State Warehousing Corporation Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

State Warehousing Corporation Tender

Building Construction
Construction Works
Opening Date4 Jun 2021
Closing Date18 Jun 2021
Tender Amount₹ 14,06,98,734 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Nipple GI 25mm dia, Medium class

1

-

20.45

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Bends GI 25mm dia, Heavy class

1

-

56.81

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Stainless steel serrated - screwed connector NB25 x 300mm length

2

-

454.46

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;HDPE pipe confirming to IS:4984-1995, PE100 PN10 DN32

150

-

6135

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Submersible cable PVC sheathed, PVC insulated, flexible, flat , 3-core 2.5sq.mm

64

-

7635.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Cable PVC insulated 7/20

98

-

1892.38

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply, delivery of the following accessries suitable to single phase motor pump set: DOL starter suitable to single phase motor pump set up to 3.00HP

1

-

1022.54

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and transportation of 2.00 HP 25 stage Single phase ISI Submersible motor pump set suitable for 4" bore well of make CRI/ KSB/ Texmo etc.,complete including cost and conveyance of all materials

1

-

27835.68

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and delivery of UPVC pipe 180mm DN, class '3' ( 6kg/cm2 WP) including cost & conveyance and all taxes

49

-

35462.77

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Borewell with pumpset for water supply: Drilling of 165mm dia Bore well in all types of stratae using DTH ring, drilling over burdan of 180mm dia and insertion of PVC casing pipe with coupling and flushing, up to depth as directed by the officer in charge of work including tranportation of rig support vehicle, conductiong yield test, crew charges, incidental charges, over head charges and contractor profit buu excluding GST but excluding cost of casing pipe etc., complete

152

-

46627.52

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars etc., complete as per APSS No.126

0.5

-

39180.39

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Columns

1.22

-

14618.75

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Footings

0.66

-

6152.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply, delivery and fixing of MS gate using MS squire pipes as per approved design and specification and design including cost of materials, fabrication, transportation and labour charges for fixing etc., complete

500

-

55670

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Colour washing two coats with cement based paint of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

6174

-

338520.42

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Plastering 20mm thick to RR masonry in single coat with cement mortar (1:6) Prop. with sponge finishing including cost and conveyance of materials to site of work, curing including all water leads machine mixing etc., complete for finished item of work.

2940

-

749494.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Plastering 12mm thick single coat with cement mortar (1:6) Prop. with sponge finishing including cost and conveyance of all materials, labour charges, curing including water leads, mixing of mortar etc., complete for finished item of work.

3234

-

543991.14

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of fencing posts over compound wall using MS ISA 35x35x5 mm and length of 1.00 M including cutting, bending, welding hooks for fixing of barbed wire etc., complete for finished item of work.

1247.66

-

121908.86

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supplying and fixing galvanised steel barbed wire (IS : 278-1962 Type I) weighing 9.38 Kg per 100 metres (min.), Straining and fixing to any type of standard, rails, straining bolts, including securing with and provision of galvanised mild steel wire, stapples or steel pins, etc., as directed by Officer in charge including cost and conveyance of all materials and labour charges , overhaed charges, contractor profit but excluding GST etc., complete

2990

-

59052.5

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing PCC M20 grade using 43 grade Cement or any other type, Coarse aggregate of 20mm nominal graded size and Fine aggregate, manual mixing including cost & conveyance of material and labour charges etc., complete for Bed blocks/Coping

14.28

-

86044

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Masonry work in cement mortar (1:6) Prop. with fly ash cement solid blocks of size 290x225x140mm for manufacturing of fly ash solid blocks using fly ash 80kgs, cement of 15 kgs gypsum of 5 kgs and stone dust including cost and conveyance of all materials, Labour Charges, water leads, curing, scaffolding charges, lift charges, machine mixing charge etc., complete with compressive strength not less than 50kgs for 225mm thick walls for superstructure.

352.23

-

2018869.65

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing RRM in CM (1:6) prop., using Hard Granite stone including cost & conveyance all materials, labour charges, over head charges and contractor profit etc., complete but excluding GST and Seigniorage charges

799.7

-

2932923.74

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

89.88

-

384600.12

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Construction of Compound Wall at TSWC Allapur:- Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

477.75

-

160777.21

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing independent earthing by excavating a pit to a depth of 2.1m in all soils, as per size specified, using GI pipe 40mm dia medium class of 2.5m length duly providing staggered holes and with necessary accessories and with hume pipe ring including filling with equal proportion of Salt and Charcoal in layers including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

-

5261.51

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & Fixing of 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete

10

-

2897.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and laying of 6 sqmm 2 core XLPE insulated, 1100V grade armoured aluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/Finolex/ Havels/V-Guard or equivalant including cost of all cable, labour charges, overhead charges and contractor profit but excluding GST etc., complete.

100

-

38900

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of 48" (1200mm) Sweep Ceiling Fan without Regulator with 5 Star rating of makes Crompton / Bajaj / Orient /Usha including transportation and labour charges for Fixing of Ceiling fan and regulator and giving connections with twin core wire etc., complete.

1

-

2040.41

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of 20W LED Street light luminair, body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 l with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., with BIS certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

2

-

6047.72

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with single side connection with BIS Certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

3

-

1816.71

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

-

5016.1

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of 6A/16A 3/2 pin modular socket with 16A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

4

-

1215.04

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, Batten/Angular holder including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., for Light points in Residential buildings

2

-

1099.8

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, ceiling rose including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete for Tube Light, Fan points in Residential buildings

4

-

2204.12

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 6 Module box

1

-

161.06

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

2

-

415.86

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 12 Module box

2

-

514.38

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and run of 1x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Earth continuity including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complette

15

-

308.7

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and run of 2x4.0 sq.mm (56/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete

30

-

3238.8

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and run of 2x2.50 sq.mm (36/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. For Circuits from DB to power points

30

-

2133

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 6 Module box

1

-

154.52

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

2

-

399.92

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 12 Module box

2

-

484

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of 25mm dia 1.80mm thick PVC pipe (ISI mark) concealed in wall with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

26.9

-

3566.13

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;ELECTRIFICATION TO WEIGHBRIDGE AND CABIN ROOM AT TSWC ALLAPUR:- Supply and Fixing of 25mm dia 2.2mm thick P.V.C. pipe (ISI mark) concealed in roof slabs with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

