Telangana State Forest Development Corporation Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Telangana State Forest Development Corporation Limited - TSFDC Tender

Civil And Construction
Building Construction
Opening Date21 Nov 2022
Closing Date28 Nov 2022
Tender Amount₹ 1,20,47,708 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete but excluding seigniorage charges for finished item of work for foundation and basement (APSS No. 601 & 615)

44.5

-

190164

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) For Raft Slab

-

-

-

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) Footings

46

-

499217

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) Plinth beams

15.3

-

209999

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges for finished item of work but excluding seigniorage charges (APSS No. 402 & 403) Pedestals

13.1

-

150843

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Columns Ground Floor:

13.8

-

197163

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Columns First Floor :

5.52

-

83192

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) 150 mm thick internal walls

2

-

28574

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Cashewrina Ballies and Wooden runners & staging including all bracings, cross members etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) 225 mm thick Side walls

10.7

-

152873

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Roof beams Ground Floor :

20.9

-

265739

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Roof beams First Floor :

5.5

-

72932

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Roof Slabs Slabs 115 mm thick Ground Floor :

27

-

39226

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Roof Slabs Slabs 125 mm thick Ground Floor :

256.5

-

390406

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Roof Slabs Slabs 125 mm thick First Floor :

55.2

-

87583

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Roof Slabs Slabs 150 mm thick Ground Floor :

15.88

-

26918

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Roof Slabs Slabs 150 mm thick First Floor :

6

-

10593

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Lintels Ground Floor :

2.4

-

30256

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Reinforced Cement Concrete M 20 Design Mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS5) hard blasted granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering , machine mixing, laying concrete, lift charges, curing etc., complete but excluding cost of steel and it?s fabrication charges but excluding seigniorage charges for finished item of work (APSS No. 402 & 403) Lintels First Floor :

1.1

-

14555

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS 5) machine crushed hard blasted granite graded metal (coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc., complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item of work Sun Shades Ground Floor :

16.5

-

18495

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS 5) machine crushed hard blasted granite graded metal (coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc., complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item of work Sun Shades First Floor :

4

-

4706

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS 5) machine crushed hard blasted granite graded metal (coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc., complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item of work Platforms Ground Floor :

4.5

-

4447

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS 5) machine crushed hard blasted granite graded metal (coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc., complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item of work 25mm thick shelves : Ground Floor :

8.4

-

6909

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Reinforced cement concrete with M 20 grade Design mix ( by weigh batching ) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size (SS 5) machine crushed hard blasted granite graded metal (coarse aggregate) from approved quarry using a minimum quantity of 350 Kg of cement per 1 Cum of concrete including cost and conveyance of all materials like cement, fine aggregate (sand) ,coarse aggregate, water etc. to site and cost of all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates,etc., shuttering, machine mixing, laying concrete, for sunshade of 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including labour charges for mixing, laying, curing etc., complete but excluding cost of steel and its fabrication charges but excluding seigniorage charges for finished item of work 25mm thick shelves : First Floor :

3

-

2591

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504). Ground Floor :

56.9

-

462116

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504). First Floor :

25.2

-

218550

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: using Fly Bricks of size 290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges & seignerage charges complete for finished item of work. (APSS No. 501 & 509). Ground Floor :

249.56

-

233380

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: using Fly Bricks of size 290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges & seignerage charges complete for finished item of work. (APSS No. 501 & 509). First Floor :

111.73

-

113997

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Reinforced Fly Ash Brick Masonry 10cm thick for partition walls in CM (1:4) prop: using Fly Bricks of size 290x100x140mm with compressive of 50 Kgs / Sqcm from approved source and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges & seignerage charges complete for finished item of work. (APSS No. 501 & 509). Terrace Floor :

34.5

-

38133

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete but excluding seigniorage charges for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402) Ground Floor :

2

-

11446

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete but excluding seigniorage charges for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402) First Floor :

