State Warehousing Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

State Warehousing Corporation Tender

Civil And Construction
Opening Date13 Jan 2022
Closing Date27 Jan 2022
Tender Amount₹ 18,75,25,052 
This is an estimated amount, exact amount may vary.
Notes
Download

Summary

Construction Of 24,000 M.t. (3 X 7,000 M.t. + 1 X 3,000 M.t.) Capacity Godowns

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Get the Best Price For TMT
Starting from
₹44,500/MT*
Telangana

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m and back filling including shoring, sheeting, planking, strutting and all operational, incidental, labour charges excluding GST etc., complete excluding dewatering in HR - upto 3 m depth for Pits and Trenches

1025.19

648340

632.41

... More
Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

446.99

2109681

4719.75

... More
Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Foundation

343.45

1767517

5146.36

... More
Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Basement

934.5

4973399

5321.99

... More
Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

3003.37

86376

28.76

... More
Filling the plinth with useful gravel in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

23968.82

12178078

508.08

... More
Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete.

-

-

-

... More
For Footings

654.14

6494805

9928.77

... More
For Columns below Plinth and upto 2.89m above plinth level

331.5

4209254

12697.6

... More
For Columns above 2.89m

224.88

3064522

13627.37

... More
For Plinth beam

133.62

1656874

12399.9

... More
For Lintels

19.89

255470

12844.16

... More
For Tie beams at 2.44m level

159.85

2076929

12992.99

... More
For Roof beams at between 3.66 and 7.32m Level

269.83

3612945

13389.51

... More
For Tie beams above 7.32m Level

28.76

396485

13786.02

... More
For Gutter slab 125mm thick between 3.66 and 7.32m level

971.04

1694717

1745.26

... More
Providing RCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bond beams, Lintels and Coping

107.17

1328897

12399.9

... More
Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

275

23353874

84923.18

... More
Providing impervious coat to exposed RCC roof slab surface with CM (1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green, mixing mortar, laying, rendering smoot, rounding off junctions of wall and slab and curing including cost of all materials, labour charges, overhead charges, contractor profit but excluding GST etc., complete for finished item of the work for Gutter at 5.05m level

1328.04

704817

530.72

... More
Providing PCC (1:2:4) or M15 Grade concrete using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bed blocks

14.59

86437

5924.41

... More
Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement -15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges, curing charges, over head charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others.

-

-

-

... More
Upto 3.66m height above plinth

975.71

6421010

6580.86

... More
Above 3.66m height above plinth

1048.25

7650171

7298.02

... More
Providing Plastering Single coat 12mm thick, CM (1:4) prop., with sponge finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete to Exterior RCC members / Projections.

-

-

-

... More
Upto 3.66m height above plinth

2289.19

420386

183.64

... More
Above 3.66m height above plinth

2496.72

514374

206.02

... More
Providing Plastering Single coat 20mm thick, CM (1:6) prop., with sponge finishing including cost and conveyance of all meterials and labour charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete.

-

-

-

... More
Upto 3.66m height above plinth level

6382.85

1638413

256.69

... More
Above 3.66m height above plinth level

3180.26

998983

314.12

... More
Providing Plastering Single coat 12mm thick, CM (1:6) prop., with sponge finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete.

-

-

-

... More
Upto 3.66m height above plinth level

6131.67

1054524

171.98

... More
Above 3.66m height above plinth level

6225.96

1210077

194.36

... More
Flooring: Filling with sand for filling in trenches, foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site and all operational, incidental, labour charges, overhead charges & Contractors profit etc., complete for finished item of work but excluding GST and seigniorage charges

2890.65

2617628

905.55

... More
Providing PCC (1:5:10) prop., using 43 grade Cement, Coarse aggregate of 40mm nominal single size and 50% River sand, 50% Stone crushed sand as Fine aggregate, machine mixing including cost & conveyance of material and labour charges but excluding GST etc., complete for Sub base below Flooring

2319.1

10945572

4719.75

... More
Supply and laying of Polythene sheet 180micron thick sandwiched in between the PCC sub base layers necessary overlap of 150 mm at joints; and ends properly anchored in suitable grooves left in walls for water tightnessincluding cost and conveyance of sheet and labour charges, overhead charges and contractor profit but excluding GST etc., complete

16829.62

409128

24.31

... More
Providing Granolithic Flooring with Cement concrete (1:1:2) prop. 50mm thick using using 20mm nominal graded size crushed metal as Coarse aggregate, River Sand as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete

15573.74

5527276

354.91

... More
Vaccum drying of freshly laid cement concrete flooring using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vacuum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical travelling, finishing with sound edges and corners as directed by Engineer-in-charge of the work, including hire and operational charges of machinery, labour charges, fuel charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

15581.15

778901

49.99

... More
Cutting joints 3mm wide in the Concrete flooring by sawing in 2mx2m panels and filling the joints with silcone sealant, including hire and operational charges of machinery, labour charges, cost od sealant, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

11824.89

608981

51.5

... More
Provoiding and fixing MS Glazed Window type Air Inlet of 0.75x0.75m size fitted MS grill , The outer side frame of 35x35x3mm M.S. angle welded with 12mm dia plain mild steel rods at 75mm C/C both the ways (9 Nos. on each side) including all accessories such as hold fasts, tower bolts, wind appliances rubber packing to glasses 4 pieces etc., which will be kept by the side of first frame i.e. inside the godown including cost of all materials required for the work labour charges etc, complete as per drawing.

192

982475

5117.06

... More
Manufacturing, supply and fixing in position of 1.50x0.45m size ventilators having three frames. The first frame of 35x35x3mm M.S. angle welded with two numbers of 12mm dia plain mild steel rods horizontally and second frame made of 30x3mm flats made of 1.50x0.45m size with numbers and 14/16 guage of 20mm size iron diamond mesh fixed in second frame, drilling holes with suiatable dia to 1st frame and second frame to be tightetened with 20x6mm size zink bolts (8Nos) third frame made of two frames of 0.9x0.3m size with 25x25x3mm MS L angle and joining two frames and fixing of glasses to two frames.