16.2

-

1260.36

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of 110mm dia PVC rain water pipe including cost of material, labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete

1

-

544.22

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new wood work with 2 coats of synthetic enamel paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of dead mortar, including cost and conveyance of all materials to work site and all operational, incidental, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

16.34

-

2873.55

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new walls with 2 coats of Acrylic exterior emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for external walls

79.65

-

11092.06

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

68.03

-

6081.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new walls with 1 coat of Cement primer exterior Gr.2 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

79.65

-

4877.77

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new walls with 1 coat of Cement primer Interior Gr.1 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

68.03

-

3849.14

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Granolithic Flooring with Cement concrete (1:1:2) prop. 50mm thick using using 20mm nominal graded size crushed metal as Coarse aggregate, River Sand as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete

15.84

-

5530.38

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

1.58

-

6760.88

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Wooden Door with Flush shutter, of size 1050x2100mm, Frame made up of Medium Teak wood, of section size 100x65mm with MS hold fasts - 6 Nos and WPC flush shutter 950x2000mm size, 30mm thick one 1 No made with water resistant hard wood fibre HDF/MDF fibre board skins of 2.5mm thick, with MSS fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 150mm - 2 Nos, Aldrop 300mm - 1 No, as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete.

1

-

9785.39

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Two coats 20mm thick, base coat 16mm thick in CM (1:6) prop., and finished coat 4mm in CM (1:4) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to Exterior walls

79.65

-

35050.78

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Two coats 12mm thick, base coat 8mm thick in CM (1:5) prop., and finished coat 4mm in CM (1:3) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to Internal walls

46.41

-

19234.62

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Plastering 12mm thick single coat with cement mortar (1:4) Prop. to RCC works with sponge finishing including cost and conveyance of all materials, labour charges, curing including water leads machine mixing etc., complete for finished item of work.

21.62

-

3884.47

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement -15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges,curing charges,over head charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others. Above basement

11.39

-

70885.89

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing PCC (1:2:4) or M15 Grade concrete using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bed blocks

0.1

-

602.55

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

1

-

78360.78

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Sun shades 0.60 Mt wide

2.16

-

2468.17

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Lintels

0.15

-

1815.96

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Roof Slab 115mm thick

25

-

35004.25

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Roof Beams

3

-

37902.78

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Plinth Beam of 0.23M x 0.30 M size

3

-

35047.29

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Columns of 0.23M x 0.30 M size

2.31

-

27679.76

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Footings for columns

2.02

-

18829.45

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing RRM in CM (1:6) prop., using Hard Granite stone including cost & conveyance all materials, labour charges, over head charges and contractor profit etc., complete but excluding GST and Seigniorage charges

10

-

36675.3

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

15

-

409.5

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

4

-

17116.16

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Construction of Cabin Room at TSWC Allapur:- Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

15

-

5047.95

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of Copper plate of size 20x2mm as directed by the officer incharge of workincluding cost and conveyance of material , labour charges, overhead charges and contractor profit but excluding GST etc., complete .

20

-

15785.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of MS flat of size 50x10mm of 1.20m length including cost and conveyance steel, welding charges etc., complete and as directed by the officer incharge of work.

12

-

5487.36

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of ISA 65x65x6mm size for Kerb protection, as directed by the Officer in charge including cost of steel , fabriaction charges, labour charges for fixing over head charges and contractor profit but excluding GST etc., complete

18.6

-

13418.23

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Single coat 12mm thick, CM (1:4) prop., with sponze finishing including cost and conveyance of all Meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete

60

-

10780.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing PCC (1:2:4) or M15 Grade concrete using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bed blocks

20

-

120509.8

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

1

-

78360.78

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Beams

7.67

-

93983.35

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Columns

6.9

-

82679.8

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Footings for columns

8.1

-

75504.23

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

21.37

-

91443.08

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Weighbridge foundation at TSWC Allapur: Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

40

-

13461.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Construction of Hard Shoulders with naturally occuring gravel, spreading in uniform layers with motor grader on prepared surface, and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MoRD. including cost & conveyance of mateial, machinery charges, labour charges, overhead charges & contractor profit and seigniorage charges but excluding GST

58.1

-

35763.46

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing, laying, spreading and compacting stone aggregates of 40 mm Single nominal size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 kN in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 MORD.

785.09

-

1802912.08

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing, laying, spreading and compacting stone aggregates of 63 mm nominal single size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller/ Vibratory Roller 80-100 kN in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 MORD including cost & conveyance of mateial, machinery charges, labour charges, overhead charges & contractor profit and seigniorage charges but excluding GST

785.09

-

1627530.82

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Construction of Granular sub-base course with naturallay occuring gravel, spreading in uniform layers with motor grader on prepared surface, and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MoRD. including cost & conveyance of mateial, machinery charges, labour charges, overhead charges & contractor profit and seigniorage charges but excluding GST

1590.18

-

978835.3

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;INTERNAL ROADS AT TSWC ALLAPUR: Construction and widening of Embankment with earth obtained from borrow pits by mechanical means with leads and lifts including pre watering of soil, removal of top soil, excavation of soils, depositing the soils on embankment, breaking clods, Spreading, sectioning, grading and compacting with vibratory roller to max dry density as per Clause 301.5 of MoRD Specifications of Rural Roads including machinery hire charges, labour charges, overhead charges & contractor profit and seigniorage charges but excluding GST

3145.74

-

640346.83

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Construction of Seepage pit 1.2m dia x 1.5m depth with lining with RCC rings with open joints, provided with RCC cover at top and inlet arrangement including earthwork excavation cost and conveyance of all materials required to the work, labour charges , overhead charges and contractor profit but excluding GST etc.,complete. as per approved design and drawing

1

-

5170.15

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Construction of Septic tank of internal size 2.00 x 0.9x1.70m with walls 230mm thick built out in Fly ash bricks in CM (1:6), over Flooring 300mm thick in PCC 1:3:6 prop., plastered in CM 1:4 prop., inside walls and flooring and covered with RCC slab with acces opening of 455 x 610mm fitted with RCC cover and with inlet and out let arrangements including earthwork excavation cost and conveyance of all materials required to the work, labour charges , overhead charges and contractor profit but excluding GST etc.,complete. as per approved design and drawing

