State Warehousing Corporation Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

State Warehousing Corporation Tender

Works
Civil And Construction
Building Construction
Opening Date7 Mar 2025
Closing Date21 Mar 2025
Tender Amount₹ 6,93,20,506 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Nipple GI 25mm dia, Medium class

1

20

20.45

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Bends GI 25mm dia, Heavy class

1

56

56.81

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Stainless steel serrated - screwed connector NB25 x 300mm length

2

227

454.46

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;HDPE pipe confirming to IS:4984-1995, PE100 PN10 DN32

150

47

7158

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Submersible cable PVC sheathed, PVC insulated, flexible, flat , 3-core 2.5sq.mm

64

159

10179.84

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Cable PVC insulated 7/20

98

19

1892.38

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply, delivery of the following accessries suitable to single phase motor pump set: DOL starter suitable to single phase motor pump set up to 3.00HP

1

2726

2726.76

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and transportation of 2.00 HP 25 stage Single phase ISI Submersible motor pump set suitable for 4" bore well of make CRI/ KSB/ Texmo etc., complete including cost and conveyance of all materials

1

37492

37492.95

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and delivery of UPVC pipe 180mm DN, class '3' (6kg/cm2 WP) including cost & conveyance and all taxes

70

798

55909.7

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Borewell with pumpset for water supply:- Drilling of 165mm dia Bore well in all types of stratae using DTH ring, drilling over burdan of 180mm dia and insertion of PVC casing pipe with coupling and flushing, up to depth as directed by the officer in charge of work including tranportation of rig support vehicle, conductiong yield test, crew charges, incidental charges, over head charges and contractor profit buu excluding GST but excluding cost of casing pipe etc., complete

170

306

52149.2

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars etc., complete as per APSS No.126

0.5

74245

37122.57

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 Nominal mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Columns

1.22

14246

17380.17

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 Nominal mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Footings

0.66

11045

7289.71

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply, delivery and fixing of MS gate using MS squire pipes as per approved design and specification and design including cost of materials, fabrication, transportation and labour charges for fixing etc., complete

500

144

72145

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Colour washing two coats with cement based paint of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

3150

65

206766

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plaster Single coat 12mm thick, CM (1:4) prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete to concrete surfaces

1500

190

286425

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Plastering 12mm thick single coat with cement mortar (1:6) Prop. with sponge finishing including cost and conveyance of all materials, labour charges, curing including water leads, mixing of mortar etc., complete for finished item of work.

1650

180

298188

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of fencing posts over compound wall using MS ISA 35x35x5 mm and length of 1.00 M including cutting, bending, welding hooks for fixing of barbed wire etc., complete for finished item of work.

640

123

79257.6

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38 Kg per 100 metres (min.), Straining and fixing to any type of standard, rails, straining bolts, including securing with and provision of galvanised mild steel wire, stapples or steel pins, etc., as directed by Officer in charge including cost and conveyance of all materials and labour charges , overhaed charges, contractor profit but excluding GST etc., complete

1550

21

33557.5

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing PCC M20 grade using 43 grade Cement or any other type, Coarse aggregate of 20mm nominal graded size and Fine aggregate, manual mixing including cost & conveyance of material and labour charges etc., complete for Bed blocks/Coping

7.75

6505

50417.55

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Masonry work in cement mortar (1:6) Prop. with fly ash cement solid blocks of size 290x225x140mm for manufacturing of fly ash solid blocks using fly ash 80kgs, cement of 15 kgs gypsum of 5 kgs and stone dust including cost and conveyance of all materials, Labour Charges, water leads, curing, scaffolding charges, lift charges, machine mixing charge etc., complete with compressive strength not less than 50kgs for 225mm thick walls for superstructure and others

182.31

7774

1417445.67

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Basement

105

5820

611134.65

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Foundation

137

5502

753891.82

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

48

5346

256621.44

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Construction of Compound Wall:- Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

265

416

110277.1

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing independent earthing by excavating a pit to a depth of 2.1m in all soils, as per size specified, using GI pipe 40mm dia medium class of 2.5m length duly providing staggered holes and with necessary accessories and with hume pipe ring including filling with equal proportion of Salt and Charcoal in layers including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

6635

6635.12

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Laying of 50/38mm dia DWC pipe for UG cable protection in the ground, including cost and conveyance of pipe, charges for earth work excavation for trench and laying & jointing of pipe line, overhead charges and contractor profit but excluding GST etc,. Complete

25

123

3096

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and laying of 6 sqmm 2 core XLPE insulated, 1100V grade armoured aluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/Finolex/ Havels/V-Guard or equivalant including cost of all cable, labour charges, overhead charges and contractor profit but excluding GST etc., complete.

25

541

13538.25

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 48" (1200mm) Sweep Ceiling Fan without Regulator with 5 Star rating of makes Crompton / Bajaj / Orient /Usha including transportation and labour charges for Fixing of Ceiling fan and regulator and giving connections with twin core wire etc., complete.

1

3710

3710.28

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 20W LED Street light luminair, body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 l with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., with BIS certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

2

2377

4754.78

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with single side connection with BIS Certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/ Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

2

755

1511.08

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing 4 way SPN Distribution board with IP-20/30 protection (Metal Door) suitable for single phase 40A DP Isolator - 1 No as incomer and 6-32 A 10kA SP MCBs - 4 Nos as outing going including internal connection and labour charges for surface / flush mounting etc., complete.

1

7072

7072.53

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of 6A/16A 3/2 pin modular socket with 16A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

3

472

1416.06

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, Batten/Angular holder including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., for Light points in Residential buildings

2

649

1299.76

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, ceiling rose including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete for Tube Light, Fan points in Residential buildings

3

649

1949.64

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

2

221

443.1

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 12 Module box

1

272

272.68

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Earth continuity including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complette

15

23

345.6

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and run of 2x2.50 sq.mm (36/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. For Circuits from DB to power points

30

112

3386.1

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

2

267

534

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 12 Module box

1

323

323.8

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 25mm dia 1.80mm thick PVC pipe (ISI mark) concealed in wall with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

26.9

153

4141.25

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;ELECTRIFICATION TO WEIGHBRIDGE AND CABIN ROOM:- Supply and Fixing of 25mm dia 2.2mm thick P.V.C. pipe (ISI mark) concealed in roof slabs with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

16.2

87

1419.12

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Rain water piping system for Roof draianage of length 6.0m length using PVC pipes 160mm dia with fittings Bell mounth at top, bends as required and shoe bend at bottom and fixing to wall with clamps by down taking from Gutter slab and connecting to chamber including cost and conveyance of pipe, fittings and all labour charges for fixing, overhead charges and contractor profit but excluding GST etc,. Complete.

