South Central Railway Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

South Central Railway - SCR Tender

Works
Energy, Oil and Gas
Electrical and Electronics
Electrical Works
Ireps
Opening Date26 Dec 2024
Closing Date16 Jan 2025
Tender Amount₹ 3,11,87,811.36 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1(a)Preparation of Designs and drawings. 2

-

-

64503.05

... More
1(c)Preparation of Station Working Rules and Instructions

-

-

29474.01

... More
1(d)Supply and installation of SWR boards and Flexi Sheets (Fixed on Decolum Sheets) at nominated places including supply of power block caps. 4

-

-

23874

... More
3(a)Erection of Traction masts and main masts and LT supply Transformer station. 5

-

-

63638.05

... More
3(b)Erection of fabricated steel work such as TTC, Portals etc. 6

-

-

110443.2

... More
3(c)Erection of fabricated Small Part Steel work etc.

-

-

73628.8

... More
3(e)Supply and erection of Guy rod assembly.

-

-

207890.64

... More
4(a)(i)Supply and Erection of Single bracket assembly without insulator for conventional OHE. 9

-

-

1273688.28

... More
4(a)(ii)Extra on 4(a) (i) for supporting two OHEs.

-

-

13390.2

... More
4(b)(i)Supply without Insulator and erection of a pull off arrangement for Conventional type OHE. 11

-

-

9461.37

... More
6(a)Erection of regulated conventional OHE.

-

-

277698.74

... More
8(a) (v)Supply and erection of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE. 13

-

-

886718.42

... More
8(a) (xii)Marking of "Y" - Measurement at BWA locations.

-

-

2058.7

... More
8(b)(ii)Supply without Insulator & erection of materials for termination of Double Overhead equipment conductors (Regulated)

-

-

106107.82

... More
9(a)Supply with out insulator and erection of anti creep with galvanised steel wire for conventional OHE.

-

-

117657.3

... More
10(a) Extra on Item 6(a) for supply and erection of additional fittings at a turn-out, diamond crossing or overlap. 17

-

-

19168.4

... More
11(a) (i)Supply and erection of 25 kV solid core cut-in insulator. 18

-

-

16178.96

... More
11(a) (ii)Supply and erection of 25 kV solid core suspension insulator. 19

-

-

14919.52

... More
11(b)Supply without insulator and erection of 25 kV Post Insulators.

-

-

10213.92

... More
12(a)Supply without insulator and erection of 25 kV section insulator assembly (Conventional type)

-

-

127616.91

... More
13(a)Supply and erection of 25 kV Single Pole Isolator with out earth contact assembly (without Insulators) 22

-

-

102409.08

... More
13(e)Extra on item 13 (a),(b) or [c] for an inter locking device. 23

-

-

9715.68

... More
15(a)Supply and erection of all type of copper jumpers. 24

-

-

116169.5

... More
16(a)Supply and erection of structure bonds 25

-

-

109820.4

... More
16(a)(ii)Dismantling of structure bonds 26

-

-

4013.6

... More
16(a)(iii)Re-rection of structure bonds 27

-

-

2508.5

... More
16(a)(iv)Supply and erection of structure bonds during NI working. 28

-

-

79580

... More
16(b)Supply and erection of longitudinal bond. 29

-

-

9051.36

... More
16(b)(ii)Dismantling of longitudinal bond. 30

-

-

2678.04

... More
16(b)(iii)Re-erection of longitudinal bond. 31

-

-

892.68

... More
16(b)(iv)Supply and erection of longitudinal bond during NI working.