260

1199858

4614.84

... More
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete as per approved drawing including cost and conveyance of all materials, labour charges, all fittings and furniture, overhead charges & Contractors profit but excluding GST etc., complete

301.99

1427663

4727.52

... More
Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm centre, Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts, bolts, nuts, rivets, locking arrangements, stoppers, handles, all accessories all fixtures and painted with one coat of approved steel primer etc., completeincluding cost and conveyance of all materials, labour charges, all fittings and furniture, overhead charges & Contractors profit but excluding GST etc., complete

404.84

1674252

4135.59

... More
Steel work in built up tubular Trusses, Purlins including cutting hoisting fixing in position and applyng a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. This includes the cost of trusses, rafter purlins, sleeves false rafter base plates lacing and bracing MS bolts and nuts and base plate on top of column as per relevant approved drawings and direction of Engineer-in-charge (There is no trusses over Gable walls and partition walls). The work including cost of material shall be executed as per approved drawings. The trusses shall be fabricated by the contractor at his own cost exactly as per approved drawings

30261.28

4125822

136.34

... More
Roofing with pre painted trapezoidal profile Galvalume sheet of IS:15965/YS550/AZ150/Class3, 0.5mm thick, 1020mm width, provided with anti capillary grove including sheet fixing with Hilt/Corroshield self drilling screws with neoprene washer and side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape, and fixing of sky light of 2mm thick polycorbonate sheet of size 1.30x1.00m including cost and conveyance of all material, labour charges etc., complete

4005.54

2350090

586.71

... More
Providing and fixing of Premoulded joint filler board 25mm thick in expansion joint for RCC columns including cost and conveyance of material, labour charges, over head charges and contractor profit but excluding GST etc., complete

95.7

44487

464.86

... More
Providing and fixing aluminium covering over expansion joint of approved pattern & design, made out of machine cut aluminium sheet 2.5mm thick and fixing using stainless steel dash fastners of 8 mm dia and 75 mm long bolt including providing aluminim-washers 2 mm thick 15 mm dia, on vertical surfaces, as per drawing and direction of Engineer inclufding cost and conveyance of all materials, labour charges, overhead charges and contractor profit but excluding GST etc., complete

110

45034

409.4

... More
Providing Rain water piping system for Roof drainage of length 6.0m length using PVC pipes 160mm dia with fittings Bell mounth at top, bends as required and shoe bend at bottom and fixing to wall with clamps by down taking from Gutter slab and connecting to chamber including cost and conveyance of pipe, fittings and all labour charges for fixing, overhead charges and contractor profit but excluding GST etc,. Complete.

66

267474

4052.65

... More
Laying of PVC pipe line of 160mm dia for Rain water draiange in the Platform, connecting from collection chamber and letting out side including cost and conveyance of pipe, charges for fixing, overhead charges and contractor profit but excluding GST etc,. Complete

161.04

79041

490.82

... More
Constructing of Collection chamber 457.2 mm x 457.2 mm size up to 914.4 mm in Brick masonry CM (1:6) prop., and fitted with light weight 457.2 mm x 457.2 mm C.I frame and cover including cost & conveyance of all materials, labour chrges, over head charges and contractor profit but excluding GST etc., complete

66

320414

4854.77

... More
White washing two coats to all the Interior wall surfaces cost and conveyance of all materials to site of work such as lime, gum, conge water and labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work for interior walls

12357.63

459085

37.15

... More
Painting to new walls with 1 coat of Cement primer exterior Gr.2 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental charges, labour charges, overhead charges and contractor profit etc. complete for finished item of work for exterior walls

14349.02

923502

64.36

... More
Painting to new walls with 2 coats of Acrylic exterior emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for external walls

14349.02

2103996

146.63

... More
Painting to new Iron work with Synthetic enamel paint of approved colour without priming coat including cost and conveyance of paint, brushes, labour charges, overhead charges and contractor profit but excluding GST etc complete for finished item of work

2828.71

317437

112.22

... More
Supply of Portable Fire extinguishers water type (gas catridge) of 9 Lit. capacity confirming to IS: 940-2003 including cost and conveyance charges, over charges and contractor profit but excluding GST etc complete

8

16360

2045

... More
Supply of Aluminum ladder of size 16 feet length while closing and 30 feet length while extended and made of Aluminum 'C' section of 3mm thich of all verticals and steps 1" dia 2mm aluminum tubes etc., complete with safety locks, rope, pulley, safety limit, rubber shoes, folding platforms, safety rings, hand rails fitted to extended section 2Nos 8" dia teflon wheels fixed for slding etc., complete.

4

122704

30676

... More
Painting and Lettering in enamel paint for Godown numbering, Compartment numbering, Stack marking and numbering as directed by the Engineer in charge including cost of synthetic enamel paint and and painter charges, over head charges and contractor profit but excluding GST etc., complete

4

60216

15054

... More
Providing and fixing of typical Name Board of TSWC centre of size 2.40 x 1.20m with necessary Logo as per specifications and drawing, with Posts with MS ISA 50 x 50 x5mm , board with MS ISA 35 35x 3mm frame and with MS sheet of 1.6mm thick and posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground level including cost of steel fabrication, painting and lettering, overhead charges and contractors profit but excluding GST etc., complete

3

39543

13181.16

... More
Clearing and grubbing Godown site by mechanical means including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness including machinary hire charges, overhead and contractor profit but excluding GST.

37634.49

85806

2.28

... More
ELECTRIFICATION TO 24,000 M.T. GODOWNS AT TSWC PATHA RAJAMPET:-

-

-

-

... More
Supply and fixing of 25mm dia 1.80mm thick PVC pipe (ISI mark) concealed in wall with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

2112.6

287905

136.28

... More
Supply and Fixing of 25mm dia 1.5mm thick PVC pipe (ISI mark) in sheeting with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

620

39165

63.17

... More
Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete.