1

4052

4052.65

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting two coats of synthetic enamel paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of dead mortar, including cost and conveyance of all materials to work site and all operational, incidental, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

11.19

214

2400.93

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new walls with 2 coats of Acrylic exterior emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for external walls

74.57

171

12776.82

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

45.94

109

5052.48

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new walls with 1coat of Cement primer exterior Gr.2 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per APSS No.911 for internal walls

74.57

74

5562.18

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new walls with 1coat of Cement primer Interior Gr.1 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.complete for finished item of work as per APSS No.911 for internal walls

45.94

69

3176.29

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Granolithic Flooring with Cement concrete (1:1:2) prop. 50mm thick using using 20mm nominal graded size crushed metal as Courase aggregate, River Sand as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete

15.84

359

5690.04

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Base course below Flooring

1.58

5346

8447.12

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) casement windows openable shutters duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60 mm x 2.40 mm for mullion sections for two or more openable shutters 75 mm x 60 mm x 2.40 mm foropenable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co- extruded with Grey colour soft PVC and accessories for casement window ? friction hinges of stainless steel grade 304/430- 2 Nos., per sash, handle with mazak alloy casting 1 No. per sash, multipoint locking system suitably concealed 1 No., per sash provided with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

3.24

7266

23544.5

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing in position of MS Door 900x2000mm size with Frame ISA 35x35x4mm and Shutter with ISA 25x25x3mm frame and sheet 1.6mm thick as per approved design and specifications including cost and conveyance of all matertials, fabrication charges and labour charges for fixing, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

1

7547

7547.82

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plastering Two coats 12mm thick, base coat 8mm thick in CM (1:5) prop., and finished coat 4mm in CM (1:3) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to External walls

120.51

471

56767.44

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plaster two coats 12mm thick, base coat 8mm thick in CM (1:5) prop., and finished coat 4mm in CM (1:3) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to celing

21.62

485

10489.38

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement -15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges,curing charges, overhead charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others.

10.46

7774

81325.66

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing PCC (1:2:4) or M15 Grade concrete using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bed blocks

0.11

6505

715.6

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

1

74245

74245.13

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Sun shades 0.60 Mt wide

3.06

1387

4246.33

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Lintels

0.17

14463

2458.72

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Roof Slab 115mm thick

25.55

1525

38968.09

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Roof Beam

1.19

13344

15879.6

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Plinth Beam

2.75

14018

38550.38

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Columns

1.29

14246

18377.39

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Footings

2.02

11045

22310.92

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Basement

8.9

5820

51800.94

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Foundation

2.2

5502

12106.29

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

15

111

1665

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

0.86

5346

4597.8

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Construction of Cabin Room:- Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

8.64

416

3595.45

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of Copper plate of size 20x2mm as directed by the officer incharge of workincluding cost and conveyance of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete .

20

471

9422.6

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of MS flat of size 50x10mm of 1.20m length including cost and conveyance steel, welding charges etc., complete and as directed by the officer incharge of work.

12

579

6954.84

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of ISA 65x65x6mm size for Kerb protection, as directed by the Officer in charge including cost of steel, fabriaction charges, labour charges for fixing over head charges and contractor profit but excluding GST etc., complete

18.6

123

2303.42

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing PCC (1:2:4) or M15 Grade concrete using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Ramps

9.6

6505

62452.7

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

1

74245

74245.13

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete

10.44

5502

57449.86

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Beams

3.63

13344

48439.45

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Pedestals

3.24

11671

37814.14

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Footings

8.1

11045

89464.58

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

13.56

5346

72495.56

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Construction of Weighbridge foundation:- Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

75.03

416

31222.98

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and laying of RCC Hume pipe of 450mm Dia NP3 including cost of pipe and transporatation, hiring of cranes for laying of pipe, hiring of Hydraulic excavator charges for earthwork excavation etc complete.

15

3223

48345.6

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:4:8) prop. Nominal mix using 40 mm Nominal graded size crushed metal as coarse aggregate, River sand as Fine aggregate and 43 grade OPC, mixing mechanically, placing including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, for Bedding

2.03

5898

11973.75

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Earth work in excavation for Foundation of structures and depositing on bank with initial lead and lift including labour charges, overhead charges, contractor profit but excluding GST etc., complete, in Ordinary soils upto 3m depth by mechanical means

12.15

84

1022.54

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing, laying, spreading and compacting stone aggregates of 40 mm Single nominal size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 kN in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 MORD.

416.65

3434

1430842.76

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing, laying, spreading and compacting stone aggregates of 63 mm nominal single size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 kN in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 MORD including cost & conveyance of mateial, machinery charges, labour charges, overhead charges & contractor profit and seigniorage charges but excluding GST

526.26

3180

1673669.94

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Construction of Granular Sub Base using well graded material (Crushed stone chips with dust) of Grading III confirming to Table 400.1A of MoRD Specifications for Rural Roads, including spreading the material with motor grader in uniform layers of loose thickness of not more than 225mm and compacting with three wheeled power roller of 80 to 100kN capacity to achieve the desired density complete as per Clause 401 of MoRD specifications for Rural Roads including cost & conveyance of all materials, machinery hire charges, labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete

827.52

2889

2391160.42

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;INTERNAL ROADS: Construction and widening of Embankment with earth obtained from out side Godown boundary by mechanical means with leads and lifts including pre watering of soil, removal of top soil, excavation of soils, depositing the soils on embankment, breaking clods, Spreading, sectioning, grading and compacting withVibratory roller to max dry density as per Clause 301 of MoRD Specifications of Rural Roads including overhead charges & contractor profit, but excluding GST