-

-

22628.4

... More
16(c)(ii)Dismantling of transverse and special bonds. 34

-

-

3238.56

... More
16(c)(iii)Re-erection of transverse and special bonds. 35

-

-

2159.04

... More
16(c)(iv)Supply and erection of transverse and special bonds. 36

-

-

37229.6

... More
16(aa)Drilling of holes on rails 37

-

-

16393.48

... More
17(a)Supply and erection of Earth electrode. 38

-

-

39589.32

... More
17 (c) Supply and erection of earth bus 39

-

-

9515

... More
17(d)Supply and erection of Copper strips for equipment earthing. 40

-

-

38406

... More
26(a)(i)Supply and erection of Aluminium Bus-Bar 36 /28 mm 41

-

-

33008.4

... More
26(a)(ii)Supply and erection of 18 mm Copper Bus-bar. 42

-

-

31472.16

... More
26(a)(iii)Supply and erection of all types of Copper connnectors.. 43

-

-

78410.52

... More
26(b)(i)Supply and erection of all types Aluminium Bus-Bar and connectors(36/28) 44

-

-

56155.8

... More
31(a)Transfer of equipment from one mast or support to other. 45

-

-

35900.96

... More
31(b)Provision of an additional bracket assembly / assemblies on a mast or support. 46

-

-

23874

... More
31(d)Dismantling of existing over Head Equipment 47

-

-

5994.45

... More
31(f)Splicing and extension of Over head conductors. 48

-

-

8788.4

... More
31(h)Slewing of equipment. 49

-

-

21445.08

... More
31(k)(i)Dismantlement of OHE mast / structure by cutting. 50

-

-

33423.6

... More
31(k)(ii)Dismantlement of Uprights of TTCs/Portals by cutting. 51

-

-

15916

... More
31(l)(i)Retrieval of traction masts, main masts, TTC uprights etc. 52

-

-

39582.4

... More
31(n)Dismantlement of guy rod

-

-

1799.2

... More
31(o)Releasing of Multiple Cantilever Cross arm assemblies where single bracket assembly is leftover on MCC after modification 54

-

-

1799.2

... More
31(p)Dismantlement of drop arms/ booms / temporary masts. 55

-

-

4603.53

... More
31(r)Dismantling of Cantilever assemblies including insulators. 56

-

-

6311.04

... More
31(s)Dismantling of fabricated steel & SPS

-

-

449.8

... More
31(t)(i)Dismantling of a regulating equipment (3-pulley type) with counter weight assembly for Conventional OHE. 58

-

-

6767.76

... More
31(t)(iii)Dismantling of anticreep with galvanised Steel wire.

-

-

2508.5

... More
31(t)(iv)Dismantling of copper jumper 60

-

-

59

... More
31(t)(v)Dismantling of material of termination of over head equipment (Reg.) 61

-

-

1785.36

... More
31(t)(xi)Dismantling of existing droppers 62

-

-

6366.4

... More
31(t)(xii)Re-adjustment of OHE spans including erection of droppers

-

-

31832

... More
32/3(a)Erection of Traction masts and main masts of Switching stations and LT supply Transformer station under power block

-

-

31819.03

... More
32/3(b)Erection of fabricated steel work such as TTC, portals SPS etc. under power block 65

-

-

110443.2

... More
32/3(e)Extra charges on erection of Guy rod assembly under power block

-

-

21590.4

... More
32/4(a) (i)Extra charges on Erection of Single braket assembly suitable for Conventional type OHE (Regulated) under power block

-

-

85012.2

... More
32/4(b)(i)Extra charges on Erection of a pull off arrangement for Conventional OHE under power block 68

-

-

508.62

... More
32/6(a)Extra charges on Erection of regulated conventional OHE under power block.