0.7

-

4118

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying concrete, finishing top surface, curing concrete, etc., complete for finished item of work for Dummy Columns. (APSS No. 402) First Floor :

1.2

-

11039

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using Manufactured Sand (Rock sand) and natural river sand in the ratio of 50:50, 20mm size Hard Blasted Granite (IS383, 1970) Machine Crushed graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying concrete, finishing top surface, curing concrete, etc., complete for finished item of work for Dummy Columns. (APSS No. 402) Terrace Floor :

1.1

-

10836

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) Ground Floor :

18.27

-

1654890

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) First Floor :

2.8

-

257774

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) Terrace Floor :

0.3

-

28067

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing Mild Steel Bars (Fe 250 grade as per IS 432) of 6mm diameter, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors. Ground Floor :

0.5

-

40873

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing Mild Steel Bars (Fe 250 grade as per IS 432) of 6mm diameter, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors. First Floor :

0.1

-

8236

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Ornamental Plastering 12mm thick single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall but excluding seigniorage charges for finished item of work. (APSS 901,903 & 904) Ground Floor :

338

-

73779

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Ornamental Plastering 12mm thick single coat in CM (1:5) including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall but excluding seigniorage charges for finished item of work. (APSS 901,903 & 904) First Floor :

51

-

12284

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for internal walls Ground Floor :

943.4

-

492408

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) for internal walls First Floor :

189

-

107966

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) External walls Ground Floor :

364.9

-

190460

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) External walls First Floor :

328.91

-

187888

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) External walls Terrace Floor :

73.4

-

45548

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Plastering with CM(1:6) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)

13

-

2448

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903). First Floor :

134

-

76943

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903). First Floor :

197

-

121588

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete but excluding seigniorage charges for finished item of work (APSS No. 901 & 903). Terrace Floor :

64.5

-

42583

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Flush Pointing to RR/CRS Masonry in CM(1:3) Prop: including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS 901,906)

67.7

-

7193

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade of size not less than 300mm x 300mm as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick using screened sand laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707) in All Floors Ground Floor :

19.41

-

18043

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Flooring with Ceramic Tiles of 7.3mm thick 1st. quality of any shade of size not less than 300mm x 300mm as approved by Engineer - in - charge set over a base coat of CM (1:8), 12mm thick using screened sand laid over flooring bed / V.R.C.C. slab, with neat cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with neat white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles etc. to site, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work.(APSS No.701 & 707) in All Floors First Floor :

5

-

4886

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Flooring with vitrified polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less than 598 mm x 598 mm , 8mm thickness regular finish and normal colours with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707) Ground Floor :

241.3

-

265189

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Flooring with vitrified polished floor tiles of 1st quality and make as approved by Engineer-in-charge of size not less than 598 mm x 598 mm , 8mm thickness regular finish and normal colours with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707) First Floor :

30

-

34410

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the edges flat nosed and set over a base coat of CM (1:8) screened sand , 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work for Treads (APSS No.701 & 707) Treads of 0.30 Mt wide Ground Floor :

18

-

103030

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the edges flat nosed and set over a base coat of CM (1:8) screened sand , 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work for Treads (APSS No.701 & 707) Treads of 0.30 Mt wide First Floor :

7

-

40683

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the edges flat nosed and set over a base coat of CM (1:8) screened sand , 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work for Treads (APSS No.701 & 707) For Midlandings Ground Floor :

4.61

-

26387

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the edges flat nosed and set over a base coat of CM (1:8) screened sand , 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work for Treads (APSS No.701 & 707) For Midlandings First Floor :

2

-

11624

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work For Treads & raisers (APSS No.701 & 707) For Raisers of 0.15 Mt. Height Ground Floor :