1403.36

242

340342.87

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing independent earthing by excavating a pit to a depth of 2.1m in all soils, as per size specified, using GI pipe 40mm dia medium class of 2.5m length duly providing staggered holes and with necessary accessories and with hume pipe ring including filling with equal proportion of Salt and Charcoal in layers including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

6635

6635.12

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Laying of PVC pipe line of 110mm dia for UG cable protection in the ground, including cost and conveyance of pipe, charges for fixing, overhead charges and contractor profit but excluding GST etc,. Complete

25

228

5700

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and laying of 6 sqmm 2 core XLPE insulated, 1100V grade armoured aluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/Finolex/ Havels/V-Guard or equivalant including cost of all cable, labour charges, overhead charges and contractor profit but excluding GST etc., complete.

25

541

13538.25

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 48" (1200mm) Sweep Ceiling Fan without Regulator with 5 Star rating of makes Crompton / Bajaj / Orient /Usha including transportation and labour charges for Fixing of Ceiling fan and regulator and giving connections with twin core wire etc., complete.

4

3710

14841.12

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 20W LED Street light luminair, body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 l with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., with BIS certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

2

2377

4754.78

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with single side connection with BIS Certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/ Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

6

755

4533.24

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing 4 way SPN Distribution board with IP-20/30 protection (Metal Door) suitable for single phase 40A DP Isolator - 1 No as incomer and 6-32 A 10kA SP MCBs - 4 Nos as outing going including internal connection and labour charges for surface / flush mounting etc., complete.

1

7072

7072.53

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of 6A/16A 3/2 pin modular socket with 16A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

8

472

3776.16

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, Batten/Angular holder including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., for Light points in Residential buildings

9

649

5848.92

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, ceiling rose including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete for Tube Light, Fan points in Residential buildings

12

649

7798.56

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches, sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 2 Module box

2

96

193.14

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches, sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

8

221

1772.4

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and run of 1x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Earth continuity including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complette

50

56

2825.5

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and run of 2x2.50 sq.mm (36/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. For Circuits from DB to power points

50

112

5643.5

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 2 Module box

2

90

181.78

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

8

267

2136

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 25mm dia 1.80mm thick PVC pipe (ISI mark) concealed in wall with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

73

153

11238.35

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Electrification to Parking Shed:- Supply and Fixing of 25mm dia 2.2mm thick P.V.C. pipe (ISI mark) concealed in roof slabs with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

5

87

438

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Construction of Septic tank of internal size 2.00 x 0.9x1.70m with walls 230mm thick built out in Fly ash bricks in CM (1:6), over Flooring 300mm thick in PCC 1:3:6 prop., plastered in CM 1:4 prop., inside walls and flooring and covered with RCC slab with acces opening of 455 x 610mm fitted with RCC cover and with inlet and out let arrangements including earthwork excavation cost and conveyance of all materials required to the work, labour charges , overhead charges and contractor profit but excluding GST etc.,complete. as per approved design and drawing

1

40593

40593.84

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Constructing Inspection chamber 457.2 mm x 457.2 mm size up to 914.4 mm in Brick masonry CM 1:6 prop., and fitted with light weight 457.2 mm x 457.2 mm C.I frame and cover including cost & conveyance of all materials, labour chrges, over head charges and contractor profit but excluding GST etc., complete

2

5237

10475.3

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Laying, fixing and commissioning of PVC/SWR pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice

10

118

1181.6

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Nahany trap with jali 75 mm dia

2

118

236.32

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Single Tee with door 75 mm dia

1

99

99.98

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Single 'Y' with Door 75 mm dia

2

128

256.76

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Vent Cowl 110 mm dia

1

26

26.13

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Single 'Y' with Door 110 mm dia

1

230

230.64

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Single Tee with door 110 mm dia

1

174

174.97

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Door Bend 110 mm dia - 87.5 Degree

2

145

290.86

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Plain Bend 110 mm dia - 87.5 Degree

2

113

227.24

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR pipe 75 mm dia - Type- A Double socket 0.91m length

3

148

446.52

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR pipe 75 mm dia - Type- A Single socket 3m length

3

341

1025.94

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR pipe 110 mm dia - Type- A Double socket 0.91m length

3

282

848.7

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of PVC/SWR Pipes and fittings including cost and conveyance of materials etc., complete including over heads & contractors profit but excluding GST. SWR pipe 110 mm dia - Type- A Single socket 3m length

4

646

2585.88

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of Orissa Pan white glazed WC 1st quality ISI marked with "P" or "S" trap, 630mm x 450mm size of Parry company make including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

2

2507

5014.96

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of CP Long body Bib cock fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/ Senior/ Nice or equivalent including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

8

957

7662.16

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of CPVC pipes and fittings of 15.90mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

15

176

2641.5

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of CPVC pipes and fittings of 28.60mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

10

267

2670

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete

1000

11

11360

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Lowering, laying and jointing HDPE pipes 32mm OD and specials / fittings as per IS:7364 part -II - 1975 including excavation of trench of 0.5m width and 0.50 m depth in all soils except rock requiring blasting and refilling trenches after laying and jointing pipes including cost of jointing material,labour charges, overhead charges contractor profit but excluding the cost of pipes and GST etc., complete.

50

56

2840.5

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and delivery of 32mm OD HDPE pipes (PE100 PN10 DN32) confirming to IS:4984-1987 including cost of pipe, transportation charges, overhead charges and contractor profit but excluding GST etc., complete

50

47

2386

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new wood work with 2 coats of synthetic enamel paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of dead mortar, including cost and conveyance of all materials to work site and all operational, incidental, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

6.75

214

1448.28

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new iron work with 2 coats of synthetic enamel paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of dead mortar, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work

53.36

129

6930.93

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Colour washing two coats with cement based paint of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

443.45

65

29108.06

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supplying and fixing of Precast RCC grills of approved design of 40mm thick manufactured with M-30 grade concrete using vibro compaction process using joint less FRP moulds to achieve shuttering finish including cost of material, transportation charges, fixing charges, overhead charges, contractor profit but excluding GST etc., complete.