-

-

116479.17

... More
32/8(a) (v)Extra charges on Erection of regulating equipment (3 pulley type) with counter weight assembly for Conventional OHE under power block

-

-

47350.1

... More
32/8(b) (ii)Supply without Insulator & erection of materials for termination of Double Overhead equipment conductors (Regulated) under power block

-

-

10923.22

... More
32/9(a)Extra charges on Erection of anti creep with galvanised steel wire suitable for Conventional OHE. (Regulated) under power block

-

-

12533.85

... More
32/10(a) Extra charges on erection of additional fittings at a turn out diamond crossing or overlap under power block

-

-

4124.32

... More
32/11(a) (i)Extra charges on Erection of 25 kV solid core cut-in insulator under power block

-

-

4304.24

... More
32/11(a) (ii)Extra charges on Erection of 25 kV solid core suspension insulator under power block 75

-

-

2574.24

... More
32/11(b)Extra charges on Erection of 25 kV Post Insulators under power block

-

-

2574.24

... More
32/12(a) Extra charges on Erection of 25 kV Section Insulator assembly suitable for Conventional type OHE under power block

-

-

8034.12

... More
32/13(a)Extra charges on Erection of 25 kV Single Pole Isolator with out earth contact assembly under power block 78

-

-

7447.65

... More
32/15(a)Extra charges on Erection of all types of copper jumpers under power block

-

-

7823.06

... More
32/31(a)Extra on Transfer of equipment from one mast or support to other under power block.

-

-

35900.96

... More
32/31(b)Extra on Provision of an additional bracket assembly / assemblies on a mast or support under power block.

-

-

23874

... More
32/31(d) Extra charges on Dismantling of Existing Over Head Equipment under power block. 82

-

-

81

... More
32/31(f)Extra on Splicing and extension of Over head conductors under power block. 83

-

-

8788.4

... More
32/31(h)Extra charges on slewing of equipment under power block.

-

-

21445.08

... More
32/31(k)Extra charges on Dismantlement of OHE mast / structure by cutting under power block.

-

-

33423.6

... More
32/31(l)(i)Extra charges on Retrieval of traction masts, main masts, TTC uprights etc. under power block. 86

-

-

39582.4

... More
32/31(n)Extra charges on Dismantlement of guy rod under power block.

-

-

1799.2

... More
32/31(o)Extra charges on Releasing of Multiple Cantilever Cross arm assemblies where single bracket assembly is leftover on MCC after modification under power block.

-

-

1799.2

... More
32/31(r)Extra charges on Dismantling of Cantilever assemblies including insulators under power block. 89

-

-

6311.04

... More
32/31(s)Extra charges on Dismantling of fabricated steel & SPS under power block.

-

-

449.8

... More
32/31(t)(i)Extra charges on Dismantling of a regulating equipment (3-pulley type) with counter weight assembly for Conventional OHE under power block. 91

-

-

6767.76

... More
32/31(t)(iv)Extra charges on Dismantling of copper jumper under power block.

-

-

1390.92

... More
32/ 31(t)(v)Extra charges on Dismantling of material of termination of over head equipment (Reg.) under power block. 93

-

-

1785.36

... More
32/31(t)(xi)Extra charges on dismantling of existing droppers under power block.

-

-

6366.4

... More
32/31(t) (xii)Extra charges on re-adjustment of OHE spans including erection of droppers under power block 95

-

-

31832

... More
33/ 3(a)Extra on erection rate for steel work done manually under item No. 3(a) 96

-

-

31728.2

... More
33 / 3(b)Extra on erection rate for steel work done manually under item No. 3(b) 97

-

-

55200.84

... More
36(a)Unloading of all type of Steel Structures. 98

-

-

5518.7

... More
36(b)Loading of all type of Steel Structures. 99

-

-

8944.1

... More
37(a)Unloading of all type of Copper & Aluminum conductors. 100

-

-

733.52

... More
37(b)Loading of all type of Copper & Aluminum conductors. 101

-

-

733.52

... More
39(a)Erection of released guy rod. 102

-

-

1989.5

... More
39(b)Erection of released bracket assembly. 103

-

-

41779.5

... More
39(d)Erection of released termination.

-

-

2984.25

... More
39(e)Erection of released additional fittings at turnouts, diamond crossing and over laps

-

-

3389.07

... More
40Supply and erection of Number Plates on existing masts

-

-

7335.2

... More
3(a)Supply of Traction masts and main masts of switching stations, LT supply transformer station as per RDSO drawings and IS Specifications.