10.24

-

44556

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing of High polished Granite 16 to 18 mm thick up to 8' 00" (2.43M) black in Single piece with the edges flat nosed and set over a base coat of CM (1:3), 12mm thick, and fixing in position with neat cement paste including cost and conveyance of all materials like cement, sand, water, stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of stones to the required sizes, mixing of cement mortar, fixing in position, curing, lift charges etc., complete for finished item of work For Treads & raisers (APSS No.701 & 707) For Raisers of 0.15 Mt. Height First Floor :

4

-

17641

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5) using screened sand, 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work (APSS No.701 & 707) in All Floors Ground Floor :

75.9

-

71164

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5) using screened sand, 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete but excluding seigniorage charges for finished item of work (APSS No.701 & 707) in All Floors First Floor :

23

-

22278

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing skirting to internal walls to 10 cm height with vitrified tiles 8mm thick , regular finish and normal colour, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sandwith cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete for finished item of work.(APSS No.701 &707) Ground Floor :

36.1

-

39421

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing skirting to internal walls to 10 cm height with vitrified tiles 8mm thick , regular finish and normal colour, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sandwith cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete for finished item of work.(APSS No.701 &707) First Floor :

5

-

5700

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing and applying Wall putty of White Cement or Polymer or Cement based of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, over heads and contractors profit etc., complete for finished item of work in all floors for Internal walls Ground Floor :

1283.3

-

316462

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer interior grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for internal Walls.(APSS No. 912) in All Floors

1316.9

-

252252

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors

437.2

-

115639

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing and applying Exterior grade Texture ready mixed plaster made with natural minerals - granite flakes/ marble flakes/ powder, sand and other carefully selected and sieved minerals in an acrylic binding medium of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty/ texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges, scaffolding charges, overheads and contractors profit etc., complete for finished item of work in all floors for external walls

437.2

-

189745

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Painting to New wood work with two coats of ready mixed synthetic enamel paint Grade I all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors

124.4

-

30347

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors

22.2

-

2748

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works over 2 or more coats of French spirit polish duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work

19.9

-

30751

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Manufacturing supplying and fixing of MS gate, Grills for compound wall by using Structural steel as per approved designs and drawings including fixing in position, cost conveyance of all materials and labour charges for finished item of work

22.2

-

2639

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and Fixing of Door with Double leaf shutter, Door Size 1.5x2.13mtrs with Medium teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long MS Powder coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, Door stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

4

-

62348

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Medium teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long MS Powder coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, MS Powder coated heavy Door stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

6

-

80016

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and Fixing of Door with Single leaf shutter, Door Size 0.90x2.13 mtrs with Medium teak Wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on both faces of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower Bolts 250mm long 1 Nos, MS Powder coated Handels 150mm long 1 No, 300mm long MS Powder coatedAldrops 1No, 125mm long MS Powder coated butt hinges 3 Nos, 300 mm long MS Powder coated Flat latch 1No, Door stoppers 1 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

15

-

158775

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and Fixing of Door with Single leaf shutter, Door Size 0.75x2.13 mtrs with Medium teak Wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood black board type with commercial ply on both faces of 35mm thick including cost of fixtures such as M.S.Powder Coated Tower Bolts 250mm long 2 Nos, M.S.Powder Coated Handels 150mm long 1 No, 300mm long M.S.Powder Coated Aldrops 1No, 125mm long M.S.Powder Coated butt hinges 3 Nos, 300 mm long M.S.Powder Coated Flat latch 1No, Door stoppers 2 Nos, MS Hold fasts 6Nos, Sales and Other Taxes cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame on shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.

4

-

37784

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin)of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

56.2

-

454602

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing, supplying & fixing of Fixed Louvered Ventilator made out of multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

3.2

-

23296

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing of stainless steel hand railing as per approved drawing with top rail of 64mm dia (outer) 2mm thick pipe, vertical balusters of 50mm dia 2mm thick at 600mm c/c spacing (7 Nos)and 3 nos 25mm dia (outer) 1.6mm thick stainless steel pipes below top rail with equal spacings and 50mm wide 8mm thick SS plate for fixing vertical balusters at 600mm centre with 100x100mm stainless steel base plate to be fixed to the steps with Anchor fasteners. The rate should include providing and using bonding agent, drilling of 25mm holes of fixing railing , polishing of all nos of railing thouroughly and also including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges such as for fabrication of SS pipes, buffing, polishing etc., complete for finished item of work.