1.9

643

1221.81

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Wood Polymer Composite (WPC) Door of size 750x2050mm, Frame of section size 100x65mm made up of WPC single extruded with encapsulation of 6mm rigid layer with MS hold fasts - 6 Nos and Shutter made up of WPC comprising of 70% virgin polymer, 15% wood powder (fibre)of 30mm thick 700x1900mm size -1No , with Stainless steel fittings: Hinges 125mm - 3 Nos, Tower bolts 100mm - 1 No, Handles 125mm - 2 Nos, Aldrop 200mm - 1 as per approved design and specifications including cost and conveyance of all materials, all fittings, labour charges, overhead charges and contractor profit but excluding GSTetc., complete

2

9824

19649.98

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing in position of MS Window of 900x900mm size with Frame ISA 35x35x4mm and 10mm size sq.bars and Shutter with ISA 25x25x3mm frame and sheet 1.6mm thick as per approved design and specifications including cost and conveyance of all matertials , fabrication charges and labour charges for fixing overhead charges and contractor profit but excluding GST etc., complete for finished item of work

2

4568

9137.6

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing in position of MS Door 900x2000mm size with Frame ISA 35x35x4mm and Shutter with ISA 25x25x3mm frame and sheet 1.6mm thick as per approved design and specifications including cost and conveyance of all matertials, fabrication charges and labour charges for fixing overhead charges and contractor profit but excluding GST etc., complete for finished item of work

2

7547

15095.64

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Dadoing to internal walls to 2100mm height with Glazed ceramic tiles 7.30 mm thick, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including including cost & conveyance of all materials , labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

14.4

578

8331.98

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including cost & conveyance of all materials , labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

2.88

878

2531.2

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Granolithic Flooring with Cement concrete (1:1:2) prop. 50mm thick using using 20mm nominal graded size crushed metal as Coarse aggregate, River Sand as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete

128.7

359

46231.61

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Base course below Flooring

8.82

5346

47154.19

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Roofing with pre painted trapezoidal profile Galvalume sheet of IS:15965/YS550/ AZ150/ Class3, 0.5mm thick, 1020mm width, provided with anti capillary grove including sheet fixing with Hilt/Corroshield self drilling screws with neoprene washer and side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape, and fixing of sky light of 2mm thick polycorbonate sheet of size 1.30x1.00m including cost and conveyance of all material, labour charges etc., complete

139.5

672

93753.77

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Steel work in built up tubular Posts, Rafters and Purlins including cutting hoisting fixing in position and applyng a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. This includes the cost of trusses, rafter purlins, sleeves false rafter base plates lacing and bracing MS bolts and nuts and base plate on top of column as per relevant approved drawings and direction of Engineer-in-charge (There is no trusses over Gable walls and partition walls). The work including cost of material shall be executed as per approved drawings. The trusses shall be fabricated by the contractor at his own cost exactly as per approved drawings

1137

171

195063.72

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plastering Single coat 12mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete

443.45

180

80140.28

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Masonry work in cement mortar (1:6) Prop. with fly ash cement solid blocks of size 290x225x140mm for manufacturing of fly ash solid blocks using fly ash 80kgs, cement of 15 kgs gypsum of 5 kgs and stone dust including cost and conveyance of all materials, Labour Charges, water leads, curing, scaffolding charges, lift charges, machine mixing charge etc., complete with compressive strength not less than 50kgs for 225mm thick walls for superstructure.

51.11

7774

397376.16

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Plain Cement Concrete (1:2:4) Prop. Using 20mm size ISI gauge hard broken granite machine crushed metal including cost and conveyance of all materials to site of work and labour charges, centering, machine mixing, laying, curing and all other incidental and operational charges

4.55

6505

29599.98

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

103.35

111

11471.85

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing impervious coat to exposed RCC roof slab surface with CM (1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green, mixing mortar, laying, rendering smoot, rounding off junctions of wall and slab and curing including cost of all materials, labour charges, overhead charges, contractor profit but excluding GST etc., complete for finished item of the work for Gutter at 5.05m level

8.34

543

4534.12

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

1

74245

74245.13

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Roof Slab 115mm thick

8.34

1525

12719.92

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Roof Beam

0.68

13344

9074.06

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Lintels and lofts over openings

0.08

14463

1157.04

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Plinth Beam

1.28

14018

17943.45

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Columns

0.7

14246

9972.23

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost & conveyance of all materials, charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machinery hire charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members Footings for columns

1.73

11045

19107.87

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Basement

20.66

5820

120248.02

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Foundation

19.85

5502

109231.77

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

10.52

5346

56242.87

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Construction of Parking shed and Hamalies Toilets:- Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by mechanical means - upto 3 m depth

42.53

84

3579.32

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing independent earthing by excavating a pit to a depth of 2.1m in all soils, as per size specified, using GI pipe 40mm dia medium class of 2.5m length duly providing staggered holes and with necessary accessories and with hume pipe ring including filling with equal proportion of Salt and Charcoal in layers including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

6635

6635.12

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Laying of 50/38mm dia DWC pipe for UG cable protection in the ground, including cost and conveyance of pipe, charges for earth work excavation for trench and laying & jointing of pipe line, overhead charges and contractor profit but excluding GST etc,. Complete

75

123

9288

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Laying of PVC pipe line of 110mm dia for UG cable protection in the ground, including cost and conveyance of pipe, charges for fixing, overhead charges and contractor profit but excluding GST etc,. Complete

50

228

11400

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and laying of 10 sq.mm 2 core XLPE insulated, 1100V grade armoured aluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/Finolex/ Havels/V-Guard or equivalant including cost of all cable, labour charges, overhead charges and contractor profit but excluding GST etc., complete.