-

-

-

... More
8 Module Box

68

14292

210.19

... More
6 Module Box

36

5848

162.47

... More
Supply and run of 2x2.50 sq.mm (36/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete

5200

465816

89.58

... More
Supply and run of 1x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Earth continuity including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complette

5200

109564

21.07

... More
Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

-

-

-

... More
8 Module Box

68

14862

218.56

... More
6 Module Box

36

6096

169.34

... More
Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, ceiling rose including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete for Tube Light, Fan points in Residential buildings

280

160809

574.32

... More
Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, Batten/Angular holder including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., for Light points in Residential buildings

16

9171

573.19

... More
Supply & fixing of 6A/16A 3/2 pin modular socket with 16A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

106

41193

388.62

... More
Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

14

78234

5588.15

... More
Supply and fixing of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with single side connection with BIS Certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

220

153324

696.93

... More
Supply and fixing of 20W LED Street light luminair, body made of high grade pressure die – cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 l with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., with BIS certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

16

48845

3052.84

... More
Supply and laying of of UG cable of 6 sq.mm 2 core XLPE insulated, 1100V grade armoured aluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/Finolex/ Havels/V-Guard or equivalant including cost of all cable, labour charges, overhead charges and contractor profit but excluding GST etc., complete.

400

177972

444.93

... More
Supply & Fixing of 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete

180

52149

289.72

... More
Providing independent earthing by excavating a pit to a depth of 2.1m in all soils, as per size specified, using GI pipe 40mm dia medium class of 2.5m length duly providing staggered holes and with necessary accessories and with hume pipe ring including filling with equal proportion of Salt and Charcoal in layers including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

4

22100

5525.1

... More
Self supported arch shaped GALVALUME sheet roofing at TSWC Patha Rajampet:-

-

-

-

... More
Providing Self supported arch shaped GALVALUME sheet roofing including fasteners, designed to withstand the Wind load (as per IS875 Part-3) & Earthquake load (as per IS1893) for effective span of 21.350m and central rise of 4.36m by Proplex roofing including cost and conveyance of sheets to site, machinery hire charge, fabrication charges, installation charges and labour charges, incidental charges etc., complete with following specifications, terms and conditions. Color coated Galvalume steel complying to ASTM A792, Base metal thickness 1.00mm (Tolerance as +/- 0.02mm), alloy coating AZ 150 (Aluminum 55%, Zinc 43.4% and Silicon 1.6%), Yield strength: 350MPA as recommended in ASTM A792, Paint coating regular modified polyester, Top side Primer coat 25 Microns top coat 12 microns and Bottom side 25 Microns back coat 12 microns epoxy, top color: Combination of Blue and Off white and Bottom color grey using make of Thyssen Krupps, Germany/ Dongbu Steel Co. Limited, Korea/Corus Steels, U.K/ Union steel, Korea/Yieh phui Enterprises Ltd., Taiwan and Domestic market make of TATA Blue scope, Jindal Steel industries, Bhushan steels, JSW steel industry, Other Indian renowned steel industries etc. The Steel sheet shall be 3’-0” (914MM) width (Tolerance +/- 2.00 MM) which shall be curved and moulded at site using mechanical press and dies to the desired curves and shape to form 2’-0” (605MM) wide interlocking panels. These panels shall be erected in position and the joints are seamed. The installation should be done by mechanized methods. Vendor has to mobilize required number of Hydra for transportation of sheets and Cranes for the erection of Seamed Sheets and complete the entire work satisfactorily by using the fixtures like anchor fasteners, standard light hangers, etc., complete as per terms and conditions. The Specifications, design & drawings for the arch shaped roofing must be submitted to TSWC for approval before the installation of the sheets at site.

15202.5

26528362

1745

... More
Manufacturing, Supply and fixing of a combination of Turbo Ventilator (Aluminum) of Size 24 inches, Capacity 2200 CFM, with a Ventilight to provide daylight along with air ventilation of 2mm Thick Polycarbonate sheet of size 3'6"FtX 7' 8"Ft, to be installed at a distance of every 23 FT along the length of the building.

90

4050000

45000

... More
Construction of Office building at TSWC Patha Rajampet:-

-

-

-

... More
Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

75

26597

354.63

... More
Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

20

94395

4719.75

... More
Providing RRM in CM (1:6) prop., using Hard Granite stone including cost & conveyance all materials, labour charges, over head charges and contractor profit etc., complete but excluding GST and Seigniorage charges

68.03

288092

4234.78

... More
Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

112.56

3237

28.76

... More
Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete.

-

-

-

... More
Footings for columns

18.1

179710

9928.77

... More
Plinth Beam of 0.23M x 0.30 M size

6

74399

12399.9

... More
Columns of 0.23M x 0.30 M size

5

63488

12697.6

... More
Roof Beam

5

64964

12992.99

... More
Lintels

4.4

56514

12844.16

... More
Sun shades 0.60 Mt wide 0.05m thick

24.17

29176

1207.15

... More
Roof Slab 115mm thick and impervious coat 20mm thick in CM(1:3)

155

230235

1485.39

... More
Waist Slab 150mm thick for stair case

8.8

15546

1766.66

... More
Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

5

424615

84923.18

... More
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green, mixing mortar, laying, rendering smoot, rounding off junctions of wall and slab and curing including cost of all materials, labour charges, overhead charges, contractor profit but excluding GST etc., complete for finished item of the work for Gutter at 5.05m level

155

77038

497.02

... More
Providing PCC (1:2:4) or M15 Grade concrete using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bed blocks

0.9

5778

6420.91

... More
Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement -15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges,curing charges,over head charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others. Above basement

50

329043

6580.86

... More
Plastering 12mm thick single coat with cement mortar (1:4) Prop. to RCC works with sponge finishing including cost and conveyance of all materials, labour charges, curing including water leads machine mixing etc., complete for finished item of work.

