

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply installation testing and commisioning of 3 feet 4pair 23AWG Cat6 UTP ,flexible ,double ended patch cords along with 2 nos of RJ 45 connectors with strain relief boots Compatible to T568A,T568Bspecifications including making connections to information outlets

1

202

202

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply installation testing and commisioning of 7 feet 4pair 23AWG Cat6 UTP ,flexible ,double ended patch cords along with 2 nos of RJ 45 connectors with strain relief boots Compatible to T568A,T568Bspecifications including making connections to information outlets

1

222

222

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply,laying ,testing and commisioning of 4-pair, Cat6 Solid (Third party ETL Intertek tested 600 MHZ above) to support 1Gbps with Cross (+) filler pair seperator & PVC sheath 23 AWG, UTP Cable , Meets or exceeds ANSI/TIA- 568-C.2 and UL Listed &RoHS Compliant in the existing raceways /pvc conduits including making connections to information outlets and patch panels with ferruling at both ends for identifiation with necessary tools for punching stripping crimping and testing required etc., complete

50

31

1585

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply installation testing and commisioning of1no of Cat6 Tooless builtin crimping mechanism Information Outlet with Dust Cover Exceed ANSI/TIA-568-C.2 and ISO/IEC 11801 standards with 1module face plate for Category 6 component performance & Compatible to T568A,T568B wiring pattern and UL-940V0 Rated Plastic &RoHS Compliant

5

582

2910

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and fixing of 20 pair MDF krone pair box with MS enclosure with lock and key arrangement etc complete with all labour charges. (Data 44)

1

1070

1070

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and fixing of 2 Line telephone jack socket model modular type with connector front and back plate in existing modular box with screws connections etc., complete. (makes :- Cabtree Thames Platinum / GM / Million /Anchor Roma viola / Toyoma / L&T. (Data 43)

2

273

546

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and laying of 20 pair telephone wire 0.5mm copper in the existing metallic/non metallic conduit pipe with connections etc.,completeTelephone wire Makes: Finolex/Delton/ Surabi/ Polycab. (Data 42)

50

109

5450

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and laying of 2 pair telephone wire 0.5mm copper in the existing metallic/non metallic conduit pipe with connections etc., complete. Makes: Finolex/L&T/Gold Medal/Million/ Delton/ Polycab/ RPG. (Data 41)

50

13

695

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and fixing of louver shutter suitable for 12" Exhaust fan including all labour charges etc complete with connections and colouring matching to the wall with enamel paint.

5

150

750

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete.

5

395

1975

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply,Transportation of Heavy duty exhaust fan 12"(300 mm) size with all accessories such as louver shutter etc.,

5

3090

15450

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and fixing of ISI mark batten holder / slanting holder Makes : Anchor / Gold Medal Olive / Million Zoom in lieu of ceiling rose of light point complete with all connections and all labour charges with 9W LED Lamp.

5

115

575

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply ,Transportation and fixing of 90W LED High Bay Luminaire with high power COB LED, made of pressure diecast alluminium housing with powder coated,Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having efficacy >95 lumines/watt, System efficacy >95lm/W and junction temprature < 70°C, with Ingrees protection IP65, IK05, Driver surge protection 4KV, external Surge protection = 5KV with wide/ Narrow beam optics, THD<10% at 110 Volts AC, driver efficiency >90%, , CCT: 3000K - 5700K, minimum CRI>70, etc., complete.

35

8438

295330

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Providing and fixing following rating and breaking capacity and pole MCCB with thermomagnetic release and terminal spreaders in existing cubicle panel board including drilling holes in cubicle panel, making connections, etc. as required. 125 A, 16 KA,TPMCCB

1

8335

8335

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supplying and fixing following rating, double pole, (single phase and neutral), 240 V, residual current circuit breaker (RCCB), having a sensitivity current 300 mA in the existing MCB DB complete with connections, testing and commissioning etc. as required. 63 A

1

5062

5062

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, "C" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. Triple pole

13

1399

18187

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, "C" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. Double pole

1

556

556

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, "C" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. Single pole