32.2

-

200252

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 4 Kg/cm2 pressure including Cost of necessary pvc bends, shoes and M.S.clamps and all other accessories and fixing in position including cost and conveyance of all materials to site , seigniorage charges sales and other taxes on all materials, all operational, incidental and labour cahrges such as fixing in alignment etc., complete for finished item of work.(APSS NO1328) in All Floors

18

-

7553

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Reinforced cement mortar Facia 5 cm thick in CM (1:3) for drop walls, Fins & staircase railing with rabbit wire mesh & nominal reinforcement as directed by Engineer-in-charge with dubara spong finishing including cost & conveyence of all materials to site, including sales and other taxes on all materials and all operational, incidental charges such as labour charges, like mixing cement mortar, scaffolding charges, lift charges, curing, for making 50 mm thick RCM Paradah walls (RCM Drop walls) including tying Rabbit (chicken) wire mesh to the existing mild steel / HYSD Steel reinforcement applying mortar lumps, finishing, plastering to both faces, sponge finishing etc complete for finished item of work but excluding cost of steel and its fabrication charges and seigniorage charges in All Floors

3

-

5882

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and delivery of encapsulated plastic steps manufactured as per companies standard specification including cost of materials packing as per companiess standards, loading, transportation, unloading and stacking at site of work , and taxes such as complete sales tax,C.E.D and others etc., as applicable including labour charges for fixing etc. complete for finished item of work

36

-

7992

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing Gyp Board Suspended regular single layer false ceiling (GS-MFSC-4.1) using 12.5 mm thick Gyp Board conforming to IS 2095 - 1993 fixing to Gyp steel GI perimeter channels of size 20 mm x 27 mm x 30 mm(web) of 0.55 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using Intermediate channels (45 mm x 15mm x 15mm x 0.9 mm) from soffit at 1220 mm c/c with ceiling angle (25 mm x 10 mm x 0.55 mm) fixed with GI Cleat and steel expansion fasteners & connecting clip to the ceiling channels (with knurled web of 51.5 mm x 26 mm x 10.5 mm x 0.55 mm) fixed in direction perpendicular to the intermediate channel at 457 mm c/c and fixing the 12.5 mm tapered edge Gypboard with 25 mm drywall screws at 230 mm c/c & jointing and finishing using joint compound and paper tape to have a flush look including filling the tapered & square edges with jointing compound, two coats of drywall topcoa including overheads and contractor profit etc., complete for finished item of work

265.3

-

316344

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and laying, filling, jointing and testing SWG SP-1 pipes of ISI make confirming to IS 1651 & 4127 1st quality with air tight Cement joints in CM (1.5:1)prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping including cost and conveyance of all materials to site and all labour charges for finished item of work (APSS NO 1301 & 1318) 101.60mm dia upto 914.40mm (3') depth

75

-

47737.5

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and laying, filling, jointing and testing SWG SP-1 pipes of ISI make confirming to IS 1651 & 4127 1st quality with air tight Cement joints in CM (1.5:1)prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) and refilling with watering and tamping including cost and conveyance of all materials to site and all labour charges for finished item of work (APSS NO 1301 & 1318) 152.40mm dia upto 1524.0mm (3') depth

70

-

63721

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing 150.00mmx100.00mm SWG gully trap 1st class confirming to ISI 651 & 4127 with CI grating and constructing single brick masonry wall chamber of size 20" x 14" x 12? in CM (1:6) prop. Over a CC (1:5:10)prop. bed, and fitted with 304.8 mm x 225.6 mm(12" x 9") CI frame and hinged cover and plastering 12mm thk. in CM (1:4) prop. both inside and outside surfaces and including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work. SSR ITEM NO.527