1

-

34462.47

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Constructing Inspection chamber 457.2 mm x 457.2 mm size up to 914.4 mm in Brick masonry CM 1:6 prop., and fitted with light weight 457.2 mm x 457.2 mm C.I frame and cover including cost & conveyance of all materials, labour chrges, over head charges and contractor profit but excluding GST etc., complete

2

-

8825.62

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Laying, fixing and commissioning of PVC/SWR pipes including couplers/ bends/ tees etc any diaMeter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice

10

-

943

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Nahany trap with jali 75 mm dia

2

-

197.7

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Single Tee with door 75 mm dia

1

-

81.8

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Single 'Y' with Door 75 mm dia

2

-

213.6

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Vent Cowl 110 mm dia

1

-

21.59

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Single 'Y' with Door 110 mm dia

1

-

193.15

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Single Tee with door 110 mm dia

1

-

146.56

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Door Bend 110 mm dia - 87.5 Degree

2

-

243.14

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Plain Bend 110 mm dia - 87.5 Degree

2

-

188.6

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR pipe 75 mm dia - Type- A Double socket 0.91m length

3

-

446.52

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR pipe 75 mm dia - Type- A Single socket 3m length

3

-

858.93

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR pipe 110 mm dia - Type- A Double socket 0.91m length

3

-

712.38

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of PVC/SWR Pipes and fittings including cost and conveyance of materials etc., complete including over heads & contractors profit but excluding GST. SWR pipe 110 mm dia - Type- A Single socket 3m length

4

-

2176.88

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of Orissa Pan white glazed WC 1st quality ISI marked with "P" or "S" trap, 630mm x 450mm size of Parry company make including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

2

-

3119.86

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of CP Long body Bib cock fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/ Senior/ Nice or equivalent including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

8

-

6416.96

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of CPVC pipes and fittings of 15.90mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

20

-

2954

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of CPVC pipes and fittings of 28.60mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

50

-

11191

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete

1000

-

7950

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Dadoing to internal walls to 2100mm height with Glazed ceramic tiles 7.30 mm thick , set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including including cost & conveyance of all materials , labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

18

-

10118.52

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including cost & conveyance of all materials , labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

4

-

3176.04

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Roofing with pre painted trapezoidal profile Galvalume sheet of IS:15965/YS550/AZ150/Class3, 0.5mm thick, 1020mm width, provided with anti capillary grove including sheet fixing with Hilt/Corroshield self drilling screws with neoprene washer and side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape, and fixing of sky light of 2mm thick polycorbonate sheet of size 1.30x1.00m including cost and conveyance of all material, labour charges etc., complete

144

-

80334.72

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Steel work in built up tubular Posts, Rafters and Purlins including cutting hoisting fixing in position and applyng a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. This includes the cost of trusses, rafter purlins, sleeves false rafter base plates lacing and bracing MS bolts and nuts and base plate on top of column as per relevant approved drawings and direction of Engineer-in-charge (There is no trusses over Gable walls and partition walls). The work including cost of material shall be executed as per approved drawings. The trusses shall be fabricated by the contractor at his own cost exactly as per approved drawings

1617

-

213104.43

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting two coats with synthetic enamel paint second grade of Asian / Nerolac / Berger etc., over a coat of wood primer including cost of primer and conveyance of all materials, labour charges etc., complete

19

-

3341.34

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Colour washing two coats with cement based paint of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

350

-

19190.5

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Wooden Door with Flush shutter, of size 750x2050mm, Frame made up of Medium Teak wood, of section size 100x65mm with MS hold fasts - 6 Nos and WPC flush shutter of 2.5mm thick 700x1900mm size, 25mm thick covered with acrylic sheet - 1 No , with Mild steel fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 125mm - 2 Nos, Aldrop 200mm - 1 No as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete

2

-

15921.14

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Single coat 12mm thick, CM (1:4) prop., with sponze finishing including cost and conveyance of all Meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete

200

-

35934

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Single coat 12mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all Meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete

350

-

58873.5

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Masonry work in cement mortar (1:6) Prop. with fly ash cement solid blocks of size 290x225x140mm for manufacturing of fly ash solid blocks using fly ash 80kgs, cement of 15 kgs gypsum of 5 kgs and stone dust including cost and conveyance of all materials, Labour Charges, water leads, curing, scaffolding charges, lift charges, machine mixing charge etc., complete with compressive strength not less than 50kgs for 225mm thick walls for superstructure.

51.64

-

295983.96

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Plain Cement Concrete (1:2:4) Prop. Using 20mm size ISI gauge hard broken granite machine crushed metal including cost and conveyance of all materials to site of work and labour charges, centering, machine mixing, laying, curing and all other incidental and operational charges

14.99

-

90322.1

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green, mixing mortar, laying, rendering smoot, rounding off junctions of wall and slab and curing including cost of all materials, labour charges, overhead charges, contractor profit but excluding GST etc., complete for finished item of the work for Gutter at 5.05m level

11

-

5443.46

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

1

-

78360.78

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing RCC (1:11/2:2) prop., nominal mix using 43 grade Cement, Crushed metal of 20mm nominal graded size as Coarse aggregate and 50% River sand, 50% stone crushed sand as Fine aggregate including cost & conveyance of all materials, hire charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machine mixing charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members. Roof Slab 115mm thick and impervious coat 20mm thick Slab

11

-

15401.87

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing RCC (1:11/2:2) prop., nominal mix using 43 grade Cement, Crushed metal of 20mm nominal graded size as Coarse aggregate and 50% River sand, 50% stone crushed sand as Fine aggregate including cost & conveyance of all materials, hire charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machine mixing charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members. Lintels and lofts over openings

0.5

-

6053.21

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing RCC (1:11/2:2) prop., nominal mix using 43 grade Cement, Crushed metal of 20mm nominal graded size as Coarse aggregate and 50% River sand, 50% stone crushed sand as Fine aggregate including cost & conveyance of all materials, hire charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machine mixing charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members. Columns

3

-

35947.74

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing RCC (1:11/2:2) prop., nominal mix using 43 grade Cement, Crushed metal of 20mm nominal graded size as Coarse aggregate and 50% River sand, 50% stone crushed sand as Fine aggregate including cost & conveyance of all materials, hire charges for centering and scaffolding using casuarinas ballies, wooden reapers, runners, wood posts and wall plates, machine mixing charges and labour charges etc.,complete including over head charges and contractor profit but excluding GST and Seigniorage charges for Structural members. Footings for columns

4.75

-

44277.17

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

140.01

-

3822.27

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

34.99

-

149723.61

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Construction of Hamalies Parking shed at TSWC Allapur: Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

50.01

-

16829.87

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing independent earthing by excavating a pit to a depth of 2.1m in all soils, as per size specified, using GI pipe 40mm dia medium class of 2.5m length duly providing staggered holes and with necessary accessories and with hume pipe ring including filling with equal proportion of Salt and Charcoal in layers including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

-

5261.51

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & Fixing of 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete

10

-

2897.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and laying of 6 sqmm 2 core XLPE insulated, 1100V grade armoured aluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/Finolex/ Havels/V-Guard or equivalant including cost of all cable, labour charges, overhead charges and contractor profit but excluding GST etc., complete.