220

40400

183.64

... More
Providing Plastering Two coats 12mm thick, base coat 8mm thick in CM (1:5) prop., and finished coat 4mm in CM (1:3) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to Internal walls

250

104792

419.17

... More
Providing Plastering Two coats 20mm thick, base coat 16mm thick in CM (1:6) prop., and finished coat 4mm in CM (1:4) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to Exterior walls

170

74584

438.73

... More
Supply & fixing of Wooden Door Fully Panelled of size 1500x2100mm, Frame made up of Medium Teak wood, of section size 100x75mm with MS hold fasts - 6 Nos and Panelled Shutter Two leaves 545x2000mm size, 32mm thick one 1 No made with Teak wood planks 30mm thick, with SS fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 150mm - 2 Nos, Aldrop 300mm - 1 No, as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete as per APSS 1 No.1002. Door - 1.20 x 2.10m

1

26629

26629.99

... More
Supply & fixing of Wooden Door with Flush shutter, of size 1050x2100mm, Frame made up of Medium Teak wood, of section size 100x65mm with MS hold fasts - 6 Nos and WPC flush shutter 950x2000mm size, 30mm thick one 1 No made with water resistant hard wood fibre HDF/MDF fibre board skins of 2.5mm thick, with MSS fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 150mm - 2 Nos, Aldrop 300mm - 1 No, as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete. Door - 1.05 x 2.10m

5

51112

10222.43

... More
Supply & fixing of Wooden Door with Flush shutter, of size 750x2050mm, Frame made up of Medium Teak wood, of section size 100x65mm with MS hold fasts - 6 Nos and WPC flush shutter of 2.5mm thick 700x1900mm size, 25mm thick covered with acrylic sheet - 1 No , with Mild steel fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 125mm - 2 Nos, Aldrop 200mm - 1 No as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete. Door - 0.75 x 2.10m

2

16621

8310.62

... More
Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) casement windows openable shutters duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60 mm x 2.40 mm for mullion sections for two or more openable shutters 75 mm x 60 mm x 2.40 mm foropenable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co- extruded with Grey colour soft PVC and accessories for casement window – friction hinges of stainless steel grade 304/430- 2 Nos., per sash, handle with mazak alloy casting 1 No. per sash, multipoint locking system suitably concealed 1 No., per sash provided with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

14.4

118384

8221.18

... More
Supply and fixing of MS Grills to Window, Ventilator as per APSS No.126 including cost of MS sections , rods and welding rods, power charges, including cost of material, fabrication charges, fixing charges, over head charges and contractor profit but excluding GST etc complete for finished item of work in all floors.

400

42264

105.66

... More
Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Base course below Flooring

15.56

73439

4719.75

... More
Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles, overhead charges & Contractors profit etc., complete but excluding GST and seigorage charges for finished item of work

96

110576

1151.84

... More
Providing skirting to internal walls to 15 cm height with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water and including cost and conveyance of all meterials and labour charges, overhead charges & Contractors profit etc., complete but excluding GST and seigorage charges for finished item of work

10.4

11874

1141.78

... More
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

7.14

5852

819.64

... More
Providing Dadoing to internal walls to 2100mm height with Glazed ceramic tiles 7.30 mm thick, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete

30

17166

572.21

... More
Flooring with Rough Tandur 18mm thick stones, set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly including cost and conveyance of all materials , labour charges, overhead charges and contractor profit but excluding GST and seigniorage charges, etc., complete for finished item of work

76.83

40226

523.58

... More
Providing and applying Cement based putty of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges including overhead charges & Contractors profit etc., complete but excluding GST and seigorage charges for finished item of work for Internal walls.

292.82

61401

209.69

... More
Painting to new walls with 1 coat of Cement primer Interior Gr.1 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

470

27955

59.48

... More
Painting to new walls with 1 coat of Cement primer exterior Gr.2 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

170

10941

64.36

... More
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

470

44137

93.91

... More
Painting to new walls with 2 coats of Acrylic exterior emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for external walls

170

24927

146.63

... More
Painting to new wood work with 2 coats of synthetic enamel paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of dead mortar, including cost and conveyance of all materials to work site and all operational, incidental, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

39.38

7278

184.83

... More
Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete

1000

9090

9.09

... More
Supply and fixing of CPVC pipes and fittings of 28.60mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

100

24654

246.54

... More
Supply and fixing of CPVC pipes and fittings of 15.90mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

30

4874

162.47

... More
Supply and fixing of CP Long body Bib cock fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/ Senior/ Nice or equivalent including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

5

4413

882.79

... More
Supply and fixing of Orissa Pan white glazed WC 1st quality ISI marked with "P" or "S" trap, 630mm x 450mm size white glazed of Parry company make including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

1

2292

2292.75

... More
Supply & Fixing of European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 floor mounted close coulpled dual flush porcelainn cistern fixed on wash down white glazed with 'S' trap of Hindustan / Neycer or Parryware make including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

1

18195

18195.44

... More
Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with 19.05mm 400gms NP stop cock Indian make with ISI mark Seiko/Senior/Nice or equivalent parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Single C.P. Pillar cock including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

3

9138

3046.02

... More
Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader of overall size 95 x 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974 fixed with screws complete Indian make (HSW/Parry/Neycer) : 590 x 375 x 390 mm including cost and conveyance of all materials and labour charges etc., complete including Overheads & Contractors Profit but excluding GST

2

7309

3654.99

... More
Supply of PVC/SWR Pipes and fittings including cost and conveyance of materials etc., complete including over heads & contractors profit but excluding GST.

-

-

-

... More
SWR pipe 110 mm dia - Type- A Single socket 3m length

6

3592

598.75

... More
SWR pipe 110 mm dia - Type- A Double socket 0.91m length

4

1045

261.31

... More
SWR pipe 75 mm dia - Type- A Single socket 3m length

5

1539

307.9

... More
SWR pipe 75 mm dia - Type- A Double socket 0.91m length

5

823

164.74

... More
SWR Plain Bend 110 mm dia - 87.5 Degree

3

313

104.53

... More
SWR Door Bend 110 mm dia - 87.5 Degree

3

402

134.07

... More
SWR Single Tee with door 110 mm dia

3

483

161.33

... More
SWR Single 'Y' with Door 110 mm dia

3

637

212.46

... More
SWR Vent Cowl 110 mm dia

2

47

23.86

... More
SWR Single 'Y' with Door 75 mm dia

2

236

118.16

... More
SWR Single Tee with door 75 mm dia

2

181

90.89

... More
SWR Nahany trap with jali 75 mm dia

3

327

109.07

... More
Laying, fixing and commissioning of PVC/SWR pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice

