Telangana State Cooperative Oilseeds Growers Federation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Cooperative Oilseeds Growers Federation Limited Tender

Works
Civil And Construction
Civil Works Others
Opening Date29 Sep 2023
Closing Date10 Oct 2023
Tender Amount₹ 19,30,842 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CONSTRUCTION OF COMPOUND WALL;Plastering 20mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

786

342

268812

... More
CONSTRUCTION OF COMPOUND WALL;Supplying and fixing galvanised steel Barbed wire conforming to IS 278 - 1978 weighing 9.38 kg per 100 metres(min.,), straining and fixing to any type of standard rails, straining bolts, including securing with and provision of galvanised mild steel wire, staples or steel pins, etc., as directed (posts and struts of wood, concrete, steel etc.,) including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. including overheads & contractors profit complete for finished item of work.

1222

17

21861.58

... More
CONSTRUCTION OF COMPOUND WALL;Supplying, fabricating and fixing of MS angles 50x50x6mm over compound wall including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. including overheads & contractors profit complete for finished item of work but excluding GST etc. 50x50x6 mm angles @ 4.5 Kg/RM and For Expansion Joint Piller

389

131

50959

... More
CONSTRUCTION OF COMPOUND WALL;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work but excluding seigniorage charges & GST etc . (APSS No. of 509). for compound wall

341

991

337931

... More
CONSTRUCTION OF COMPOUND WALL;Filling with useful available excavated earth by manual means (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for finished item of work. (APSS NO. 309 & 310)

99

256

25344

... More
CONSTRUCTION OF COMPOUND WALL;Providing Thermo Mechanically Treated (TMT) (Fe -500/500D/550D from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work. (APSS No.126). Footings, Columns, Plinth beam

2.53

87351

220998.03

... More
CONSTRUCTION OF COMPOUND WALL;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Plinth beam

13.1

15573

204006.3

... More
CONSTRUCTION OF COMPOUND WALL;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Column below G.L and above N.G.L

9.8

16503

161729.4

... More
CONSTRUCTION OF COMPOUND WALL;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with cement content of 380 kgs per 1 cum of concrete using weigh batcher / mixer with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, centering using steel scaffolding pipes , jack props , wallers , foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, vibrating, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work but excluding seigniorage charges & GST etc (APSS No. 402) Column footings.

19

12311

233909

... More
CONSTRUCTION OF COMPOUND WALL;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work but excluding seigniorage charges & taxes like GST etc. (APSS No. 402).

7.8

5679

44296.2

... More
CONSTRUCTION OF COMPOUND WALL;Plain Cement Concrete M 20 design mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, overheads & contrctors profit etc., complete for finished item of work but excluding seigniorage charges & GST etc(APSS No. 402 & 403) for steps & Sheet Rock. For Column Footings

0.9

7807

7026.3

... More
CONSTRUCTION OF COMPOUND WALL;Grouting the holes with neat cement slurry excluding cost of steel but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work For Column Footings

37

132

4884

... More
CONSTRUCTION OF COMPOUND WALL;Drilling holes of 25 mm dia and 800mm deep in hard rock or sheet rock with pneumatic compressor and placing of 20mm dia Tor steel bars and grouting the holes in CM(1:2) prop. excluding cost of steel and its fabrication charges but including cost and conveyance of all materials and labour charges etc.,and overheads & contractors profit complete for finished item of work. For Column Footings

37

182

6734

... More
CONSTRUCTION OF COMPOUND WALL;Earth work excavation for foundations for buildings in hard rock (Prohibited blasting) and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

13

2674

34762

... More
CONSTRUCTION OF COMPOUND WALL;Earth work excavation for foundations (Manual Means) of buildings in ordinary rock (not requiring blasting) and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

13

451

5863

... More
CONSTRUCTION OF COMPOUND WALL;Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)

104

316

32864



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.