4

-

3281.2

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Constructing 457.2mm x 457.2mm (1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm (1'-6" x 1"-6") frame and cover of 20kg., including cost and convenyance of all materials to site, all labour charges, sales and otehr taxes on all materials etc., complete for finished item of work

4

-

20214.4

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

3

-

29350.2

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

3

-

47551.35

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing UPVC/SWR Nahani traps 4" or 101.6mm dia 1st quality ISI marked conforming to IS:1729-1979 with 4" dia SS Grating fixing with white cement as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work.

10

-

1466

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal components and fixed using required size of nails and screws, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

8

-

45718.64

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso or equivalent complete with standard CI brackets including wooden block ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 300 gms Seiko or equivalent including cost and conveyance of all materials to site, labour charges etc. complete for finished item of work

8

-

31085.6

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing CP finish brass soap dish of approved make ISI quality with CP screws etc., complete including cost and conveyance of all materials, labour charges for fixing , overheads & contractors profit for finished item of work in all floors

8

-

5695.6

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm , plywood back with NP screws 1st quality including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

8

-

4944.8

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing of 25.4mm dia , 609.6mm long aluminium anodized towel rods with brackets and aluminium screws including cost and conveyance of all materials, labour charges etc., complete for finished item of work.

8

-

1590.8

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal /external threaded conenction conforming to IS 8931 including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

10

-

3111

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;S&F of 15 mm brass body CP finish self closing tap lift type conforming to IS 1711 including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

8

-

2724.94

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 7 - 10 years warranty with necessary fittings etc., complete including cost and conveyance of all materials, labour charges, overheads & contractor profit complete for finished item of work in all floors.

8

-

31016

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007) 15.9 mm OD Pipe SDR 13.5

40

-

6772

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007) 22.2 mm OD Pipe SDR 13.5

50

-

9715

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007) 28.6 mm OD Pipe SDR 13.5

70

-

17976

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007) 34.9 mm OD Pipe SDR 13.5

100

-

22840

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of Ashirvad/Ajay/Astral Flowgaurd or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS( copper tube sizes 1/4" to 2" ) ashirwad flowgaurd SDR11 and SDR 13.5 pipes are made from identical CPVC components having the same physical properties for Hot and cold Water confirming to (IS 15778-2007) 41.3 mm OD Pipe SDR 13.5

75

-

34683.75

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing PPR ball valve of 25 mm dia confirming to DIN standards 8077/8092 , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work.

4

-

1168

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing PPR ball valve of 32 mm dia confirming to DIN standards 8077/8092 , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work.

4

-

1218

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supplying and fixing PPR ball valve of 40 mm dia confirming to DIN standards 8077/8092 , Indian make heavy type including cost and conveyance of all materials , labour charges etc. complete for finished item of work.

4

-

2490.6

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of CI pipes 76.2 mm Single socket ISI marked confirming to IS: 1729 - 1979 of reputed make with cement caulked joints and paintaed black with japan paint and fixing with necessary woden blocks fixed in the masoery walls in CM (1.5:1) including fixing of MS clamps of necessary size and required no of Bombay nails etc., complete including cost and conveyance of all materials to site all labour charges sales and other taxes on all materials etc.,, complete for finished item of work all Floors

60

-

64188

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of CI pipes 101.6mm Single socket ISI marked confirming to IS: 1729 - 1979 of reputed make with cement caulked joints and paintaed black with japan paint and fixing with necessary woden blocks fixed in the masoery walls in CM (1.5:1) including fixing of MS clamps of necessary size and required no of Bombay nails etc., complete including cost and conveyance of all materials to site all labour charges sales and other taxes on all materials etc.,, complete for finished item of work all Floors

60

-

82935

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges for placing and fixing in position as directed by Engineer-in-Charge.