-

-

4542195

... More
3(b)Supply of fabricated steel work other than masts such as TTC's (with 8.0m and 5.5m booms), portal sets (with all components) as per RDSO drawings and IS specifications.

-

-

1587804

... More
3[c]Supply of Fabricated steel work other than mast, TTC's, portals, such as SPS, special fabricated steel etc.

-

-

1078848

... More
6(a)(iii)Supply of 7mm dia solid round hard drawn copper wire as RDSO specification. 2

-

-

18207

... More
6(a)(iv)Supply of 5mm dia solid round hard drawn copper wire as RDSO specification. 3

-

-

182070

... More
15(a)(ii)Supply of 130 sq.mm Cadmium copper large span wire as per specification.

-

-

204102

... More
15(a)(iii)Supply of 105 sq.mm Annealed Stranded Copper jumper wire as per specification.

-

-

6803.4

... More
15(a)(iv)Supply of 50 sq.mm Annealed Stranded Copper jumper wire as per specification.

-

-

58752

... More
4(ax)(i)Supply of Stay & Bracket insulator set for item 4(a)(i) (iii) (v)

-

-

836362.8

... More
4(ax)(ii)Supply of Stay & Bracket composite type insulators (long creepage) for item 4(a)(i)(iii) (v) 3

-

-

36152.48

... More
4(bx)(i)Supply of 9 ton insulator for item 4(b)(i)&(iii) 4

-

-

4184.18

... More
4(bx)(ii)Supply of 9-ton insulator for item 4(b)(i)(iii) for polluted zone 5

-

-

20085.52

... More
8(bx)(i)Supply of 9-ton insulators for item no. 8(b)(i) /(ii)/(iii)/(v)/(vi)/(vii)/(viii)/(ix) 6

-

-

75315.24

... More
9(ax)(i)Supply of 9-ton insulators for item no. 9(a), (b),(c) 7

-

-

83701.8

... More
11(ax)(i)Supply of 25KV solid core insulators for item no 11(a)(i),(ii) 8

-

-

58578.52

... More
11(ax)(ii)Supply of 25KV solid core insulators for item no 11(a)(i),(ii) for polluted zone 9

-

-

10042.76

... More
11(bx)Supply of 25KV Post insulator for 11(b)

-

-

65279.76

... More
13(ax)Supply of Post & Operating rod insulators for item Nos.13(a)

-

-

41435.94

... More
31(f)(i)Supply of Contact wire Splice 2

-

-

5278.8

... More
31(f)(ii)Supply of catenary wire Splice 3

-

-

2079.72

... More
31(f)(iii)Supply of Large span wire ending clamp 4

-

-

2385

... More
53Transportation of released/New TrD materials

-

-

12720

... More
Breaking of mass concrete by using pneumatic breaker (tractor mounted) including disposal of debris out of the yard limits including crossing of tracks, rehandling etc. 6

-

-

188472.24

... More
41(a)(i)Supply and erection of caution boards for 25kV traction 7

-

-

45792

... More
41(a)(ii)Supply and erection of danger boards for 25kV traction 8

-

-

51516

... More
41(a)(iii)Supply and erection of public caution boards 9

-

-

51516

... More
41(a)(iv)Supply and erection Danger board for L.C. gate height gauge 10

-

-

59148

... More
41(a)(v)Supply and erection of working limit board 11

-

-

40068

... More
41(a)(vi)Supply and erection of shock treatment chart

-

-

1590

... More
41(b)(v)Supply and erection retro reflective Engine stop board as per latest RDSO specification.

-

-

30528

... More
Preparation of Pegging plans duly showing details of TRD assets & OHE arrangements on existing electrified lines.

-

-

56850.3

... More
2(a) (i)Concrete for foundations and plinth in hard soil. In M10 grade 2

-

-

32440.32

... More
2(a) (ii)Concrete for foundations and plinth in rocky soil.M10 grade 3

-

-

35251.92

... More
2(b) Concrete for foundations and plinth in other than hard soil and rock 4

-

-

453816

... More
2 (c) (i)Reinforced Concrete M15 grade

-

-

17523

... More
1(a)Preparation of Designs and drawings for creation of IOL location on existing electrifed main line including necessary shifting of anticreep location

-

-

6450.31

... More
3(a)Erection of Traction masts and main masts of Switching stations and LT supply Transformer station. 3

-

-

10909.38

... More
3(b)Erection of fabricated steel work such as TTC, Portals etc. 4

-

-

18407.2

... More
3(c )Erection of fabricated Small Part Steel work etc. 5

-

-

18407.2

... More
3(e)Supply and erection of Guy rod assembly.

-

-

51972.66

... More
4(a)(i)Supply and Erection of Single bracket assembly without insulator for conventional OHE. 7

-

-

188694.56

... More
4(a)(ii)Extra on 4(a) (I) for supporting two OHEs. 8

-

-

6695.1

... More
6(a)Erection of regulated conventional OHE.

-

-

49368.66

... More
8(a) (v)Supply and erection of regulating equipment (3 pulley type) with counter weight assembly for conventional OHE. 10

-

-

253348.12

... More
8(a) (xii)Marking of "Y" - Measurement at BWA locations.

-

-

588.2

... More
8(b)(i) Supply without Insulator & erection of materials for termination of Single Overhead equipment conductors OR Terminating wire (Regulated)

-

-

17618.32

... More
8(b)(ii) Supply without Insulator & erection of materials for termination of Double Overhead equipment conductors (Regulated)

-

-

15158.26

... More
9(a)Supply with out insulator and erection of anti creep with galvanised steel wire for conventional OHE. 14

-

-

23531.46

... More
11(a) (i)Supply and erection of 25 kV solid core cut-in insulator. 15

-

-

24268.44

... More
11(b)Supply without insulator and erection of 25 kV Post Insulators.

-

-

3404.64

... More
13(a)Supply and erection of 25 kV Single Pole Isolator with out earth contact assembly (without Insulators) 17

-

-

68272.72

... More
13(e)Extra on item 13(a), (b) or (c) for an inter-locking device. 18

-

-

6892.32

... More
15(a)Supply and erection of copper jumpers. 19

-

-

13667

... More
16(a)Supply and erection of structure bonds 20

-

-

15916

... More
16(b)Supply and erection of longitudinal bond. 21

-

-

11314.2

... More
16(c) Supply and erection of transverse and special bonds. 22

-

-

9307.4

... More
17 (c) Supply and erection of earth bus. 23

-

-

1522.4

... More
31(a)Transfer of equipment from one mast or support to other.

-

-

22438.1

... More
31(b)Provision of an additional bracket assembly / assemblies on a mast or support. 25

-

-

24

... More
31(d) Dismantling of Existing Over Head Equipment. 26

-

-

4795.56

... More
31(f)Splicing and extension of Over head conductors. 27

-

-

17576.8

... More
31(h)Slewing of equipment. 28

-

-

3574.18

... More
31(k)Dismantlement of OHE mast / structure by cutting. 29

-

-

22282.4

... More
31(l)(i)Retrieval of traction masts, main masts, TTC uprights etc. 30

-

-

19791.2

... More
31(n)Dismantlement of guy rod

-

-

2698.8

... More
31(o)Releasing of Multiple Cantilever Cross arm assemblies where single bracket assembly is leftover on MCC after modification 32

-

-

899.6

... More
31(r)Dismantling of Cantilever assemblies including insulators. 33

-

-

4733.28

... More
31(s)Dismantling of fabricated steel & SPS 34

-

-

359.84

... More
31(t)(iii)Dismantling of anti creep with galv. Steel wire. 35

-

-

1254.25

... More
31(t)(iv)Dismantling of copper jumper 36

-

-

463.64

... More
31(t)(xii)Readjustment of OHE spans including erection of droppers

-

-

47748

... More
32/3(a)Extra charges on Erection of Traction masts and main masts of Switching stations and LT supply Transformer station under power block

