Telangana State Cooperative Oilseeds Growers Federation Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Telangana State Cooperative Oilseeds Growers Federation Limited Tender
Civil And Construction
Building Construction
Opening Date15 Jun 2023
Closing Date23 Jun 2023
Tender Amount₹ 57,17,398
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
429168Bid Award Id
ViewTender No
P&P/ASPT/CIVIL WORK-POWER PLANT/618/22-23Tender Authority
Telangana State Cooperative Oilseeds Growers Federation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
CONSTRUCTION OF CHIMNEY;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. For foundations
5
4796
23982.88
... More
CONSTRUCTION OF CHIMNEY;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work for footings, Pedestals & Plinth Beam
12
9264
111172.52
... More
CONSTRUCTION OF CHIMNEY;Supply and placing of the Design Mix Concrete at all heights up to height 40.0m of M 30 grade concrete corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work for circular Walls Chiney Concrete Upto 15M
40
11448
457920
... More
CONSTRUCTION OF CHIMNEY;Supply and placing of the Design Mix Concrete at all heights up to height 40.0m of M 30 grade concrete corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work for circular Walls Chiney Concrete 15M to 30M
26
13112
340912
... More
CONSTRUCTION OF CHIMNEY;Supply and placing of the Design Mix Concrete at all heights up to height 40.0m of M 30 grade concrete corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work for circular Walls Chiney Concrete 30M to 45M
18
14776
265968
... More
CONSTRUCTION OF CHIMNEY;Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
43
814
35002
... More
CONSTRUCTION OF CHIMNEY;Centering and shuttering including strutting, propping etc. and removal of form for: RCC chimey (circular) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses scaffolding etc. for circular walls
715
1140
815100
... More
CONSTRUCTION OF CHIMNEY;Fire Brick masonry for circular walls in RCC Chimney up to a height of 40.0m from finished floor level with High Heat Mortar mixed with water using Fire Brick - IS6 traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 200 Kg/Sqcm. including cost and conveyance of all materials like High Heat Mortar, bricks, water etc., to site, labour charges, like mixing mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work.For chimney inner wall lining
221
4158
918918
... More
CONSTRUCTION OF CHIMNEY;Fire Brick masonry for circular walls in RCC Chimney up to a height of 40.0m from finished floor level with High Heat Mortar mixed with water using Fire Brick - IS6 traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 200 Kg/Sqcm. including cost and conveyance of all materials like High Heat Mortar, bricks, water etc., to site, labour charges, like mixing mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work.Corbel Brick
2700
230
621000
... More
CONSTRUCTION OF CHIMNEY;Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works at all heights up to 40.0mtr.from finished floor level , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, scaffolding, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and overheads & contractors profit complete for finished item of work. Upto 15M
7
95276
666932
... More
CONSTRUCTION OF CHIMNEY;Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works at all heights up to 40.0mtr.from finished floor level , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, scaffolding, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and overheads & contractors profit complete for finished item of work 15M to 30M
4.2
101440
426048
... More
CONSTRUCTION OF CHIMNEY;Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works at all heights up to 40.0mtr.from finished floor level , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, scaffolding, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and overheads & contractors profit complete for finished item of work 30M to 45M
2.9
107604
312051.6
... More
CONSTRUCTION OF CHIMNEY;Supply & application of two coats of Fire retardant paint of superior exterior grade II over a coat relevent primer (as per recommendations of manufacturer) for exterior walls of RCC chimney up to a height of 40.0mtr. including cost and conveyance of all materials to site, incidental, operational, scaffolding and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.
318
233
74094
... More
CONSTRUCTION OF CHIMNEY;Providing Structural Steel as per IS-1161, of different diameters, cutting and fabricating to required sizes and shapes,placing in position as per approved designs and drawing to be supplied at the time of execution of work, including two coats of synthetic enamel paint over a coat of metal primer, complete cost and conveyance of all Mild steel sections and all wastages such as overlaps, couplings, welding joints, etc., and all operational, incidental, Labour charges for fabricating steel works including cost of welding rods, power charges, paints including cost of Labour charges for fabricating all heavy steel works at different heights up to 40.0m including cost of welding rods, power charges, etc excluding cost of fixing in position etc. complete for finished item of work.
3
143098
429294
... More
CONSTRUCTION OF CHIMNEY;Supply & Fixing of Lighting Arrester for Chimney+ Aviation Lamp at a height of 40.0m from FFL, plus Earth pit etc. as required including cost of all materials, labour, transport.
1
150000
150000
... More
CONSTRUCTION OF CHIMNEY;Lettering and emblem of TSOILFED- with Paint as directed by the officer -in charge
1
24535
24535