150

734

110167.5

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Fabrication and erection of Control panel board of size 560x560x200mm for power control made out of 16 SWG CRCA sheet steel and provided with TP MCCB 125A 4 pole - 1 No, 40-63A DP MCB - 3 Nos and LED indicator including cutting, bending drilling, welding and reveting etc., complete with cleaning with 7 tank process and painting with powder coating including cost and conveyance of all materials and labour charges.

1

29924

29924.6

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and laying of 6 sqmm 2 core XLPE insulated, 1100V grade armoured aluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/Finolex/ Havels/V-Guard or equivalant including cost of all cable, labour charges, overhead charges and contractor profit but excluding GST etc., complete.

10

541

5415.3

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 48" (1200mm) Sweep Ceiling Fan without Regulator with 5 Star rating of makes Crompton / Bajaj / Orient /Usha including transportation and labour charges for Fixing of Ceiling fan and regulator and giving connections with twin core wire etc., complete.

3

3710

11130.84

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 20W LED Street light luminair, body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 l with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., with BIS certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

2

2377

4754.78

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with single side connection with BIS Certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/ Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

8

755

6044.32

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing 8 way SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

7072

7072.53

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of 20A pin modular socket with 20A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

2

614

1228.08

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of 6A/16A 3/2 pin modular socket with 16A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

12

472

5664.24

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, Batten/Angular holder including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., for Light points in Residential buildings

9

649

5848.92

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, ceiling rose including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete for Tube Light, Fan points in Residential buildings

12

649

7798.56

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 2 Module box

4

96

386.28

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

6

221

1329.3

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 12 Module box

5

272

1363.4

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and run of 1x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Earth continuity including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complette

200

23

4608

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and run of 2x4.0 sq.mm (56/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete

50

171

8575

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and run of 2x2.50 sq.mm (36/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. For Circuits from DB to power points

200

112

22574

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 2 Module box

4

90

363.56

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

6

267

1602

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 12 Module box

5

323

1619

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 25mm dia 1.80mm thick PVC pipe (ISI mark) concealed in wall with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

73

153

11238.35

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;ELECTRIFICATION TO OFFICE BUILDING:-Supply and Fixing of 25mm dia 2.2mm thick P.V.C. pipe (ISI mark) concealed in roof slabs with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

51

87

4467.6

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Construction of Septic tank of internal size 2.00 x 0.9x1.70m with walls 230mm thick built out in Fly ash bricks in CM (1:6), over Flooring 300mm thick in PCC 1:3:6 prop., plastered in CM 1:4 prop., inside walls and flooring and covered with RCC slab with acces opening of 455 x 610mm fitted with RCC cover and with inlet and out let arrangements including earthwork excavation cost and conveyance of all materials required to the work, labour charges , overhead charges and contractor profit but excluding GST etc.,complete. as per approved design and drawing

1

40593

40593.84

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Constructing Inspection chamber 457.2 mm x 457.2 mm size up to 914.4 mm in Brick masonry CM 1:6 prop., and fitted with light weight 457.2 mm x 457.2 mm C.I frame and cover including cost & conveyance of all materials, labour chrges, over head charges and contractor profit but excluding GST etc., complete

1

5237

5237.65

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Laying, fixing and commissioning of PVC/SWR pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice

15

118

1772.4

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Nahany trap with jali 75 mm dia

3

118

354.48

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Single Tee with door 75 mm dia

2

99

199.96

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Single 'Y' with Door 75 mm dia

2

128

256.76

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Vent Cowl 110 mm dia

1

26

26.13

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Single 'Y' with Door 110 mm dia

3

230

691.92

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Single Tee with door 110 mm dia

3

174

524.91

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Door Bend 110 mm dia - 87.5 Degree

2

145

290.86

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR Plain Bend 110 mm dia - 87.5 Degree

2

113

227.24

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR pipe 75 mm dia - Type- A Double socket 0.91m length

2

148

297.68

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR pipe 75 mm dia - Type- A Single socket 3m length

3

341

1025.94

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;SWR pipe 110 mm dia - Type- A Double socket 0.91m length

2

282

565.8

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of PVC/SWR Pipes and fittings including cost and conveyance of materials etc., complete including over heads & contractors profit but excluding GST. SWR pipe 110 mm dia - Type- A Single socket 3m length

3

646

1939.41

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with 19.05mm 400gms NP stop cock Indian make with ISI mark Seiko/Senior/Nice or equivalent parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Single C.P. Pillar cock including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

2

3327

6655.56

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 floor mounted close coulpled dual flush porcelainn cistern fixed on wash down white glazed with 'S' trap of Hindustan / Neycer or Parryware make including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

1

19678

19678.12

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of Orissa Pan white glazed WC 1st quality ISI marked with "P" or "S" trap, 630mm x 450mm size white glazed of Parry company make including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

1

2507

2507.48

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of CP Long body Bib cock fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/ Senior/ Nice or equivalent including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

4

957

3831.08

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of CPVC pipes and fittings of 15.90mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

10

176

1761

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of CPVC pipes and fittings of 28.60mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

10

267

2670

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete

1000

11

11360

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Lowering, laying and jointing HDPE pipes 32mm OD and specials / fittings as per IS:7364 part -II - 1975 including excavation of trench of 0.5m width and 0.50 m depth in all soils except rock requiring blasting and refilling trenches after laying and jointing pipes including cost of jointing material,labour charges, overhead charges contractor profit but excluding the cost of pipes and GST etc., complete.

100

56

5681

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and delivery of 32mm OD HDPE pipes (PE100 PN10 DN32) confirming to IS:4984-1987 including cost of pipe, transportation charges, overhead charges and contractor profit but excluding GST etc., complete

100

47

4772

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new wood work with 2 coats of synthetic enamel paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of dead mortar, including cost and conveyance of all materials to work site and all operational, incidental, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

28.35

214

6082.78

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new walls with 2 coats of Acrylic exterior emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for external walls

217.75

171

37309.29

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls

293.61

109

32291.23

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new walls with 1coat of Cement primer exterior Gr.2 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work

217.75

74

16241.97

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new walls with 1coat of Cement primer Interior Gr.1 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls

293.61

69

20300.2

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing and applying Cement based putty of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges including overhead charges & Contractors profit etc., complete but excluding GST and seigorage charges for finished item of work for Internal walls.