20

309

6180

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supplying and fixing of following ways surface/ recess mounting, vertical type, 415 V, Vertical type MCB TPDB distribution board of sheet steel, dust protected, duly powder painted, inclusive of 200 A tinned copper bus bar, common neutral link, earth bar, din bar for mounting MCBs (but without MCBs and incomer ) as required . (Note : 3 phase outlets are required.) 8 way (4 + 24), Double door

1

7744

7744

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 V, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) 8 way (2 + 8), Double door

4

1760

7040

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and Run of 4 X 10 sq. mm + 2 X 10 sq. mm earth wire FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete

120

1012

121440

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and Run of 2 X 6 sq. mm + 1 X 6 sq. mm earth wire FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete

100

319

31900

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and Run of 2 X 4 sq. mm + 1 X 4 sq. mm earth wireFRLS / HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete

250

227

56750

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and Run of 2 X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete

300

149

44700

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and Run of 2 X 1.5 sq. mm + 1 X 1.5 sq. mm earth wire FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete

100

101

10100

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supplying and fixing 20 A, 240 V, SPN Industrial type socket outlet, with 2 pole and earth, metal enclosed plug top alongwith 20 A "C" curve, SP, MCB, in sheet steel enclosure, on surface or in recess, with chained metal cover for the socket out let and complete with connections, testing and commissioning etc. as required.

2

1232

2464

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and fixing of ISI mark 16A 3pin / 6A 3 Pin 1 way Modular combi socket, 16 Amps Modular switch, 3 Modular box with suitable cover frame and earth connections including cost and conveyance of all material and all labour charges etc., complete

15

828

12420

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and fixing of 6A/10A ISI Mark 3/2 pin Modular socket with 6A/10A 1way Modular switch, 3 Module box with cover frame on a Common switch board including cost and conveyance of all materials and all labour charges etc., complete

15

586

8790

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Wiring with run of 2 of 22/0.3mm (1.5 Sqmm) FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for light and bell points as given below, One point controlled by one no. 6 amps switch

136

927

126072

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe concealed in wall with all required PVC / Metallic Junction Boxes including masonary work and labour charges etc.,

150

83

12450

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and Laying of ISI 25mm outer dia heavy grade with IS:9537 part 3 regid PVC pipe in Roof Slabs with all required PVC / Metallic Deep Boxes including masonary work and labour charges etc., complete.

800

96

76800

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and fixing of Cement Bonded Prelaminated Particle Board aluminium glazed partitions using 10MM Cement Bonded Prelaminated Particle Board and 5.00 mm thick plain glass to full height. Using with Cement Bonded Prelaminated Particle Board to a height of 0.91 meter at bottom panel and remaining height with glass and aluminium sections anodized to 12 to 15 microns and of sections of size 37mm x 62mm and 1.5mm thickness with one meter centre to centre duly fixed with clip beading on both sides including fixing the frame to pillars by M.S. flats, bolts, nuts and shutter frame work shall be made of 47.62mmx44.45mmx1.95mm thick for styles(verticals), 44.45mmx101.60mmx2.50mm for bottom rail and 44.45mmx100.00mmx2.0mm for top,middle/lock rail including cost and conveyance of all materials etc., complete as directed during execution

189

4726

893214

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, excluding taxes like GST on all materials , incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207). for Rolling shutter & Grills

416

218

90688

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and Errection of Ventilation Turbo Air Ventilator System(Aluminum) with Aluminum Base Plate, For Industrial, Size: 24 Inch(610mm) with neccesary accessories including labour charges turbo ventilator

42

15400

646800

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Providing & fixing Electroplated Foundation Bolts of EN 4.6 Grade with required double nuts including cost of Labour charges for fixing in position, overheads and contractor's profit, etc. complete for finished item of work.

0.75

107707

80780.25

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Providing & fixing Foundation Bolts of EN 4.6 Grade with required double nuts including cost of Labour charges for fixing in position, overheads and contractor's profit, etc. complete for finished item of work.