15

1499

99.98

... More
Constructing Inspection chamber 457.2 mm x 457.2 mm size up to 914.4 mm in Brick masonry CM 1:6 prop., and fitted with light weight 457.2 mm x 457.2 mm C.I frame and cover including cost & conveyance of all materials, labour chrges, over head charges and contractor profit but excluding GST etc., complete

3

14564

4854.77

... More
Construction of Septic tank of internal size 2.00 x 0.9x1.70m with walls 230mm thick built out in Fly ash bricks in CM (1:6), over Flooring 300mm thick in PCC 1:3:6 prop., plastered in CM 1:4 prop., inside walls and flooring and covered with RCC slab with acces opening of 455 x 610mm fitted with RCC cover and with inlet and out let arrangements including earthwork excavation cost and conveyance of all materials required to the work, labour charges, overhead charges and contractor profit but excluding GST etc.,complete. as per approved design and drawing

1

36403

36403.77

... More
Construction of Seepage pit 1.2m dia x 1.5m depth with lining with RCC rings with open joints, provided with RCC cover at top and inlet arrangement including earthwork excavation cost and conveyance of all materials required to the work, labour charges , overhead charges and contractor profit but excluding GST etc.,complete. as per approved design and drawing

1

5200

5200.73

... More
ELECTRIFICATION TO OFFICE BUILDING AT TSWC PATHA RAJAMPET:-

-

-

-

... More
Supply and Fixing of 25mm dia 2.2mm thick P.V.C. pipe (ISI mark) concealed in roof slabs with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

61.46

5041

82.03

... More
Supply and fixing of 25mm dia 1.80mm thick PVC pipe (ISI mark) concealed in wall with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

141.79

19323

136.28

... More
Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete.

-

-

-

... More
12 Module box

10

2545

254.5

... More
8 Module box

6

1261

210.19

... More
6 Module box

3

487

162.47

... More
Supply and run of 2x2.50 sq.mm (36/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. For Circuits from DB to power points

250

22395

89.58

... More
Supply and run of 2x4.0 sq.mm (56/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete

90

12254

136.16

... More
Supply and run of 1x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Earth continuity including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complette

150

3160

21.07

... More
Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

-

-

-

... More
12 Module box

10

2701

270.18

... More
8 Module box

6

1311

218.56

... More
6 Module box

3

508

169.34

... More
Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, ceiling rose including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete for Tube Light, Fan points in Residential buildings

18

10337

574.32

... More
Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, Batten/Angular holder including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., for Light points in Residential buildings

4

2292

573.19

... More
Supply & fixing of 6A/16A 3/2 pin modular socket with 16A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

18

6995

388.62

... More
Supply & fixing of 20A pin modular socket with 20A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

3

1670

556.77

... More
Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

5588

5588.15

... More
Supply and fixing of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with single side connection with BIS Certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

12

8363

696.93

... More
Supply and fixing of 20W LED Street light luminair, body made of high grade pressure die – cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 l with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., with BIS certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

4

12211

3052.84

... More
Supply and fixing of 48" (1200mm) Sweep Ceiling Fan without Regulator with 5 Star rating of makes Crompton / Bajaj / Orient /Usha including transportation and labour charges for Fixing of Ceiling fan and regulator and giving connections with twin core wire etc., complete.

6

20306

3384.34

... More
Supply and laying of 6 sqmm 2 core XLPE insulated, 1100V grade armoured aluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/Finolex/ Havels/V-Guard or equivalant including cost of all cable, labour charges, overhead charges and contractor profit but excluding GST etc., complete.

50

22246

444.93

... More
Supply & Fixing of 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete

10

2897

289.72

... More
Providing independent earthing by excavating a pit to a depth of 2.1m in all soils, as per size specified, using GI pipe 40mm dia medium class of 2.5m length duly providing staggered holes and with necessary accessories and with hume pipe ring including filling with equal proportion of Salt and Charcoal in layers including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

5525

5525.1

... More
Construction of Hamalies Parking shed at TSWC Patha Rajampet:-

-

-

-

... More
Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

50

17731

354.63

... More
Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

35

165191

4719.75

... More
Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

140

4026

28.76

... More
Providing RCC (1:11/2:2) prop., nominal mix using 43 grade Cement, Crushed metal of 20mm nominal graded size as Coarse aggregate and 50% River sand, 50% stone crushed sand as Fine aggregate including cost & conveyance of all materials, hire charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machine mixing charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members.

-

-

-

... More
Footings for columns

4.75

47161

9928.77

... More
Columns

3

38092

12697.6

... More
Lintels and lofts over openings

0.5

6422

12844.16

... More
Roof Slab 115mm thick and impervious coat 20mm thick Slab

11

16339

1485.39

... More
Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

1

84923

84923.18

... More
Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green, mixing mortar, laying, rendering smoot, rounding off junctions of wall and slab and curing including cost of all materials, labour charges, overhead charges, contractor profit but excluding GST etc., complete for finished item of the work for Gutter at 5.05m level

11

5467

497.02

... More
Plain Cement Concrete (1:2:4) Prop. Using 20mm size ISI gauge hard broken granite machine crushed metal including cost and conveyance of all materials to site of work and labour charges, centering, machine mixing, laying, curing and all other incidental and operational charges

15

96313

6420.91

... More
Providing Masonry work in cement mortar (1:6) Prop. with fly ash cement solid blocks of size 290x225x140mm for manufacturing of fly ash solid blocks using fly ash 80kgs, cement of 15 kgs gypsum of 5 kgs and stone dust including cost and conveyance of all materials, Labour Charges, water leads, curing, scaffolding charges, lift charges, machine mixing charge etc., complete with compressive strength not less than 50kgs for 225mm thick walls for superstructure.