1000

-

10250

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all labour charges etc. complete

35

-

3578.75

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and Fixing of ISI 25mm outer dia heavygrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

1300

-

131885

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and Fixing of ISI 25mm outer dia mediumgrade, FRLS with IS:9537 part 3 regid PVC pipe. concealed in wall with all required accessories including masonary work for light, fan and separate plug point with 8 or 9 Module Hot dip galvanized Metal Box including all labour charges etc., complete. Makes : Sudhakar / Goldmedal / Modi / AKG / VIP / MillionPlast / Precision

900

-

102240

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box with hook including all Labour charges etc., complete.

13

-

2535

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant Low Smoke (FRLS) / HFFR P.V.C. insulated 1100 V Grade as per IS: 694 / 1990 specification for flexible copper cable (ISI MARK) in existing pipe with 6A 1 way modular switch, Ceiling rose including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR). Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

91

-

79820.65

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant Low Smoke (FRLS) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A 2 Way Modular switch, Ceiling rose and Modular cover frame to switch control box including all labour charges etc., complete for Stair case and 2 way light / fan points in Non-Residential Buildings Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR). Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

2

-

2631.5

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of 6A 3/2 pin Modular wall plug socket with shutter and 6A 1 way modular switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

16

-

5349.6

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Wiring with 3 of 22/0.3mm ( 1.5 Sq.mm) FRLS / HFFR P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch and 6A, 3/2 pin socket Modular type with 6A switch control and MS boxes with cover plate and GI switch box fixing on separate board including all labour charges etc., complete. Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR). Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

30

-

21780

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of 3 Nos 6A ISI mark Modular type switch with 3Nos 6A 3/2 pin wall plug socket on suitable size Modular deep box with cover frame GI switch box fixing on separate board including all labour charges etc., complete. Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

8

-

9556.4

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and Fixing of 16A/6A 3pin plug socket with shutter and 16A modular switch control duly recessed in wall with Galvanised hot deep box of with common switch board including earth connections and all labour charges etc., complete. Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

12

-

5784

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and run of 1 of 22/0.3 mm ( 1.5 sq.mm) FRLS / HFFR PVC insulated 1100 V grade as per IS: 694 / 1990 specifications for flexible copper cable for existing pipe for earth continuity including all labour charges etc., complete. Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

450

-

17100

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and run of 3 of 2.5 Sq mm PVC F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connection. Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

450

-

71842.5

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and run of 3 of 4 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connection Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

400

-

96980

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and run of 3 of 6 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connections Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

200

-

66030

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and run of 5 of 6 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connections Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

30

-

16507.5

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and run of 5 of 10 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications and 1 run of 6 Sq mm F.R L.S. / HFFR P.V.C. insulated flexible copper cable 1100 V grade as per IS: 694 / 1990 specifications in the existing conduit pipe for run of mains from main panel board to TPN DB'S with pin type lugs and connections Makes of Wires : Finolex / RR kabel / Havells / Polycab / KEI (HFFR) /DEC (HFFR)/ V-Guard (HFFR).

30

-

25393.5

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing Distribution board with 20A single phase plug and Socket, in sheet steel enclosure with 10/16/20A SP MCB including internal connection and labour charges for flush mounting etc., complete Makes : Legrand / Schneider / Siemens / L&T Makes of MCB: Legrand-DX3 / Schneider-Acti9 / Siemens / L&T Exora.