1

82712

82712

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Procuring, Fabrication, Shot Blasting (SA-2.5), Epoxy painting of 2 coats of epoxy Finish over one coat of epoxy primer (total DFT of 150 microns), Transportation and installation of Pre-engineered Building (PEB) other structural items with Hot Rolled Items which includes Rod or Angle barcings, Pipe Struts, Sag Angles, Flange brace, Mezzanine Staircase, Hand rails, Cage Ladder, etc., Members fabricated from hot rolled structural shapes shall conform to the physical specifications of ASTM A572/ A572M (Grade 36) or equivalent and shall have a minimum yield strength of 250 MPA including cost and conveyance of hinges and all wastages and all operational, incidental, Labour charges for fabricating steel works including cost of welding rods, power charges, including cost of fixing in position, including cost of Labour charges, etc. complete in position etc. complete for finished item of work. For Truss- Sag Rods

1.5

178251

267376.5

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Procuring, Cold forming, Transportation and installation of Pre-engineered Building (PEB) Secondary members which includes Purlins, Girts, Edge Angle, etc. Members formed from Galvanized Coils of 275 GSM and will conform to the physical specifications of ASTM A572/ A572M (Grade 50) or equivalent and shall have a minimum yield strength of 345 MPA. including cost and conveyance of hinges and all wastages and all operational, incidental, Labour charges for fabricating steel works including cost of welding rods, power charges, including cost of fixing in position, including cost of Labour charges, overheads & contractor's profit, etc. complete in position etc. complete for finished item of work For Cladding with Z-TYPE,For Shed alround upto truss bottom & Gable Portion

8.2

188535

1545987

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Procuring, Cold forming, Transportation and installation of Pre-engineered Building (PEB) Secondary members which includes Purlins, Girts, Edge Angle, etc. Members formed from Galvanized Coils of 275 GSM and will conform to the physical specifications of ASTM A572/ A572M (Grade 50) or equivalent and shall have a minimum yield strength of 345 MPA. including cost and conveyance of hinges and all wastages and all operational, incidental, Labour charges for fabricating steel works including cost of welding rods, power charges, including cost of fixing in position, including cost of Labour charges, overheads & contractor's profit, etc. complete in position etc. complete for finished item of work. For Truss

16

188535

3016560

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Procuring, Fabrication, Shot Blasting (SA-2.5), Epoxy painting of 2 coats of epoxy Finish over one coat of epoxy primer (total DFT of 150 microns), Transportation and installation of Pre-engineered Building (PEB) Primary members which includes all built-up Main columns, Main rafters, Mezzanine Columns, Mezzanine Beams, Mezzanine Joists with fixing of all necessary base plates, gusset plates & other connection plates. Members fabricated from plate or bar stock shall have flanges and webs joined on both side of the web by a continuous welding process and will conform to the physical specifications of ASTM A572/ A572M (Grade 50) or equivalent and shall have a minimum yield strength of 345 MPA including cost and conveyance of hinges and all wastages and all operational, incidental, Labour charges for fabricating steel works including cost of welding rods, power charges, including cost of fixing in position, including cost of Labour charges, overheads & contractor's profit, etc. complete in position etc. complete for finished item of work. For Truss

87

183585

15971895

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Providing 160 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., and overheads & contractors profit complete for finished item of work. (APSS No. 1328) Down take pipe

40

555

22200

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws etc., including cost and conveyance of all materials , labour charges , but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors Rain gutter

120

1111

133320

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Providing and fixing precoated galvanised steel sheet roofing accessories 0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws etc., including cost and conveyance of all materials , labour charges , but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors Ridge

60

451

27060

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Providing 10mm thick UV resistant multiwall polycarbonate sheets fixed to the purlins with aluminum universal glazing set 40mm wide for jointing and fixing sheets and 14 size selfdrilling screws with neoprene washer. Side laps are stitched with self-tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape including cost and conveyance of all materials and labour charges, overheads and contractor's profits , etc. complete for finished item of work

251

2400

602400

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Roofing with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove including cost and conveyance of all materials , labour charges ,but excluding taxes like GST etc., overheads and contractors profit etc., complete for finished item of work in all floors. for Roofing & Cladding

3819

957

3654783

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ liter for exterior walls including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., but excluding taxes like GST and overheads & contractors profit complete for finished item of work in all floors.

