Telangana State Forest Development Corporation Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
357153Bid Award Id
ViewTender No
TSFDC/6.2.11/HDM/CIVIL/2022-23Tender Authority
Telangana State Forest Development Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Plain Cement Concrete corresponding to M15 grade as per IS 456 equivalent to (1:2:4) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 402)
54.41
-
442576.38
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Vibrated Reinforced Cement Concrete corresponding to M20 grade design mix using 350 kg. of cement, graded Metal of 20mm size HBG (SS5) metal from approved quarry including Cost and Conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental and labour charges such as mixing, laying, curing concrete for 21 days etc., complete for finished item of work. (APSS No. 402) for Columns
1.05
-
15225.32
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Cleaning, levelling the area and making suitable for chain link fencing with for removing undulations, boulders and unwanted bushes through over the length of the chainlink fencing before excavation
1170
-
468
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)
468
-
89037
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Supply, Cutting ro reqiured length welding where ever reqiured, grinding the edges smooth applying a primary coat of red oxide and painting with two coats of synthetic enamel paint, fabrication, hoisting and installation all as per specification at all heights
3812.64
-
463617.02
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Supply and fixing of MS Gate including cost and conveyance of all materials and fabrication charges etc complete
300
-
36480
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including Cost and Conveyance of bars from approved sources to site of work including Cost and Conveyance of binding wire, cover blocks chains, overlaps, spacers, dowels, wastage etc, and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work (APSS No.126) in all floors
0.25
-
26587.63
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors
475.6
-
109055.08
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors.
125.29
-
14433.41
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Supplying and fixing of Chain link fencing of mesh size 2"x2"- 8 guage (50 mm x 50 mm-4.0 mm) including welding the chain link fencing to the MS Angle vertical posts, horizontal ties and including tack welding to the chain link fencing at 300 mm -400 mm inteval to the MS vertical posts and horizontals including cost and conveyance of all materials and labour charges for all operations etc., complete for finished item. (IS 2721-2003 / IS 2721-1979)
1064.7
-
521170.65
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Supply and fixing of 50mm length 16mm Dia nut bolts 2 Nos per running meter for Top and Midddle Horizontals
1170
-
28454.4
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Supply and fixing of 40mm x 5mm 150mm long Ties 0.23Kg each (530.23=121.90 Kgs) per each running meter
1170
-
32724.9
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Drilling 16 mm dia Holes @ Rs. 4.20 per Hole
390
-
1638
... More
Construction of Balance chain link fencing at CTD Sathupalli of Sathupallii Division;Supply and Tightening the G I 4mm wire along the Chain link mesh at Top and Bottom including Lanour charges and complete
10000
-
10000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements