Telangana State Forest Development Corporation Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
351073Bid Award Id
ViewTender No
Ref. No.6.2.11/HDM/Civil/2022-23Tender Authority
Telangana State Forest Development Corporation Limited ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of compound wall to TSFDC Complex Palvancha Division during the Year 2022 23;Vibrated Reinforced Cement Concrete corresponding to M20 grade design mix using 350 kg. of cement, graded Metal of 20mm size HBG (SS5) metal from approved quarry including Cost and Conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental and labour charges such as mixing, laying, curing concrete for 21 days etc., complete for finished item of work. (APSS No. 402) for Plinth Beams
8.08
-
108143.77
... More
Construction of compound wall to TSFDC Complex Palvancha Division during the Year 2022 23;Vibrated Reinforced Cement Concrete corresponding to M20 grade design mix using 350 kg. of cement, graded Metal of 20mm size HBG (SS5) metal from approved quarry including Cost and Conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, incidental and labour charges such as mixing, laying, curing concrete for 21 days etc., complete for finished item of work. (APSS No. 402) for Columns
9.8
-
126226.25
... More
Construction of compound wall to TSFDC Complex Palvancha Division during the Year 2022 23;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and Cost and Conveyance of water to site and all operational, incidental, labour charges, sales and other taxes etc, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
37.9
-
7468.19
... More
Construction of compound wall to TSFDC Complex Palvancha Division during the Year 2022 23;Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, curing, etc., complete but excluding seigniorage charges for finished item of work. (APSS No. 501 & 504).
49.75
-
336515.47
... More
Construction of compound wall to TSFDC Complex Palvancha Division during the Year 2022 23;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete but excluding seigniorage charges for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
666.15
-
317773.53
... More
Construction of compound wall to TSFDC Complex Palvancha Division during the Year 2022 23;Painting to New walls with two coats of Acrylic Emulsion paint of superior quality of approved brand and shade over base coat of cement primer exterior grade -II making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 912) in All Floors
666.15
-
164658.96
... More
Construction of compound wall to TSFDC Complex Palvancha Division during the Year 2022 23;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over an existing steel primer including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
5.5
-
633.49
... More
Construction of compound wall to TSFDC Complex Palvancha Division during the Year 2022 23;Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including Cost and Conveyance of bars from approved sources to site of work including Cost and Conveyance of binding wire, cover blocks chains, overlaps, spacers, dowels, wastage etc, and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work (APSS No.126) in all floors
2.6
-
233087.53
... More
Construction of compound wall to TSFDC Complex Palvancha Division during the Year 2022 23;Supply and fixing of MS Gate including cost and conveyance of all materials and fabrication charges etc complete
200
-
22950
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements