Telangana State Cooperative Oilseeds Growers Federation Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
388693Bid Award Id
ViewTender No
P&P/CIVIL WORKS- CHIMNEY/635/22-23Tender Authority
Telangana State Cooperative Oilseeds Growers Federation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
CONSTRUCTION OF CHIMNEY;Supply & application of two coats of Fire retardant paint of superior exterior grade II over a coat relevent primer (as per recommendations of manufacturer) for exterior walls of RCC chimney up to a height of 40.0mtr. including cost and conveyance of all materials to site, incidental, operational, scaffolding and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.
318
-
74094
CONSTRUCTION OF CHIMNEY;Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works at all heights up to 40.0mtr.from finished floor level , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, scaffolding, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and overheads & contractors profit complete for finished item of work 30M to 45M
2.9
-
312051.6
CONSTRUCTION OF CHIMNEY;Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works at all heights up to 40.0mtr.from finished floor level , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, scaffolding, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and overheads & contractors profit complete for finished item of work 15M to 30M
4.2
-
426048
CONSTRUCTION OF CHIMNEY;Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works at all heights up to 40.0mtr.from finished floor level , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, scaffolding, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and overheads & contractors profit complete for finished item of work. Upto 15M
7
-
666932
CONSTRUCTION OF CHIMNEY;Fire Brick masonry for circular walls in RCC Chimney up to a height of 40.0m from finished floor level with High Heat Mortar mixed with water using Fire Brick - IS6 traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 200 Kg/Sqcm. including cost and conveyance of all materials like High Heat Mortar, bricks, water etc., to site, labour charges, like mixing mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work.Corbel Brick
2700
-
621000
CONSTRUCTION OF CHIMNEY;Fire Brick masonry for circular walls in RCC Chimney up to a height of 40.0m from finished floor level with High Heat Mortar mixed with water using Fire Brick - IS6 traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 200 Kg/Sqcm. including cost and conveyance of all materials like High Heat Mortar, bricks, water etc., to site, labour charges, like mixing mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work.For chimney inner wall lining
221
-
918918
CONSTRUCTION OF CHIMNEY;Centering and shuttering including strutting, propping etc. and removal of form for: RCC chimey (circular) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses scaffolding etc. for circular walls
715
-
815100
CONSTRUCTION OF CHIMNEY;Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
43
-
35002
CONSTRUCTION OF CHIMNEY;Supply and placing of the Design Mix Concrete at all heights up to height 40.0m of M 30 grade concrete corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work for circular Walls Chiney Concrete 30M to 45M
18
-
265968
CONSTRUCTION OF CHIMNEY;Supply and placing of the Design Mix Concrete at all heights up to height 40.0m of M 30 grade concrete corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work for circular Walls Chiney Concrete 15M to 30M
26
-
340912
CONSTRUCTION OF CHIMNEY;Supply and placing of the Design Mix Concrete at all heights up to height 40.0m of M 30 grade concrete corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing , overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work for circular Walls Chiney Concrete Upto 15M
40
-
457920
CONSTRUCTION OF CHIMNEY;Supply and placing of the Design Mix Concrete M 30 grade corresponding to IS 456 with minimum cement content of 400 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work for footings, Pedestals & Plinth Beam
12
-
111172.52
CONSTRUCTION OF CHIMNEY;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. For foundations
5
-
23982.88
CONSTRUCTION OF CHIMNEY;Filling with useful available excavated earth (excluding rock) with a lead of 50 m in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work
128
-
9716.21
CONSTRUCTION OF CHIMNEY;Filling with carted coarse sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental ,labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work
14
-
20420.69
CONSTRUCTION OF CHIMNEY;Earth work excavation for foundations (Mechanical Means) for buildings in ordinary soils and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc.,
128
-
14330.64