293.61

239

70387.13

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Granolithic Flooring with Cement concrete (1:1:2) prop. 50mm thick using using 20mm nominal graded size crushed metal as Courase aggregate, River Sand as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete

25.06

359

9002.05

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Dadoing to internal walls to 2100mm height with Glazed ceramic tiles 7.30 mm thick, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete

7.2

578

4165.99

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

5.27

878

4631.75

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing skirting to internal walls to 15 cm height with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water and including cost and conveyance of all meterials and labour charges, overhead charges & Contractors profit etc., complete but excluding GST and seigorage charges for finished item of work

4.8

1200

5760

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles, overhead charges & Contractors profit etc., complete but excluding GST and seigorage charges for finished item of work

48.46

1212

58750

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Base course below Flooring

7.67

5346

41005.97

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of MS Grills to Window, Ventilator as per APSS No.126 including cost of MS sections, rods and welding rods, power charges, including cost of material, fabrication charges, fixing charges, over head charges and contractor profit but excluding GST etc complete for finished item of work in all floors.

240

123

29721.6

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision ? (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVCresin) of (80 mm x 52 mm)/ (94 mm x 45 mm) x 2.20 mm for outer frames, (54 mm x 38 mm)/(39 mm x 58 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be coextruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work

12.6

7266

91561.93

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Wood Polymer Composite (WPC) Door of size 750x2050mm, Frame of section size 100x65mm made up of WPC single extruded with encapsulation of 6mm rigid layer with MS hold fasts - 6 Nos and Shutter made up of WPC comprising of 70% virgin polymer, 15% wood powder (fibre)of 30mm thick 700x1900mm size -1No , with Stainless steel fittings: Hinges 125mm - 3 Nos, Tower bolts 100mm - 1 No, Handles 125mm - 2 Nos, Aldrop 200mm - 1 as per approved design and specifications including cost and conveyance of all materials, all fittings, labour charges, overhead charges and contractor profit but excluding GSTetc., complete

2

9824

19649.98

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Wooden Door with Flush shutter, of size 1000x2100mm, Frame made up of Medium Teak wood, of section size 100x65mm with MS hold fasts - 6 Nos and WPC Flush door shutters, solid bond wood block board type with teak veneer on one face and commercial ply on another face (lipping): 30 mm thick conforming to IS:2202 950x2000mm size, with MS fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 150mm - 2 Nos, Aldrop 300mm - 1 No, as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete. Door - 1.00 x 2.10m

5

13882

69414.75

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Wooden Door Fully Panelled of size 1200x2100mm, Frame made up of Medium Teak wood, of section size 100x75mm with MS hold fasts - 6 Nos and Panelled Shutter Two leaves 545x2000mm size, 32mm thick one 1 No made with Teak wood planks 30mm thick, with SS fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 150mm - 2 Nos, Aldrop 300mm - 1 No, as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete. Door - 1.20 x 2.10m

1

32928

32928.32

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plaster two coats 12mm thick, base coat 8mm thick in CM (1:5) prop., and finished coat 4mm in CM (1:3) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST for Internal walls

408.26

471

192314.96

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plaster two coats 12mm thick, base coat 8mm thick in CM (1:5) prop., and finished coat 4mm in CM (1:3) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to celing

103.1

485

50021.03

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement -15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges,curing charges,over head charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others.

30.85

7774

239856.28

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing PCC (1:2:4) or M15 Grade concrete using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bed blocks

0.45

6505

2927.47

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green, mixing mortar, laying, rendering smoot, rounding off junctions of wall and slab and curing including cost of all materials, labour charges, overhead charges, contractor profit but excluding GST etc., complete for finished item of the work for Roof Slab

104.75

543

56948.38

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

5.5

74245

408348.22

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete Waist Slab 150mm thick

9

2301

20709.18

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete Roof Slab 115mm thick

104.75

1525

159761.56

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete Sun shades and Chajja 50mm thick

5.78

1387

8020.85

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete Lintels

0.8

14463

11570.43

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete Roof Beam

4.11

13344

54844.66

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete Columns

5.61

14246

79920.28

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete Plinth Beam

5.49

14018

76960.58

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 design mix using 43/53 OPC, Crushed metal of 20mm nominal graded size as Coarse aggregate and Blended sand (50% River sand, 50% stone crushed sand) as Fine aggregate mixing mechanically using Concerete Mixer with suitable weigh batcher, placing concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete Footings for columns

9.83

11045

108572.45

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

122.44

111

13590.84

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Basement

17.15

5820

99818.66

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Foundation

12

5502

66034.32

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

12

5346

64155.36

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Construction of Office building:- Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by mechanical means - upto 3 m depth

75

84

6312

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing independent earthing by excavating a pit to a depth of 2.1m in all soils, as per size specified, using GI pipe 40mm dia medium class of 2.5m length duly providing staggered holes and with necessary accessories and with hume pipe ring including filling with equal proportion of Salt and Charcoal in layers including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.

2

6635

13270.24

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and laying of 6 sq.mm 2 core XLPE insulated, 1100V grade armoured aluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/Finolex/ Havels/V-Guard or equivalant including cost of all cable, labour charges, overhead charges and contractor profit but excluding GST etc., complete.