52

316115

6079.14

... More
Providing Plastering Single coat 12mm thick, CM (1:6) prop., with sponge finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete

350

56234

160.67

... More
Providing Plastering Single coat 12mm thick, CM (1:4) prop., with sponge finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete

200

34466

172.33

... More
Supply & fixing of Wooden Door with Flush shutter, of size 750x2050mm, Frame made up of Medium Teak wood, of section size 100x65mm with MS hold fasts - 6 Nos and WPC flush shutter of 2.5mm thick 700x1900mm size, 25mm thick covered with acrylic sheet - 1 No , with Mild steel fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 125mm - 2 Nos, Aldrop 200mm - 1 No as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete

2

16621

8310.62

... More
Colour washing two coats with cement based paint of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

350

19502

55.72

... More
Painting two coats with synthetic enamel paint second grade of Asian / Nerolac / Berger etc., over a coat of wood primer including cost of primer and conveyance of all materials, labour charges etc., complete

19

3511

184.83

... More
Steel work in built up tubular Posts, Rafters and Purlins including cutting hoisting fixing in position and applyng a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. This includes the cost of trusses, rafter purlins, sleeves false rafter base plates lacing and bracing MS bolts and nuts and base plate on top of column as per relevant approved drawings and direction of Engineer-in-charge (There is no trusses over Gable walls and partition walls). The work including cost of material shall be executed as per approved drawings. The trusses shall be fabricated by the contractor at his own cost exactly as per approved drawings

1617

220461

136.34

... More
Roofing with pre painted trapezoidal profile Galvalume sheet of IS:15965/YS550/AZ150/Class3, 0.5mm thick, 1020mm width, provided with anti capillary grove including sheet fixing with Hilt/Corroshield self drilling screws with neoprene washer and side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape, and fixing of sky light of 2mm thick polycorbonate sheet of size 1.30x1.00m including cost and conveyance of all material, labour charges etc., complete

144

84486

586.71

... More
Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including cost & conveyance of all materials , labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

4

3278

819.64

... More
Providing Dadoing to internal walls to 2100mm height with Glazed ceramic tiles 7.30 mm thick, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including including cost & conveyance of all materials , labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

18

10299

572.21

... More
Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete

1000

9090

9.09

... More
Supply and fixing of CPVC pipes and fittings of 28.60mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

50

12327

246.54

... More
Supply and fixing of CPVC pipes and fittings of 15.90mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

20

3249

162.47

... More
Supply and fixing of CP Long body Bib cock fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/ Senior/ Nice or equivalent including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

8

7062

882.79

... More
Supply and fixing of Orissa Pan white glazed WC 1st quality ISI marked with "P" or "S" trap, 630mm x 450mm size of Parry company make including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

2

4585

2292.75

... More
Supply of PVC/SWR Pipes and fittings including cost and conveyance of materials etc., complete including over heads & contractors profit but excluding GST.

-

-

-

... More
SWR pipe 110 mm dia - Type- A Single socket 3m length

4

2395

598.75

... More
SWR pipe 110 mm dia - Type- A Double socket 0.91m length

3

783

261.31

... More
SWR pipe 75 mm dia - Type- A Single socket 3m length

3

923

307.9

... More
SWR pipe 75 mm dia - Type- A Double socket 0.91m length

3

494

164.74

... More
SWR Plain Bend 110 mm dia - 87.5 Degree

2

209

104.53

... More
SWR Door Bend 110 mm dia - 87.5 Degree

2

268

134.07

... More
SWR Single Tee with door 110 mm dia

1

161

161.33

... More
SWR Single 'Y' with Door 110 mm dia

1

212

212.46

... More
SWR Vent Cowl 110 mm dia

1

23

23.86

... More
SWR Single 'Y' with Door 75 mm dia

2

236

118.16

... More
SWR Single Tee with door 75 mm dia

1

90

90.89

... More
SWR Nahany trap with jali 75 mm dia

2

218

109.07

... More
Laying, fixing and commissioning of PVC/SWR pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice

10

999

99.98

... More
Constructing Inspection chamber 457.2 mm x 457.2 mm size up to 914.4 mm in Brick masonry CM 1:6 prop., and fitted with light weight 457.2 mm x 457.2 mm C.I frame and cover including cost & conveyance of all materials, labour chrges, over head charges and contractor profit but excluding GST etc., complete

2

9709

4854.77

... More
Construction of Septic tank of internal size 2.00 x 0.9x1.70m with walls 230mm thick built out in Fly ash bricks in CM (1:6), over Flooring 300mm thick in PCC 1:3:6 prop., plastered in CM 1:4 prop., inside walls and flooring and covered with RCC slab with acces opening of 455 x 610mm fitted with RCC cover and with inlet and out let arrangements including earthwork excavation cost and conveyance of all materials required to the work, labour charges , overhead charges and contractor profit but excluding GST etc.,complete. as per approved design and drawing

1

36403

36403.77

... More
Construction of Seepage pit 1.2m dia x 1.5m depth with lining with RCC rings with open joints, provided with RCC cover at top and inlet arrangement including earthwork excavation cost and conveyance of all materials required to the work, labour charges , overhead charges and contractor profit but excluding GST etc.,complete. as per approved design and drawing

1

5200

5200.73

... More
INTERNAL ROADS AT TSWC PATHA RAJAMPET:

-

-

-

... More
Construction of Granular sub-base course with naturallay occuring gravel, spreading in uniform layers with motor grader on prepared surface, and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MoRD. including cost & conveyance of mateial, machinery charges, labour charges, overhead charges & contractor profit and seigniorage charges but excluding GST

3650

2423162

663.88

... More
Providing, laying, spreading and compacting stone aggregates of 63 mm nominal single size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 kN in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 MORD including cost & conveyance of mateial, machinery charges, labour charges, overhead charges & contractor profit and seigniorage charges but excluding GST

900

2399040

2665.6

... More
Providing, laying, spreading and compacting stone aggregates of 40 mm Single nominal size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 kN in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 MORD.