50

-

19450

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of 48" (1200mm) Sweep Ceiling Fan without Regulator with 5 Star rating of makes Crompton / Bajaj / Orient /Usha including transportation and labour charges for Fixing of Ceiling fan and regulator and giving connections with twin core wire etc., complete.

6

-

12242.46

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of 20W LED Street light luminair, body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 l with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., with BIS certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

4

-

12095.44

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with single side connection with BIS Certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

12

-

7266.84

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

1

-

5016.1

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of 20A pin modular socket with 20A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

3

-

1173.72

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of 6A/16A 3/2 pin modular socket with 16A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

18

-

5467.68

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, Batten/Angular holder including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., for Light points in Residential buildings

4

-

2199.6

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, ceiling rose including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete for Tube Light, Fan points in Residential buildings

18

-

9918.54

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 6 Module box

3

-

483.18

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

6

-

1247.58

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 12 Module box

10

-

2571.9

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and run of 1x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Earth continuity including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complette

150

-

3087

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and run of 2x4.0 sq.mm (56/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete

90

-

9716.4

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and run of 2x2.50 sq.mm (36/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. For Circuits from DB to power points

250

-

17775

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 6 Module box

3

-

463.56

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 8 Module box

6

-

1199.76

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 12 Module box

10

-

2420

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of 25mm dia 1.80mm thick PVC pipe (ISI mark) concealed in wall with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

141.79

-

18797.1

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;ELECTRIFICATION TO OFFICE BUILDING AT TSWC ALLAPUR:- Supply and Fixing of 25mm dia 2.2mm thick P.V.C. pipe (ISI mark) concealed in roof slabs with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

61.46

-

4781.59

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Construction of Seepage pit 1.2m dia x 1.5m depth with lining with RCC rings with open joints, provided with RCC cover at top and inlet arrangement including earthwork excavation cost and conveyance of all materials required to the work, labour charges , overhead charges and contractor profit but excluding GST etc.,complete. as per approved design and drawing

1

-

5170.15

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Construction of Septic tank of internal size 2.00 x 0.9x1.70m with walls 230mm thick built out in Fly ash bricks in CM (1:6), over Flooring 300mm thick in PCC 1:3:6 prop., plastered in CM 1:4 prop., inside walls and flooring and covered with RCC slab with acces opening of 455 x 610mm fitted with RCC cover and with inlet and out let arrangements including earthwork excavation cost and conveyance of all materials required to the work, labour charges , overhead charges and contractor profit but excluding GST etc.,complete. as per approved design and drawing

1

-

34462.47

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Constructing Inspection chamber 457.2 mm x 457.2 mm size up to 914.4 mm in Brick masonry CM 1:6 prop., and fitted with light weight 457.2 mm x 457.2 mm C.I frame and cover including cost & conveyance of all materials, labour chrges, over head charges and contractor profit but excluding GST etc., complete

3

-

13238.43

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Laying, fixing and commissioning of PVC/SWR pipes including couplers/ bends/ tees etc any diaMeter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice

15

-

1414.5

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Nahany trap with jali 75 mm dia

3

-

296.55

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Single Tee with door 75 mm dia

2

-

163.6

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Single 'Y' with Door 75 mm dia

2

-

213.6

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Vent Cowl 110 mm dia

2

-

43.18

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Single 'Y' with Door 110 mm dia

3

-

579.45

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Single Tee with door 110 mm dia

3

-

439.68

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Door Bend 110 mm dia - 87.5 Degree

3

-

364.71

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR Plain Bend 110 mm dia - 87.5 Degree

3

-

282.9

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR pipe 75 mm dia - Type- A Double socket 0.91m length

5

-

744.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR pipe 75 mm dia - Type- A Single socket 3m length

5

-

1431.55

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;SWR pipe 110 mm dia - Type- A Double socket 0.91m length

4

-

949.84

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of PVC/SWR Pipes and fittings including cost and conveyance of materials etc., complete including over heads & contractors profit but excluding GST. SWR pipe 110 mm dia - Type- A Single socket 3m length

6

-

3265.32

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supplying & Fixing white glazed flat back half stall urinals 1st quality conforming to IS:2556-1995 with standard C.P. Spreader of overall size 95 x 95 x 57 mm conforming to IS:2556-Part6, Sec-6-1974 fixed with screws complete Indian make (HSW/Parry/Neycer) : 590 x 375 x 390 mm including cost and conveyance of all materials and labour charges etc., complete including Overheads & Contractors Profit but excluding GST

2

-

5226.3

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supplying & Fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with 19.05mm 400gms NP stop cock Indian make with ISI mark Seiko/Senior/Nice or equivalent parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 630 x 450 mm - Single C.P. Pillar cock including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

3

-

6752.13

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;S&F of European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 floor mounted close coulpled dual flush porcelainn cistern fixed on wash down white glazed with 'S' trap of Hindustan / Neycer or Parryware make including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

1

-

17203.58

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of Orissa Pan white glazed WC 1st quality ISI marked with "P" or "S" trap, 630mm x 450mm size white glazed of Parry company make including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

1

-

1559.93

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of CP Long body Bib cock fancy type deluxe 400 grams 12.7 mm dia Indian make Seiko/ Senior/ Nice or equivalent including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

5

-

4010.6

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of CPVC pipes and fittings of 15.90mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