100

541

54153

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Laying of 50/38mm dia DWC pipe for UG cable protection in the ground, including cost and conveyance of pipe, charges for earth work excavation for trench and laying & jointing of pipe line, overhead charges and contractor profit but excluding GST etc,. complete

250

123

30960

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 20W LED Street light luminair, body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 l with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., with BIS certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

8

2377

19019.12

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with single side connection with BIS Certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

108

755

81598.32

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

2

7072

14145.06

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of 6A/16A 3/2 pin modular socket with 16A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

72

472

33985.44

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, ceiling rose including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete for Tube Light, Fan points in Non Residential buildings

108

649

70187.04

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches, sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 6 Module Box

40

181

7271.2

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches, sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 8 Module Box

40

221

8862

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and run of 1x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Earth continuity including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete

2500

23

57600

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and run of 2x2.50 sq.mm (36/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete

2500

112

282175

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 6 Module Box

40

204

8180.4

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 8 Module Box

40

267

10680

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;ELECTRIFICATION TO GODOWNS:- Supply and fixing of 25mm dia 1.80mm thick PVC pipe (ISI mark) concealed in wall with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

900

153

138555

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting Stack marking as directed by the Engineer in charge including cost of synthetic enamel paint and and painter charges, over head charges and contractor profit but excluding GST etc., complete

24

568

13633.92

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting and Lettering in enamel paint for Godown numbering, Compartment numbering, Stack marking and numbering as directed by the Engineer in charge including cost of synthetic enamel paint and and painter charges, over head charges and contractor profit but excluding GST etc., complete

2

5681

11362

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of Aluminum ladder of size 16 feet length while closing and 30 feet length while extended and made of Aluminum 'C' section of 3mm thich of all verticals and steps 1" dia 2mm aluminum tubes etc., complete with safety locks, rope, pulley, safety limit, rubber shoes, folding platforms, safety rings, hand rails fitted to extended section 2Nos 8" dia teflon wheels fixed for sliding etc., complete.

2

30676

61352

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply of Portable Fire extinguishers water type (gas catridge) of 9 Lit. capacity confirming to IS: 940-2003 including cost and conveyance charges, over charges and contractor profit but excluding GST etc complete

4

2045

8180

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new Iron work with Synthetic enamel paint of approved colour without priming coat including cost and conveyance of paint, brushes, labour charges, overhead charges and contractor profit but excluding GST etc complete for finished item of work

1089.8

129

141554.12

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new walls with 2 coats of Acrylic exterior emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for external walls

5016.56

171

859537.39

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Painting to new walls with 1coat of Cement primer exterior Gr.2 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental charges, labour charges, overhead charges and contractor profit etc.complete for finished item of work for exterior walls

5016.56

74

374185.21

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;White washing two coats to all the Interior wall surfaces cost and conveyance of all materials to site of work such as lime, gum, conge water and labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work for interior walls

4915.86

43

215118.03

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Constructing of Collection chamber 457.2 mm x 457.2 mm size up to 914.4 mm in Brick masonry CM (1:6) prop., and fitted with light weight 457.2 mm x 457.2 mm C.I frame and cover including cost & conveyance of all materials, labour charges, over head charges and contractor profit but excluding GST etc., complete

108

5237

565666.2

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Laying of PVC pipe line of 160mm dia for Rain water drainage in the Platform, connecting from collection chamber and letting out side including cost and conveyance of pipe, charges for fixing, overhead charges and contractor profit but excluding GST etc,. Complete

263.52

490

129340.89

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Rain water piping system for Roof drainage of length 6.0m length using PVC pipes 160mm dia with fittings Bell mounth at top, bends as required and shoe bend at bottom and fixing to wall with clamps by down taking from Gutter slab and connecting to chamber including cost and conveyance of pipe, fittings and all labour charges for fixing, overhead charges and contractor profit but excluding GST etc,. Complete.

108

4052

437686.2

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Roofing with pre painted trapezoidal profile Galvalume sheet of IS:15965/YS550 /AZ150/Class3, 0.5mm thick, 1020mm width, provided with anti capillary grove including sheet fixing with Hilt/Corroshield self drilling screws with neoprene washer and side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape, and fixing of sky light of 2mm thick polycorbonate sheet of size 1.30x1.00m including cost and conveyance of all material, labour charges etc., complete

1829.02

672

1229229.47

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and fixing of MS Anchor bolts of 16mm dia x 450mm length including cost steel, turing, fabrication and labour charges for fixing, overhead charges and contractor profit but excluding GST etc., complete

896

175

157256.96

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing and fixing of Trusses made up Circular hollow sections and Purlins made up made up of rectangular hollow sections including cutting, fabrication and hoisting in position as per approved drawings and direction of Engineer in charge, the work including cost of material, fabrication charges and errection charges, overhead charges, contractor profit but excluding cost of bolts and nuts and GST

12583.92

171

2158897.32

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing and fixing MS ISA Fender to Coping beam over Platform as per approved drawing including cost of structural steel, fastners, fabricatio charges and errection charges, overhead charges and contractor profit but excluding GST etc, complete

5089.64

123

630301.02

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm centre, Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts,bolts, nuts, rivets, locking arrangements, stoppers, handles, all accessories all fixtures and painted with one coat of approved steel primer etc., complete including cost and conveyance of all materials, labour charges, all fittings and furniture, overhead charges & Contractors profit but excluding GST etc., complete

142.88

4563

652091.46

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete as per approved drawing including cost and conveyance of all materials, labour charges, all fittings and furniture, overhead charges & Contractors profit but excluding GST etc., complete

106.58

5217

556049.18

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Manufacturing, supply and fixing in position of 1.50x0.45m size ventilators having three frames. The first frame of 35x35x3mm M.S. angle welded with two numbers of 12mm dia plain mild steel rods horizontally and second frame made of 30x3mm flats made of 1.50x0.45m size with numbers and 14/16 guage of 20mm size iron diamond mesh fixed in second frame, drilling holes with suiatable dia to 1st frame and second frame to be tightetened with 20x6mm size zink bolts (8Nos) third frame made of two frames of 0.9x0.3m size with 25x25x3mm MS L angle and joining two frames and fixing of glasses to two frames.

108

5257

567812.16

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing and fixing MS Glazed Window type Air Inlet of 0.75x0.75m size fitted with MS grill with daimond mesh, The window outer frame made with HR steel section F3 44x25x3mm, vertical member with HR steel section T2 25x22x3mm, shutter frame made with HR steel section F2 32x25x3mm and fitted with pinheaded glass of 4mm thick. The grill frame made with ISA 35x35x3mm welded with 12mm dia plain MS rods at 75mm c/c both the ways (9 Nos on each side) fitted with daimond mesh using MS flats and self driven screws including all accessories such as hold fasts, tower bolts, wind appliances putty packing to glasses 4 pieces including cost of all materials, fabrication charges, transportation charges and installation charges for finished item of the work etc, complete as per approved drawing.