4

-

9443.6

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing 4 WAY TPN Distribution board with IP-43 protection (Metal Door) as per IS 13032 and suitable for 1 No. 3 phase ELCB / RCCB / FP Isolator as incomer and 12 Nos 40kA 10-32 A SP MCBs as outing goings including internal connection and labour charges for flush mounting etc., complete. Make: Legrand / Schneider/Seimens/L&T

3

-

35533.2

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing 4 WAY TPN Distribution board with IP-43 protection (Metal Door) as per IS 13032 and suitable for 1 No. 3 phase 63 FP Isolator as incomer and 12 Nos 10kA 10-32 A SP MCBs as outing goings including internal connection and labour charges for flush mounting etc., complete. Make: Legrand / Schneider/Seimens/L&T (Power DB's)

1

-

11970.5

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing 8 Way SPN Distribution board with IP-43 protection (Metal Door) suitable for 1 No. 40 A single phase ELCB / RCCB/DP Isolator as incomer and 8 Nos. 6-32 A 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete Makes : Legrand / Schneider / Siemens / L&T

2

-

12697.6

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing 8 Way TPN - Vertical type Distribution board with IP -43 Protection with 125A, 4 Pole 25 kA MCCB as incomer with 4Nos 63A TP MCBs and 12 Nos. 10 kA SPMCBs as outgoing including internal connection and labour charges for flush mounting etc. Make: Legrand / Schneider/Seimens/L&T

1

-

50113.35

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

4

-

26522.4

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and Run of 25mm x 6mm G.I Strip including cost of all accessories and labour charges etc., complete. (1.18Kgs/1Mtr)

50

-

7885

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete.

200

-

5350

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and Fixing and transportation of 20W +/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification, fixing on wall / Ceiling with / TW round blocks, 23/0060 Twin Core wire with all accessories including giving connections and all labour charges etc., complete. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

32

-

27339.2

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply,transportation and fixing of 18W +/- 10% LED edge lit LED slimline panel light Housing made of Pressure die cast aluminium with Powder coated, round / Square with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. Labour charges for fixing of Down lighters in false ceiling/Surface with all incidental accessories like cutting, arranging necessary Aluminium strip.,hooks.etc with screws,finishing false ceiling neatly to the satisfaction of civil and Electrical Engineer incharge including giving connections and all labour charges etc., complete. LUMINAIRE MAKE : Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar or equilent as approved by the Department

12

-

18828.6

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of batten holder / slanting holder (Makes : Anchor / Gold Medal Olive / Million Zoom). in lieu of ceiling rose of light point complete with all connections and all labour charges with 9 Watt LED lamp Makes : Phillips / Crompton / Bajaj / Surya / Havells / HPL/ Halonix.

18

-

4060.8

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM (tolerance as per IS:374-2019), THD less than 10%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient

13

-

42567.2

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of modular Electronic stept type fan regulator hum free step type socket size with MS box, front plate in the existing switch board ( Modular Type ) Makes Makes of Switches : Legrand Myrius / Havells Fabio / Million mway/ Gold Medal Curve / Anchor Roma viola / CPL Vysma/ Vimal / GM Four-Five / Salzar / Infinity

13

-

8064.55

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete. Makes : Finolex / RR Kabel / Havells / Polycab / GM / Million / V-Guard (HFFR) / Gold Medal / Kundancab / HPL / RPG /Nandicab / Nakoda / Payal / Finecab / Gemini / Vimal /Suncab

13

-

2858.05

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and erecting 19/20mm steel tube down rod of one meter length with bolts & nuts duly painted with matching colour of fan complete.

30

-

5137.5

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply,Transportation of light duty exhaust fan 9"(225 mm) size 900 rpm with metal blades wiremesh with all accessories etc complete. Makes : Crompton / Bajaj Bahar WG / Havells Ventil Air-DB / Orient hill air.

6

-

9996

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply of 12" (300 mm) 900 R.P.M of heavy duty exhaust fan 250V A.C.50Hz.. 300mm size etc., complete. Makes: Crompton / Almounard / Havells Turbo Force.