30

-

4431

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of CPVC pipes and fittings of 28.60mm OD pipes-SDR 13.5 to meet the requirement of ASTM-D 2846 and are produces in CTS (copper tube sizes 1/2" to 2" SDR 11 mand 13.5 pipes are made from identical CPVC compounds having the same phicical properties for hot and cold water (IS15778-2007) with CPVC fittings including including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., completete

100

-

22382

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks including cost of material, labour charges, overhead charges and contractor profit but excluding GST etc., complete

1000

-

7950

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new wood work with 2 coats of synthetic enamel paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of dead mortar, including cost and conveyance of all materials to work site and all operational, incidental, labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

39.38

-

6925.37

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new walls with 2 coats of Acrylic exterior emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for external walls

171.36

-

23863.59

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

472.19

-

42209.06

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new walls with 1 coat of Cement primer exterior Gr.2 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

171.36

-

10494.09

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new walls with 1 coat of Cement primer Interior Gr.1 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for internal walls

472.19

-

26716.51

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing and applying Cement based putty of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges including overhead charges & Contractors profit etc., complete but excluding GST and seigorage charges for finished item of work for Internal walls.

291.81

-

58111.04

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Flooring with Rough Tandur 18mm thick stones, set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly including cost and conveyance of all materials , labour charges, overhead charges and contractor profit but excluding GST and seigniorage charges, etc., complete for finished item of work

76.83

-

37732.75

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Dadoing to internal walls to 2100mm height with Glazed ceramic tiles 7.30 mm thick, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete

29.49

-

16577.51

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

7.14

-

5669.23

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing skirting to internal walls to 15 cm height with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water and including cost and conveyance of all Meterials and labour charges, overhead charges & Contractors profit etc., complete but excluding GST and seigorage charges for finished item of work

10.4

-

15192.01

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand water and tiles, overhead charges & Contractors profit etc., complete but excluding GST and seigorage charges for finished item of work

96.53

-

142338.31

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Base course below Flooring

15.56

-

66581.86

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of MS Grills to Window, Ventilator as per APSS No.126 including cost of MS sections , rods and welding rods, power charges, including cost of material, fabrication charges, fixing charges, over head charges and contractor profit but excluding GST etc complete for finished item of work in all floors.

400

-

38176

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supplying and fixing of Unplasticised Poly Vinyl Chloride (UPVC) casement windows openable shutters duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 55 mm x 2.40 mm for outer frames, 74 mm x 60 mm x 2.40 mm for mullion sections for two or more openable shutters 75 mm x 60 mm x 2.40 mm foropenable shutter frame capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co- extruded with Grey colour soft PVC and accessories for casement window ? friction hinges of stainless steel grade 304/430- 2 Nos., per sash, handle with mazak alloy casting 1 No. per sash, multipoint locking system suitably concealed 1 No., per sash provided with raiser wedges for smooth operation and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

14.4

-

117174.38

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Wooden Door with Flush shutter, of size 750x2050mm, Frame made up of Medium Teak wood, of section size 100x65mm with MS hold fasts - 6 Nos and WPC flush shutter of 2.5mm thick 700x1900mm size, 25mm thick covered with acrylic sheet - 1 No , with Mild steel fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 125mm - 2 Nos, Aldrop 200mm - 1 No as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete. Door - 0.75 x 2.10m

2

-

15921.14

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Wooden Door with Flush shutter, of size 1050x2100mm, Frame made up of Medium Teak wood, of section size 100x65mm with MS hold fasts - 6 Nos and WPC flush shutter 950x2000mm size, 30mm thick one 1 No made with water resistant hard wood fibre HDF/MDF fibre board skins of 2.5mm thick, with MSS fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 150mm - 2 Nos, Aldrop 300mm - 1 No, as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete. Door - 1.05 x 2.10m

5

-

48926.95

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Wooden Door Fully Panelled of size 1500x2100mm, Frame made up of Medium Teak wood, of section size 100x75mm with MS hold fasts - 6 Nos and Panelled Shutter Two leaves 545x2000mm size, 32mm thick one 1 No made with Teak wood planks 30mm thick, with SS fittings: Hinges 150mm - 3 Nos, Tower bolts 200mm - 2 Nos, Handles 150mm - 2 Nos, Aldrop 300mm - 1 No, as per approved design and specifications including cost and conveyance of all materials, labour charges, all fittings and furniture etc., complete as per APSS 1 No.1002. Door - 1.20 x 2.10m

1

-

25588.02

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Two coats 20mm thick, base coat 16mm thick in CM (1:6) prop., and finished coat 4mm in CM (1:4) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to Exterior walls

171.36

-

75408.68

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Two coats 12mm thick, base coat 8mm thick in CM (1:5) prop., and finished coat 4mm in CM (1:3) prop., with sponge finishing including cost and conveyance of all materials and labour charges, over head charges and contractor profit but excluding GST to Internal walls

253.2

-

104938.74

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Plastering 12mm thick single coat with cement mortar (1:4) Prop. to RCC works with sponge finishing including cost and conveyance of all materials, labour charges, curing including water leads machine mixing etc., complete for finished item of work.

218.99

-

41772.34

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement -15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges,curing charges,over head charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others. Above basement

50.21

-

312482.94

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing PCC (1:2:4) or M15 Grade concrete using 20mm nominal graded size crushed metal as Courase aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bed blocks

0.9

-

5422.94

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green, mixing mortar, laying, rendering smoot, rounding off junctions of wall and slab and curing including cost of all materials, labour charges, overhead charges, contractor profit but excluding GST etc., complete for finished item of the work for Gutter at 5.05m level

155

-

76703.3

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

5

-

391803.9

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Waist Slab 150mm thick for stair case

8.8

-

14635.28

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Roof Slab 115mm thick and impervious coat 20mm thick in CM(1:3)

155

-

217026.35

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Sun shades 0.60 Mt wide 0.05m thick

24.17

-

27618.33

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Lintels

4.4

-

53268.25

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Roof Beam

4.99

-

61144.32

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Columns of 0.23M x 0.30 M size

5

-

59912.9

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Plinth Beam of 0.23M x 0.30 M size

6.01

-

70211.4

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Footings for columns

18.1

-

168719.33

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

112.56

-

3072.89

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing RRM in CM (1:6) prop., using Hard Granite stone including cost & conveyance all materials, labour charges, over head charges and contractor profit etc., complete but excluding GST and Seigniorage charges