754

334

251836

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, incidental, operational and all labour charges but excluding taxes like GST etc., and overheads & contractors profit complete for finished item of work in all floors.

651

229

149079

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supplying and fixing of MS Grill to windows / in open court yards using 25mm x 6mm MS flat alround and 10mm MS square bars horizontally at 125mm centre to centre and vertically at 300mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including cost all taxes and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work.

70.2

1489

104527.8

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) 3 Track?3 Panel Sliding windows duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (62mm x 60 mm)/(60 mm x 45 mm) x 2.20 mm for outer frames, (66 mm x 38 mm)/(58 mm x 39 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractors profit etc., complete for finished item of work.

70.2

8088

567777.6

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Extra for providing grilled rolling shutters out of 8mm dia M.S.bar instead of laths as per design approved by Engineer-in-charge (area of grill to be measured) includingcost and conveyance of all materials and labour charges etc., overheads & contractors profit complete for finished item of work

14.4

760

10944

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Extra for providing mehanical device chain and crank operation for operating rolling shutters in the area exceeding 10.00 Sqm and upto 16.80 Sqm including cost and conveyance of all materials and labour charges etc., overheads & contractors profit complete for finished item of work

115.2

1260

145152

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc., overheads & contractors profit complete for finished item of work as per special spn: 1108

115.2

5217

600998.4

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904).

651

625

406875

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904).

550

656

360800

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges and taxes like GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904)

204

212

43248

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;RCM facia 50mm thick in CM (1:3) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer-In-Charge with dubara sponge finishing,including cost and conveyance of all materials to site, sales & othertaxes on all materials,operationals &incidental,cost and conveyance of cement,wire mesh,water to work site,centering, scaffolding and form work,lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work (APSS NO.403&903).

54

3475

187650

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 402)

1.9

6904

13117.6

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials , centering using Steel scaffolding pipes, jack props, Steel centering Plates etc.,for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903).

81

784

63504

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using weigh batcher / mixer including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for sill slabs.

1.7

9009

15315.3

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509).

121.8

991

120703.8

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Masonry work in CM (1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, and labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work but excluding seignorage chages and taxes like GST. (APSS No. 501 & 504).

94

8954

841676

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Providing Mild steel (MS) steel bars (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.(APSS No.126) RCM Facia

0.2

90929

18185.8

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126).

20

87351

1747020

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Lintel beam upto 3.6 mts level

11

16174

177914

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Columns

38

16386

622668

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Plinth beams

16.4

15573

255397.2

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Footings

115

12311

1415765

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Vibrated Plain Cement Concrete (1:3:6) nominal mix using 40mm size machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc. to site, excluding seigniorage charges, GST on all materials, all charges for mixing, laying concrete in position, vibrating, curing , centering charges , overheads & contractors profit etc., for finished item of work for footings and basement.

75

6818

511350

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Filling with useful available excavated earth by manual means (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for finished item of work. (APSS NO. 309 & 310)

376

256

96256

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Filling with carted gravel by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for fnished item of work. (APSS NO. 309 & 310)

2261

507

1146327

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work but excluding seigniorage charges & taxes like GST etc.. (APSS No. 402).

268

5487

1470516

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Grouting the holes with neat cement slurry excluding cost of steel but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work

65

132

8580

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Drilling holes of 25 mm dia and 800mm deep in hard rock or sheet rock with pneumatic compressor and placing of 20mm dia Tor steel bars and grouting the holes in CM(1:2) prop. excluding cost of steel and its fabrication charges but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work.

65

182

11830

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock.

9

7807

70263

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work but excluding seigniorage charges & taxes like GST etc. (APSS No. 402).

20

5679

113580

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Earth work excavation for foundations for buildings in hard rock (blasting prohibited) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

81

2674

216594

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary rock (not requiring blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

81

170

13770

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308).

376

135

50760

... More
CONSTURCTION OF PEB SHED FOR MEGA OIL PACKING STATION;Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps including all labour charges.

2715

5

13575



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.