900

2600091

2888.99

... More
Construction of Hard Shoulders with naturally occuring gravel, spreading in uniform layers with motor grader on prepared surface, and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MoRD. including cost & conveyance of mateial, machinery charges, labour charges, overhead charges & contractor profit and seigniorage charges but excluding GST

91

60413

663.88

... More
Construction of RCC Slab Culvert:

-

-

-

... More
Earthwork in excavation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth For Walls

38

13475

354.63

... More
Providing & laying of PCC 1:3:6 prop. Nominal mix) using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, For Walls

7

36024

5146.36

... More
Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

38

1092

28.76

... More
Providing PCC 1:2:4 prop., using 43 grade Cement, Coarse aggregate of 20mm nominal graded size and Fine aggregate, manual mixing including cost & conveyance of material and labour charges but excluding GST etc., complete

48

284371

5924.41

... More
Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete For Slab 150mm thick for culvert

45

79499

1766.66

... More
Providing Plaster Single coat 12mm thick, CM 1:4 prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete to Exterior RCC members / Projections

90

16527

183.64

... More
Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars , overhead charges, contractor profit but excluding GST etc., complete

2

169846

84923.18

... More
Weighbridge foundation at TSWC Patha Rajampet:

-

-

-

... More
Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

40

14185

354.63

... More
Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

21

99114

4719.75

... More
Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete.

-

-

-

... More
Footings for columns

8.1

80423

9928.77

... More
Columns

6.9

87613

12697.6

... More
Beams

7.67

99656

12992.99

... More
Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

1

84923

84923.18

... More
Providing PCC (1:2:4) or M15 Grade concrete using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bed blocks

20

128418

6420.91

... More
Providing Plastering Single coat 12mm thick, CM (1:4) prop., with sponge finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete

60

10339

172.33

... More
Supply and fixing of ISA 65x65x6mm size for Kerb protection, as directed by the Officer in charge including cost of steel , fabriaction charges, labour charges for fixing over head charges and contractor profit but excluding GST etc., complete

18.6

14771

794.17

... More
Supply and fixing of MS flat of size 50x10mm of 1.20m length including cost and conveyance steel, welding charges etc., complete and as directed by the officer incharge of work.

12

6061

505.13

... More
Supply and fixing of Copper plate of size 20x2mm as directed by the officer incharge of workincluding cost and conveyance of material , labour charges, overhead charges and contractor profit but excluding GST etc., complete .

20

15848

792.42

... More
Construction of Cabin Room at TSWC Patha Rajampet:-

-

-

-

... More
Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

15

5319

354.63

... More
Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

4

18879

4719.75

... More
Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

15

431

28.76

... More
Providing RRM in CM (1:6) prop., using Hard Granite stone including cost & conveyance all materials, labour charges, over head charges and contractor profit etc., complete but excluding GST and Seigniorage charges

10

42347

4234.78

... More
Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete.

-

-

-

... More
Footings for columns

2.02

20056

9928.77

... More
Columns of 0.23M x 0.30 M size

2.31

29331

12697.6

... More
Plinth Beam of 0.23M x 0.30 M size

3

37199

12399.9

... More
Roof Beams

3

40168

13389.51

... More
Roof Slab 115mm thick

25

37134

1485.39

... More
Lintels

0.15

1926

12844.16

... More
Sun shades 0.60 Mt wide

2.16

2607

1207.15

... More
Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

1

84923

84923.18

... More
Providing PCC (1:2:4) or M15 Grade concrete using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bed blocks

0.1

642

6420.91

... More
Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement -15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges,curing charges,over head charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others. Above basement

11.39

74956

6580.86

... More
Plastering 12mm thick single coat with cement mortar (1:4) Prop. to RCC works with sponge finishing including cost and conveyance of all materials, labour charges, curing including water leads machine mixing etc., complete for finished item of work.

21.61

3724

172.33

... More
Providing Plastering Two coats 12mm thick, base coat 8mm thick in CM (1:5) prop., and finished coat 4mm in CM (1:3) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to Internal walls

46.41

19453

419.17

... More
Providing Plastering Two coats 20mm thick, base coat 16mm thick in CM (1:6) prop., and finished coat 4mm in CM (1:4) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to Exterior walls

79.65

34944

438.73

... More
Supply & fixing of Wooden Door with Flush shutter, of size 1050x2100mm, Frame made up of Medium Teak wood, of section size 100x65mm with MS hold fasts - 6 Nos and WPC flush shutter 950x2000mm size, 30mm thick one 1 No made with water resistant hard wood fibre HDF/MDF fibre board skins of 2.5mm thick, with MSS fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 150mm - 2 Nos, Aldrop 300mm - 1 No, as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete.

1

10222

10222.43

... More
Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

1.58

7457

4719.75

... More
Providing Granolithic Flooring with Cement concrete (1:1:2) prop. 50mm thick using using 20mm nominal graded size crushed metal as Coarse aggregate, River Sand as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete

15.84

5621

354.91

... More
Painting to new walls with 1 coat of Cement primer Interior Gr.1 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

68.02

4045

59.48

... More
Painting to new walls with 1 coat of Cement primer exterior Gr.2 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

79.65

5126

64.36

... More
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

68.02

6387

93.91

... More
Painting to new walls with 2 coats of Acrylic exterior emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for external walls

79.65

11679

146.63

... More
Painting to new wood work with 2 coats of synthetic enamel paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of dead mortar, including cost and conveyance of all materials to work site and all operational, incidental, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

16.34

3020

184.83

... More
Supply and fixing of 110mm dia PVC rain water pipe including cost of material, labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete

1

598

598.75

... More
ELECTRIFICATION TO WEIGHBRIDGE AND CABIN ROOM AT TSWC PATHA RAJAMPET:-

-

-

-

... More
Supply and Fixing of 25mm dia 2.2mm thick P.V.C. pipe (ISI mark) concealed in roof slabs with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

16.2

1328

82.03

... More
Supply and fixing of 25mm dia 1.80mm thick PVC pipe (ISI mark) concealed in wall with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

27

3679

136.28

... More
Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete.