68.03

-

249502.07

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

20

-

85580.8

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Construction of Office building at TSWC Allapur:- Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

75

-

25239.75

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Self supported arch shaped GALVALUME sheet roofing:-Providing Self supported arch shaped GALVALUME sheet roofing including fasteners, turbo ventilators, translucent sheets for sky lights, designed to withstand the Wind load (as per IS875 Part-3) & Earthquake load (as per IS1893) for effective span of 21.350m and central rise of 4.36m by Proplex roofing including cost and conveyance of sheets to site, machinery hire charge, fabrication charges, installation charges and labour charges, incidental charges etc., complete with following specifications, terms and conditions. Color coated Galvalume steel complying to ASTM A792, Base metal thickness 1.00mm (Tolerance as +/- 0.02mm), alloy coating AZ 150(Aluminum 55%, Zinc 43.4% and Silicon 1.6%), Yield strength: 350MPA as recommended in ASTM A792, Paint coating regular modified polyester, Top side Primer coat 25 Microns top coat 12 microns and Bottom side 25 Microns back coat 12 microns epoxy, top color: Combination of Blue and Off white and Bottom color grey using make of Thyssen Krupps, Germany/ Dongbu Steel Co. Limited, Korea/Corus Steels, U.K/ Union steel, Korea/Yieh phui Enterprises Ltd., Taiwan and Domestic market make of TATA Blue scope, Jindal Steel industries, Bhushan steels, JSW steel industry, Other Indian renowned steel industries etc. The Steel sheet shall be 3?-0? (914MM) width (Tolerance +/- 2.00 MM) which shall be curved and moulded at site using mechanical press and dies to the desired curves and shape to form 2?-0? (605MM) wide interlocking panels. These panels shall be erected in position and the joints are seamed. The installation should be done by mechanized methods. Vendor has to mobilize required number of Hydra for transportation of sheets and Cranes for the erection of Seamed Sheets and complete the entire work satisfactorily by using the fixtures like anchor fasteners, standard light hangers, turbo ventilators and sky lights etc., to have a combination of Turbo Ventilator (Aluminum) of Size 24 inches with Capacity of 2200 CFM, Skylight of 2mm Thick with Polycarbonate sheet of size 2FtX14Ft at 30? intervals and to be installed for each compartment etc., complete as per terms and conditions. The Specifications, design & drawings for the arch shaped roofing must be submitted to TSWC for approval before the installation of the sheets at site.

12615

-

19553250

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing independent earthing by excavating a pit to a depth of 2.1m in all soils, as per size specified, using GI pipe 40mm dia medium class of 2.5m length duly providing staggered holes and with necessary accessories and with hume pipe ring including filling with equal proportion of Salt and Charcoal in layers including cost of material, labour charges, over head charges, contractor profit but excluding GST etc.,

4

-

21046.04

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & Fixing of 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete

80

-

23177.6

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and laying of of UG cable of 6 sq.mm 2 core XLPE insulated, 1100V grade armoured aluminium cable as per specification conforming to IS-7098 (part-I) of makes Polycab/Finolex/ Havels/V-Guard or equivalant including cost of all cable, labour charges, overhead charges and contractor profit but excluding GST etc., complete.

200

-

77800

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of 20W LED Street light luminair, body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover, Less Glare, IP 66 l with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., with BIS certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

16

-

48381.76

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with glass body, wide operating voltage with single side connection with BIS Certification with warranty of 50,000 burning hours of Phillips / Wipro/ Crompton/Havells or equivalent make including cost and conveyance of material and labour charges, overhead charges and contrcator profit but excluding GST etc., complete

240

-

145336.8

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

16

-

80257.6

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of 6A/16A 3/2 pin modular socket with 16A modular switch control on common board with earth connectivity including wire leads including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

96

-

29160.96

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, Batten/Angular holder including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., for Light points in Residential buildings

16

-

8798.4

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Wiring with 2x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe with 6A modular switch, ceiling rose including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete for Tube Light, Fan points in Residential buildings

240

-

132247.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 6 Module Box

24

-

3865.44

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Modular Base plate and Cover Frame of Crabtree / Feno Switch / Toyoma / Fortune Art / Million / Gold Medal / Vimal / Anchor Roma / Schneider Opale make for fixing switches , sockets and dimmers etc., including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete. 8 Module Box

48

-

9980.64

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and run of 1x1.0 sq.mm (14/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Earth continuity including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complette

2400

-

49392

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and run of 2x2.50 sq.mm (36/0.3mm) Fire Retardant PVC insulated flexible copper cable in the existing non metallic conduit pipe for Mains including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete

2400

-

170640

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 6 Module Box

24

-

3708.48

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of Hot dip galvanized metallic boxes modular size for switch boards including cost of box and labour charges for fixing, over head charges, contractor profit but excluding GST etc., complete. 8 Module Box

48

-

9598.08

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and Fixing of 25mm dia 1.5mm thick PVC pipe (ISI mark) in sheeting with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

440

-

26435.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;ELECTRIFICATION TO 10000 M.T. GODOWN AT TSWC ALLAPUR: Supply and fixing of 25mm dia 1.80mm thick PVC pipe (ISI mark) concealed in wall with all required accessories including cost of material, labour charges, over head charges, contractor profit but excluding GST etc., complete.

1740

-

230671.8

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing and fixing of typical Name Board of TSWC centre of size 2.40 x 1.20m with necessary Logo as per specifications and drawing, with Posts with MS ISA 50 x 50 x5mm , board with MS ISA 35 35x 3mm frame and with MS sheet of 1.6mm thick and posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground level including cost of steel fabrication, painting and lettering, overhead charges and contractors profit but excluding GSTetc., complete

4

-

48309.4

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting and Lettering in enamel paint for Godown numbering, Compartment numbering, Stack marking and numbering as directed by the Engineer in charge including cost of synthetic enamel paint and and painter charges, over head charges and contractor profit but excluding GST etc., complete

4

-

60216

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of Aluminum ladder of size 16 feet length while closing and 30 feet length while extended and made of Aluminum 'C' section of 3mm thich of all verticals and steps 1" dia 2mm aluminum tubes etc., complete with safety locks, rope, pulley, safety limit, rubber shoes, folding platforms, safety rings, hand rails fitted to extended section 2Nos 8" dia teflon wheels fixed for slding etc., complete.