2

-

7306

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Labour charges for fixing of Exhaust fan in wall with necessary connections and masonary work of making hole, finishing etc., complete

8

-

4771.84

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and transportation of 60W LEDStreet light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Suitable lens on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments are IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >110 lumens/watt, with Ingress protection IP66, Potted driver, Driver surge protection >10KV, THD<15%, CCT: 3000- 6500K as desired by the department and as per IS, CRI>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the manufacturer warranty letter, LM 79 and LM 80 certificates.fixing on wall with 1.0mt 40mm dia GI pipe bracket and anti-tilting MS flat, 2.5 Sq.mm flexible copper cable etc.,including all labour charges for mason work and giving connections etc.,. LUMINAIRE MAKE : PHILIPS / OSRAM / GE Venture / CROMPTON / BAJAJ / Surya / Wipro / Jaquar / Eveready / Halonix / Keselec / HAVELLS / POLYCAB / SURYA / SYSKA / Capart / Fortune Arrt / FIEM / Panasonic / Arraystorm / GM / Goldmedal / Silicon / Leksa / Orient / HPL LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs. Makes: Finolex / RR kabel / Havells / Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR)

8

-

57792.8

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and laying of 2 pair telephone wire in the existing metallic/non metallic conduit pipe with connections etc.,complete Makes : Finolex / Delton / Surabi / Polycab

300

-

7515

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and laying of LAN cable Cat-6(A) UTP CABLE in the existing metallic/non metallic conduit pipe with connections etc.,complete Makes:D Link/ AMP / Molex / Legrand / Krone

350

-

14192.5

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of telephone jack type socket with top on MS box with modular plate cover with screws connections etc., Makes : GM G Home / Gold Medal Olive / Million Zoom /Anchor Penta Cherry / Great white Omega / HPL

7

-

3866.8

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and fixing of cat-6 RJ-45information outlets including dual face plate with MS box with modular plate cover with screws connections etc., (Makes : D Link / AMP / Molex / Legrand / Krone.)

10

-

4940

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply of 7 feet length moulded patch cord Makes : D Link / AMP / Molex / Legrand / Krone.

10

-

2613

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply of 3 feet length moulded patch cord Makes : D Link / AMP / Molex / Legrand / Krone. (Data-55)

10

-

2352

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply, Transportation and Fixing of 24 port patch panels Makes : D Link / AMP / Molex / Legrand / Krone including all accessories and labour charges etc., complete.

1

-

8148.5

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply, Transportation and Fixing of 20 pair Telephone distribution box with back mount frame, krone connector, powder coated metal body with lock and key arrangement including all accessories and labour charges etc., complete.

2

-

3675.7

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply and installation of 9U wall mounting network rack Makes : HCL / VAL / Rittal / APW. with power spike including all accessories.

1

-

8640.45

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply, Transportation and Fixing of 24 Port manageble switches Makes : CISCO / Net Gear / HP / D link including all accessories and labour charges etc., complete.

1

-

8409.35

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply of the following PVC XLPE armoured cable 1100 V. Grade with ISI mark stranded / solid, aluminimum conductor complete Make: Universal / Unicab / TORRENT/ Polycab /Havells / KEI 50.00 Sq.mm.

50

-

30619

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Supply of the following PVC XLPE armoured cable 1100 V. Grade with ISI mark stranded / solid, aluminimum conductor complete Make: Universal / Unicab / TORRENT/ Polycab /Havells / KEI 4core 16.00 Sq.mm.

50

-

15224.5

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Earth work excavation of Trench in hard ground soil, laying of U.G cables upto 50 Sq,mm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

80

-

20848

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Labour charges for run of U.G cable on wall / existing pipe with necessary fixing arrangments such as saddles, clamps,wooden separators etc., (as directed by departmental official) with No.10 SWG G.I wire for eath connections for the cables.

20

-

1276

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Termination of UG cables of 3.5 core 50 Sq.mm including with required cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

2

-

784

... More
Construction of Plantation Managers quarters buildings and Renovation of Plantation Manager office b;Termination of UG cables of 4 core 16 Sq.mm including with required cable glands, Lugs complete with all required accessories as directed by the department including cost and conveyance of all materials and labour charges etc., complete.

4

-

1152



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.