Sports Authority Of India Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Sports Authority Of India - SAI Tender

Works
Civil And Construction
Building Construction
Opening Date23 Dec 2023
Closing Date6 Jan 2024
Tender Amount₹ 1,26,567 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Conversion of existing 2nd wash room into antiroom;Supply and fixing of 6A 3pin modular plug socket with 6 A modular switch control on common switch board with earth continuity on including earth connection and all labour charges etc (2020-2021)

2

209

418.8

... More
Conversion of existing 2nd wash room into antiroom;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

6

705

4234.38

... More
Conversion of existing 2nd wash room into antiroom;Supply and laying of 19mm outer dia heavy grade with IS:9537 part 3 rigid PVC pipe. With all accessoriies, duly sealed at points and erected on walls /celing including cost of all materials and labour charges complete Makes : Sudhakar / Finolex / Modi / VIP /Precision / Universal / Million Plast / Gold / Polycab / DEC / Beljin / Champion / Austro

100

73

7397

... More
Conversion of existing 2nd wash room into antiroom;Painting to old wood works with 2 coats of approved synthetic enamel paint of grade-I to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for:-Painting to old wood work - Synthetic enamel paint to Wood Work - 2 coats

10

153

1537

... More
Conversion of existing 2nd wash room into antiroom;Painting to walls with 2 coats of plastic emulsion paint of approved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for:-Internal Colouring - Plastic emulsion paint - 2 Coats

50

162

8128.5

... More
Conversion of existing 2nd wash room into antiroom;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal walls

20

291

5822

... More
Conversion of existing 2nd wash room into antiroom;Flooring with Vitrified tiles of size:600X600 mm and thickness between 8-10 mm of Matt Finish with full body of 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as directed by the Engineer-In -Charge, laying tiles, fixing flooring with full depth jointing and pointing to the Vitrified Tile flooring in specified thick for tiles of any sizes with epoxy emulsion grout/ synthetic / resin adhesive in width of 3-5 mm ,and jointed neatly with pigment with three component of epoxy grout of matching shade to full depth including all incidental and operational,transportation , labour charges including all taxes Excluding GST & seigniorage charges, but including cost and conveyance of all materials all labour charges for complete for finished item of work. (APSS No.701 & 707)

15

1396

20946.6

... More
Conversion of existing 2nd wash room into antiroom;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth afterthoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2-3 hrs, sand with 180 and 320 no., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finish item of work for internal walls

90

275

24768

... More
Conversion of existing 2nd wash room into antiroom;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting Grooves as directed by Engineer - in - charge etc., complete for External & Uneven Surfaces of Brick Wall and RCC exposed surfaces for finished item of work. (SS 901,903 & 904) for:-Plastering 2/c in CM (1:4) & (1:6): 20 mm

50

646

32340

... More
Conversion of existing 2nd wash room into antiroom;Reinforced Brick Masonry for partition walls (115 mm thick) in CM (1:3) prop. (Cement:Sand) using Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm from approved source having minimum crushing strength of not less than 3.5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, on all materials, scaffolding charges and all labour charges like mixing cement mortar, lift charges, curing, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501) for:-Reinforced Brick Masonry in CM 1:6 (Country)

10

1105

11051.7

... More
Conversion of existing 2nd wash room into antiroom;Dismantling of tiles disposal of unserviceable materials within 100 mts and disposing as dirreted by the Engineer- In - Charge , including all incidental and operational charges, Transportation , all labour charges, overhead charges & contrctor profit , all taxes Except GST etc., complete as directed by Engineer In Charge for finished item of work for all floors and at all levels

30

23

715.8

... More
Conversion of existing 2nd wash room into antiroom;Dismantling & Demolition of Brick work ,including stacking of serviceable materials and disposal of unserviceable materials within 100 mts and disposing as dirreted by the Engineer- In - Charge , including all incidental and operational charges, Transportation , all labour charges, overhead charges & contrctor profit , all taxes Except GST etc., complete as directed by Engineer In Charge for finished item of work for all floors and at all levels.

5

355

1775



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.