4

-

122704

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply of Portable Fire extinguishers water type (gas catridge) of 9 Lit. capacity confirming to IS :940-2003 including cost and conveyance charges, over charges and contractor profit but excluding GST etc complete

8

-

16360

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new Iron work with Synthetic enamel paint of approved colour without priming coat including cost and conveyance of paint, brushes, labour charges, overhead charges and contractor profit but excluding GST etc complete for finished item of work

2168.76

-

231601.88

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new walls with 2 coats of Acrylic exterior emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per APSS No.911 for external walls

12538.52

-

1746114.3

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Painting to new walls with 1 coat of Cement primer exterior Gr.2 of approved brand thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental charges, labour charges, overhead charges and contractor profit etc. complete for finished item of work for exterior walls

12538.52

-

767858.96

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;White washing two coats to all the Interior wall surfaces cost and conveyance of all materials to site of work such as lime, gum, conge water and labour charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work for interior walls

10737.88

-

392469.51

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Constructing of Collection chamber 457.2 mm x 457.2 mm size up to 914.4 mm in Brick masonry CM (1:6) prop., and fitted with light weight 457.2 mm x 457.2 mm C.I frame and cover including cost & conveyance of all materials, labour chrges, over head charges and contractor profit but excluding GST etc., complete

72

-

317722.32

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Laying of PVC pipe line of 160mm dia for Rain water draiange in the Platform, connecting from collection chamber and letting out side including cost and conveyance of pipe, charges for fixing, overhead charges and contractor profit but excluding GST etc,. Complete

175.68

-

86227.26

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Rain water piping system for Roof drainage of length 6.0m length using PVC pipes 160mm dia with fittings Bell mounth at top, bends as required and shoe bend at bottom and fixing to wall with clamps by down taking from Gutter slab and connecting to chamber including cost and conveyance of pipe, fittings and all labour charges for fixing, overhead charges and contractor profit but excluding GST etc,. Complete.

72

-

291790.8

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing and fixing aluminium covering over expansion joint of approved pattern & design , made out of machine cut aluminium sheet 2.5mm thick and fixing using stainless steel dash fastners of 8 mm dia and 75 mm long bolt including providing aluminim-washers 2 mm thick 15 mm dia, on vertical surfaces, as per drawing and direction of Engineer inclufding cost and conveyance of all materials, labour charges, overhead charges and contractor profit but excluding GST etc., complete

88

-

35691.92

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing and fixing of Premoulded joint filler board 25mm thick in expansion joint for RCC columns including cost and conveyance of material, labour charges, over head charges and contractor profit but excluding GST etc., complete

74.4

-

32878.1

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Roofing with pre painted trapezoidal profile Galvalume sheet of IS:15965/YS550/AZ150/Class3, 0.5mm thick, 1020mm width, provided with anti capillary grove including sheet fixing with Hilt/Corroshield self drilling screws with neoprene washer and side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape, and fixing of sky light of 2mm thick polycorbonate sheet of size 1.30x1.00m including cost and conveyance of all material, labour charges etc., complete

3027.6

-

1689037.49

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Steel work in built up tubular Trusses, Purlins including cutting hoisting fixing in position and applyng a priming coat of approved steel primer, welded and bolted including special shaped washers etc. complete. This includes the cost of trusses, rafter purlins, sleeves false rafter base plates lacing and bracing MS bolts and nuts and base plate on top of column as per relevant approved drawings and direction of Engineer-in-charge (There is no trusses over Gable walls and partition walls). The work including cost of material shall be executed as per approved drawings. The trusses shall be fabricated by the contractor at his own cost exactly as per approved drawings

25296.32

-

3333802.01

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supplying & fixing collapsible steel shutters with vertical, double channel of 20 x10x2 mm of 100 mm centre ,Bracers with flat iron 40x40x6 mm with 38 mm dia steel pulleys, the top, bottom and side vertical frames of the collapsible gate with 65x65mmx8mm MS Angle and middle guide rail at site height with 65mmx8mm MS flat for the pulleys to guide and fixed with necessary hold fasts,bolts, nuts, rivets, locking arrangements, stoppers, handles, all accessories all fixtures and painted with one coat of approved steel primer etc., completeincluding cost and conveyance of all materials, labour charges, all fittings and furniture, overhead charges & Contractors profit but excluding GST etc., complete

285.76

-

1125294.3

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete as per approved drawing including cost and conveyance of all materials, labour charges, all fittings and furniture, overhead charges & Contractors profit but excluding GSTetc., complete

213.16

-

959524.82

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Manufacturing, supply and fixing in position of 1.50x0.45m size ventilators having three frames. The first frame of 35x35x3mm M.S. angle welded with two numbers of 12mm dia plain mild steel rods horizontally and second frame made of 30x3mm flats made of 1.50x0.45m size with numbers and 14/16 guage of 20mm size iron diamond mesh fixed in second frame, drilling holes with suiatable dia to 1st frame and second frame to be tightetened with 20x6mm size zink bolts (8Nos) third frame made of two frames of 0.9x0.3m size with 25x25x3mm MS L angle and joining two frames and fixing of glasses to two frames.

216

-

909969.12

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Provoiding and fixing MS Glazed Window type Air Inlet of 0.75x0.75m size fitted MS grill , The outer side frame of 35x35x3mm M.S. angle welded with 12mm dia plain mild steel rods at 75mm C/C both the ways (9 Nos. on each side) including all accessories such as hold fasts, tower bolts, wind appliances rubber packing to glasses 4 pieces etc., which will be kept by the side of first frame i.e. inside the godown including cost of all materials required for the work labour charges etc, complete as per drawing.