84

5359

450222.36

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Cutting joints 3mm wide in the Concrete flooring by sawing in 2mx2m panels and filling the joints with silcone sealant, including hire and operational charges of machinery, labour charges, cost od sealant, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

4599.34

74

343248.74

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Vaccum drying of freshly laid cement concrete flooring using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vacuum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical travelling, finishing with sound edges and corners as directed by Engineer-in-charge of the work, including hire and operational charges of machinery, labour charges, fuel charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

6518.98

85

555482.29

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Granolithic Flooring with Cement concrete (1:1:2) prop. 50mm thick using using 20mm nominal graded size crushed metal as Coarse aggregate, River Sand as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete

6517.28

359

2341137.32

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Supply and laying of Polythene sheet 180 micron thick sandwiched in between the PCC sub base layers necessary overlap of 150 mm at joints; and ends properly anchored in suitable grooves left in walls for water tightnessincluding cost and conveyance of sheet and labour charges, overhead charges and contractor profit but excluding GST etc., complete

6780.3

28

191407.87

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing PCC (1:4:8) prop., using 43/53 Ordinary portland Cement, Crushed metal 40mm nominal graded size as Coarse aggregate of and Blended sand (50% Rver sand and 50% Rock sand) as Fine aggregate, machine mixing including cost & conveyance of material and labour charges, overhead charges and contractor profit but excluding GST etc., complete for Sub Base

656.04

5530

3628124.25

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Flooring: Filling Plinth / Basement with Rock sand for filling in layers not exceeding 150mm thick, watering and compacting each deposited layer by Mini Roller Compactor 1.5 - 2.0MT cap. including cost and conveyance of sand for filling and water to work site and all operational, incidental, machinery hire charges, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

1217.6

1940

2362752.8

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plastering Single coat 12mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete. 5.50 to 9.83m height above plinth

730.32

204

149452.68

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plastering Single coat 12mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete. 3.66 to 5.50m height above plinth

1567.16

187

294202.95

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plastering Single coat 12mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete. Upto 3.66m height above plinth level

2618.38

180

473193.63

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plastering Single coat 20mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. 5.50 to 9.83m height above plinth

254

308

78475.84

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plastering Single coat 20mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. 3.66 to 5.50m height above plinth

746.98

283

212015.33

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plastering Single coat 20mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Upto 3.66m height above plinth level

1972.7

271

535962.86

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Raised plain cement mortar band of 50mm width x 20 mm thick in cement mortar 1 : 4 (1 cement : 4 sand) including cost and conveyance of all materils and labour charges, overhead charges and contracot profit but excluding GST and Seigniorage charges etc., complete 3.66 to 5.50m height above plinth

511.84

32

16762.76

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plastering Single coat 12mm thick, CM (1:4) prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete to Exterior RCC members / Projections. 5.50 to 9.83m height above plinth

58.58

214

12587.08

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plastering Single coat 12mm thick, CM (1:4) prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete to Exterior RCC members / Projections. 3.66 to 5.50m height above plinth

765.68

196

150387.21

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plastering Single coat 12mm thick, CM (1:4) prop., with sponze finishing including cost and conveyance of all meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete to Exterior RCC members / Projections. Upto 3.66m height above plinth

1218.62

190

232695.49

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement - 15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges, curing charges, over head charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others. 5.50 to 9.83m height above plinth

68.82

9418

648148.14

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement - 15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges, curing charges, over head charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others. 3.66 to 5.05m height above plinth

257.14

8360

2149937.25

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement - 15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges, curing charges, over head charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others. Upto 3.66m height above plinth

473.02

7774

3677692.66

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing PCC (1:2:4) using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bed blocks

15.48

5914

91559.4

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing impervious coat to exposed RCC roof slab surface with CM (1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green, mixing mortar, laying, rendering smoot, rounding off junctions of wall and slab and curing including cost of all materials, labour charges, overhead charges, contractor profit but excluding GST etc., complete for finished item of the work for Gutter at 5.05m level

508.16

583

296475.79

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

90

74245

6682061.7

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete For Gutter slab 150mm thick between 3.66 and 7.32m level

423.1

2301

973561.56

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete For Tie beams above 7.75m Level

10.16

14355

145848.93

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete For Roof beams at between 3.66m and 7.32m Level

101.2

13850

1401647.32

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete For Tie beams at 2.44m level

71.34

13344

951975.23

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete For Lintels

11.54

14463

166903.48

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete For Plinth beams, Coping

117.22

14018

1643227.47

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete For Columns 5.50m to 9.85m level

13.44

15717

211242.53

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete For Columns 2.89m to 5.50m level

49.2

14981

737073.56

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete For Columns below Plinth and upto 2.89m above plinth level

79.48

14246

1132275.26

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing VRCC M25 using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete For Footings

220.04

11045

2430344

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Filling the plinth with useful selected earth in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

10023.5

411

4121262.26

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

1208.35

191

231060.69

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Basement

246.94

5820

1437272.29

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Foundation

184.22

5502

1013736.87

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

196

5346

1047870.88

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m and back filling including shoring, sheeting, planking, strutting and all operational, incidental, labour charges excluding GST etc., complete excluding dewatering in HR - upto 3 m depth for Pits and Trenches

897.4

741

665646.45

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by mechanical means - upto 3 m depth

897.4

84

75525.18

... More
Construction of 10,000 M.T. Capacity Godowns at TGSWC Gunjapadugu;CONSTRUCTION OF 10,000 M.T. (2x5000) CAPACITY GODOWNS EXCLUDING ROOFING WITH ANCILLARY UNITS AT TGSWC GUNJAPADUGU (V), MANTHANI (M), PEDDAPALLY DISTRICT: Clearing and grubbing Godown site by mechanical means including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness including machinary hire charges, overhead and contractor profit but excluding GST.

40470

2

102389.1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.