-

-

-

... More
12 Module box

2

509

254.5

... More
8 Module box

2

420

210.19

... More
6 Module box

1

162

162.47

... More
Supply and run of 2x2.50 sq.mm (36/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. For Circuits from DB to power points

30

2687

89.58

... More
Supply and run of 2x4.0 sq.mm (56/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete

30

4084

136.16

... More
Supply and run of 1x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Earth continuity including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete

15

316

21.07

... More
Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

-

-

-

... More
12 Module box

2

540

270.18

... More
8 Module box

2

437

218.56

... More
6 Module box

1

169

169.34

... More
Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, ceiling rose including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete for Tube Light, Fan points in Residential buildings

4

2297

574.32

... More
Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, Batten/Angular holder including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., for Light points in Residential buildings

2

1146

573.19

... More
Supply & fixing of 6A/16A 3/2 pin modular socket with 16A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

4

1554

388.62

... More
Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

5588

5588.15

... More
Supply and fixing of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with single side connection with BIS Certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

3

2090

696.93

... More
Supply and fixing of 20W LED Street light luminair, body made of high grade pressure die – cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 l with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., with BIS certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

2

6105

3052.84

... More
Supply and fixing of 48" (1200mm) Sweep Ceiling Fan without Regulator with 5 Star rating of makes Crompton / Bajaj / Orient /Usha including transportation and labour charges for Fixing of Ceiling fan and regulator and giving connections with twin core wire etc., complete.

1

3384

3384.34

... More
Supply and laying of 6 sqmm 2 core XLPE insulated, 1100V grade armoured aluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/Finolex/ Havels/V-Guard or equivalant including cost of all cable, labour charges, overhead charges and contractor profit but excluding GST etc., complete.

100

44493

444.93

... More
Supply & Fixing of 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete

10

2897

289.72

... More
Providing independent earthing by excavating a pit to a depth of 2.1m in all soils, as per size specified, using GI pipe 40mm dia medium class of 2.5m length duly providing staggered holes and with necessary accessories and with hume pipe ring including filling with equal proportion of Salt and Charcoal in layers including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

5525

5525.1

... More
Construction of Compound Wall at TSWC Patha Rajampet:-

-

-

-

... More
Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

419.25

148678

354.63

... More
Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

78.18

368990

4719.75

... More
Providing RRM in CM (1:6) prop., using Hard Granite stone including cost & conveyance all materials, labour charges, over head charges and contractor profit etc., complete but excluding GST and Seigniorage charges

1004.75

4254895

4234.78

... More
Providing Masonry work in cement mortar (1:6) Prop. with fly ash cement solid blocks of size 290x225x140mm for manufacturing of fly ash solid blocks using fly ash 80kgs, cement of 15 kgs gypsum of 5 kgs and stone dust including cost and conveyance of all materials, Labour Charges, water leads, curing, scaffolding charges, lift charges, machine mixing charge etc., complete with compressive strength not less than 50kgs for 225mm thick walls for superstructure.

305.7

1858393

6079.14

... More
Providing PCC M20 grade using 43 grade Cement or any other type, Coarse aggregate of 20mm nominal graded size and Fine aggregate, manual mixing including cost & conveyance of material and labour charges etc., complete for Bed blocks/Coping

12.45

79318

6371

... More
Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38 Kg per 100 metres (min.), Straining and fixing to any type of standard, rails, straining bolts, including securing with and provision of galvanised mild steel wire, stapples or steel pins, etc., as directed by Officer in charge including cost and conveyance of all materials and labour charges , overhaed charges, contractor profit but excluding GST etc., complete

2600

53534

20.59

... More
Supply and fixing of fencing posts over compound wall using MS ISA 35x35x5 mm and length of 1.00 M including cutting, bending, welding hooks for fixing of barbed wire etc., complete for finished item of work.

1083

116888

107.93

... More
Plastering 12mm thick single coat with cement mortar (1:6) Prop. with sponge finishing including cost and conveyance of all materials, labour charges, curing including water leads, mixing of mortar etc., complete for finished item of work.

2805

450679

160.67

... More
Plastering 20mm thick to RR masonry in single coat with cement mortar (1:6) Prop. with sponge finishing including cost and conveyance of materials to site of work, curing including all water leads machine mixing etc., complete for finished item of work.

2550

625744

245.39

... More
Colour washing two coats with cement based paint of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

5355

298380

55.72

... More
Supply, delivery and fixing of MS gate using MS squire pipes as per approved design and specification and design including cost of materials, fabrication, transportation and labour charges for fixing etc., complete

500

57375

114.75

... More
Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete.

-

-

-

... More
Footings

0.66

6552

9928.77

... More
Columns

1.22

15491

12697.6

... More
Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars etc., complete as per APSS No.126

0.5

42461

84923.18

... More
Borewell with pumpset for water supply:

-

-

-

... More
Drilling of 165mm dia Bore well in all types of stratae using DTH ring, drilling over burdan of 180mm dia and insertion of PVC casing pipe with coupling and flushing, up to depth as directed by the officer in charge of work including tranportation of rig support vehicle, conductiong yield test, crew charges, incidental charges, over head charges and contractor profit buu excluding GST but excluding cost of casing pipe etc., complete

152

46627

306.76

... More
Supply and delivery of UPVC pipe 180mm DN, class '3' ( 6kg/cm2 WP) including cost & conveyance and all taxes

49

35462

723.73

... More
Supply and transportation of 2.00 HP 25 stage Single phase ISI Submersible motor pump set suitable for 4" bore well of make CRI/ KSB/ Texmo etc., complete including cost and conveyance of all materials

1

29227

29227.46

... More
Supply, delivery of the following accessries suitable to single phase motor pump set:

-

-

-

... More
DOL starter suitable to single phase motor pump set up to 3.00HP

1

1022

1022.54

... More
Cable PVC insulated 7/20

98

1892

19.31

... More
Submersible cable PVC sheathed, PVC insulated, flexible, flat , 3-core 2.5sq.mm

64

7635

119.3

... More
HDPE pipe confirming to IS:4984-1995, PE100 PN10 DN32

150

6135

40.9

... More
Stainless steel serrated - screwed connector NB25 x 300mm length

2

454

227.23

... More
Bends GI 25mm dia, Heavy class

1

56

56.81

... More
Nipple GI 25mm dia, Medium class

1

20

20.45

... More
MS Bore cover 150mm dia

1

170

170.42

... More
MS clamp set 25mm dia., 450mm length, 10mm thick, 50mm wide with 4no. of M12 bolts and nuts

1

284

284.04

... More
Installation and commissioning of submersible pump set

1

1704

1704.23



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.