168

-

782286.96

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Cutting joints 3mm wide in the Concrete flooring by sawing in 2mx2m panels and filling the joints with silcone sealant, including hire and operational charges of machinery, labour charges, cost od sealant, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

11077.04

-

568473.69

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Vaccum drying of freshly laid cement concrete flooring using 100% air tight suction mat of suitable size and length, vaccum pump to maintain vacuum pressure 0.7-0.8 atmospheres as per the standard procedure floating with power floater, mechanical travelling, finishing with sound edges and corners as directed by Engineer-in-charge of the work , including hire and operational charges of machinery, labour charges, fuel charges, overhead charges and contractor profit but excluding GST etc., complete for finished item of work

12976.12

-

648676.24

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Granolithic Flooring with Cement concrete (1:1:2) prop. 50mm thick using using 20mm nominal graded size crushed metal as Coarse aggregate, River Sand as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete

12926.04

-

4512997.61

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Supply and laying of Polythene sheet 180micron thick sandwiched in between the PCC sub base layers necessary overlap of 150 mm at joints; and ends properly anchored in suitable grooves left in walls for water tightnessincluding cost and conveyance of sheet and labour charges, overhead charges and contractor profit but excluding GSTetc., complete

16749.56

-

413546.64

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing PCC (1:5:10) prop., using 43 grade Cement, Coarse aggregate of 40mm nominal single size and 50% River sand, 50% Stone crushed sand as Fine aggregate, machine mixing including cost & conveyance of material and labour charges but excluding GST etc., complete for Sub base below Flooring

2283.12

-

9769561.8

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Flooring: Filling with sand for filling in trenches, foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site and all operational, incidental, labour charges, overhead charges & Contractors profit etc., complete for finished item of work but excluding GST and seigniorage charges

2392.08

-

1929212.52

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Single coat 12mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all Meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete. Above 3.66m height above plinth level

5479.96

-

1099882.77

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Single coat 12mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all Meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete. Upto 3.66m height above plinth level

5257.92

-

942745.06

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Single coat 20mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all Meterials and labour charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Above 3.66m height above plinth level

2991.68

-

886644.2

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Single coat 20mm thick, CM (1:6) prop., with sponze finishing including cost and conveyance of all Meterials and labour charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. Upto 3.66m height above plinth level

5452.84

-

1450564.5

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Single coat 12mm thick, CM (1:4) prop., with sponze finishing including cost and conveyance of all Meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete to Exterior RCC members / Projections. Above 3.66m height above plinth

2166.96

-

459742.23

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plastering Single coat 12mm thick, CM (1:4) prop., with sponze finishing including cost and conveyance of all Meterials and labour charges, overhead charges, contractor profit, but excluding GST and Seigniorage charges etc., complete to Exterior RCC members / Projections. Upto 3.66m height above plinth

1927.04

-

367582.88

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement -15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges, curing charges, over head charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others. Above 3.66m height above plinth

921.92

-

6371435.22

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing brick work in CM (1:6) prop., using Fly ash Cement solid blocks, 290x225x140mm size manufactured from Cement -15kg, Fly ash - 80kg, Gypsum -5kg and Crushed stone dust including cost & conveyance of all material, labour charges, access scaffolding charges, machinery hire charges, curing charges, over head charges and all other incidental and operational charges, contractor profit but excluding GST and Seiniorage charges etc., complete for Super structure and others. Upto 3.66m height above plinth

836.16

-

5203858.48

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing PCC (1:2:4) or M15 Grade concrete using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing manually, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bed blocks

12.4

-

68799.04

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing impervious coat to exposed RCC roof slab surface with CM (1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green, mixing mortar, laying, rendering smoot, rounding off junctions of wall and slab and curing including cost of all materials, labour charges, overhead charges, contractor profit but excluding GST etc., complete for finished item of the work for Gutter at 5.05m level

1194.36

-

629284.4

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Steel reinforcement with TMT bars of Fe-500 grade including cost & conveyance steel bars, binding wire and labour charges for fabrication including cutting, bending, placing in position and tying of bars, overhead charges, contractor profit but excluding GST etc., complete

200

-

15672156

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing RCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Bond beams, Lintels and Coping

117.92

-

1377592.15

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Gutter slab 125mm thick between 3.66 and 7.32m level

807.36

-

1328914.56

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Tie beams above 7.32m Level

24

-

312336.48

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Roof beams at between 3.66 and 7.32m Level

220.01

-

2779625.64

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Tie beams at 2.44m level

136

-

1666458.32

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Lintels

16.68

-

201935.09

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Plinth beam

112.88

-

1318712.7

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Columns above 2.89m

191.88

-

2470180.61

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Columns below Plinth and upto 2.89m above plinth level

226.68

-

2716211.23

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing VRCC (1:11/2:3) prop., using 20mm nominal graded size crushed metal as Coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, vibrating and curing including cost and conveyance of all materials to site of work, centering charges, labour charges, machinery hire charges all other incidental and operational charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete. For Footings

452.88

-

4221525.45

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Filling the plinth with useful gravel in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

16764.88

-

7517539.84

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Filling with useful excavated soil (excluding rock) in trenches, sides of foundations with initial lead in layers not exceeding 150mm thick, compacting each deposited layer by watering and ramming including cost of water to work site, labour charges, overhead charges & contractors profit etc., complete for finished item of work but excluding GST

1133

-

30930.9

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Basement

559.44

-

2779488.13

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing & laying of PCC (1:3:6) prop. Nominal mix using 40 to 10mm size crushed metal as coarse aggregate, Mixture of Stone crushed sand (50%) and River Sand (50%) as Fine aggregate and 43 grade OPC, mixing mechanically, placing vibrating including cost & conveyance of all materials, form work charges and labour charges, overhead charges, contractor profit, seigniorage charges but excluding GST etc., complete, in Foundation

301.72

-

1443618.56

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Providing Plain cement concrete (1:5:10) prop. using 40 mm nominal single size metal as Coarse aggregate, Mixture of Stone crushed (50%) and River Sand (50%) as Fine aggregate, mixing mechanically, laying of concrete, compacting and curing including cost and conveyance of all materials to site of work, labour charges, machinery hire charges, overhead charges and contractor profit but excluding GST and Seigniorage charges etc., complete for Levelling course/Bedding

328

-

1403525.12

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m and back filling including shoring, sheeting, planking, strutting and all operational, incidental, labour charges excluding GST etc., complete excluding dewatering in HR - upto 3 m depth for Pits and Trenches

1081.96

-

650907.14

... More
Construction of 20,000 M.T. (4 X 5,000 M.T.) Capacity godowns at TSWC Allapur;CONSTRUCTION OF 10,000 M.T. CAPACITY GODOWN AT TSWC ALLAPUR: Earthwork in excavation for Foundation and depositing on bank with initial lift and an initial lead of 10m including shoring, sheeting, planking, strutting and all operational, incidental, labour charges by excluding GST etc., complete excluding dewatering in all types of Soil - by manual means - upto 3 m depth

1081.96

-

364112



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.