-

-

10909.38

... More
32/3(b)Extra charges on Erection of fabricated steel work such as TTC, portals SPS etc.under power block 39

-

-

18407.2

... More
32/3(e)Extra charges on erection of Guy rod assembly.under power block

-

-

3598.4

... More
32/4(a) (i)Extra charges on Erection of Single braket assembly suitable for Conventional type OHE (Regulated)under power block 41

-

-

12594.4

... More
32/6(a)Extra charges on Erection of regulated conventional OHE under power block.

-

-

20707.41

... More
32/8(a) (v)Extra charges on Erection of regulating equipment (3 pulley type) with counter weight assembly for Conventional OHE. under power block

-

-

13528.6

... More
32/8(b) (i)Extra charges on Erection of materials for termination of single over head equipment conductor OR terminating wire (Regulated) under power block

-

-

3120.92

... More
32/9(a)Extra charges on Erection of anti creep with galvanised steel wire suitable for Conventional OHE. (Regulated).under power block

-

-

2506.77

... More
32/11(a) (i)Extra charges on Erection of 25 kV solid core cut-in insulator under power block 46

-

-

6456.36

... More
32/11(b)Extra charges on Erection of 25 kV Post Insulators under power block

-

-

858.08

... More
32/13(a)Extra charges on Erection of 25 kV Single Pole Isolator with out earth contact assembly under power block

-

-

4965.1

... More
32/31(a)Extra charges on Transfer of equipment from one mast or support to other under power block.

-

-

22438.1

... More
32/31(b)Extra charges on Provision of an additional bracket assembly / assemblies on a mast or support under power block.

-

-

19895

... More
32/31(d) Extra charges on Dismantling of Existing Over Head Equipment under power block.

-

-

4795.56

... More
32/31(f)Extra charges on Splicing and extension of Over head conductors under power block.. 53

-

-

17576.8

... More
32/31(h)Extra charges on Slewing of equipment under power block..

-

-

3574.18

... More
32/31(k)Extra charges on Dismantlement of OHE mast / structure by cutting under power block.

-

-

22282.4

... More
32/31(l)(i)Extra charges on Retrieval of traction masts, main masts, TTC uprights etc.under power block. 56

-

-

19791.2

... More
32/31(n)Extra charges on Dismantlement of guy rod under power block.

-

-

2698.8

... More
32/31(o)Extra charges on Releasing of Multiple Cantilever Cross arm assemblies where single bracket assembly is leftover on MCC after modification under power block.

-

-

899.6

... More
32/31(r)Extra charges on Dismantling of Cantilever assemblies including insulators under power block. 59

-

-

4733.28

... More
32/31(s)Extra charges on Dismantling of fabricated steel & SPS under power block. 60

-

-

359.84

... More
32/31(t)(iv)Extra charges on Dismantling of copper jumper under power block.

-

-

463.64

... More
32/31(t)(xii)Extra charges on Readjustment of OHE spans including erection of droppers under power block 62

-

-

47748

... More
33/ 3(a)Extra on erection rate for steel work done manually under item No. 3(a) 63

-

-

5439.12

... More
33 / 3(b)Extra on erection rate for steel work done manually under item No. 3(b) 64

-

-

9200.14

... More
33/ 6(a) Extra on erection rate for stringing work done manually under item 6(a) ,6(d) 65

-

-

10355.09

... More
36(a)Unloading of all type of Steel Structures. 66

-

-

501.7

... More
36(b)Loading of all type of Steel Structures. 67

-

-

813.1

... More
37(a)Unloading of all type of Copper & Aluminum conductors. 68

-

-

275.07

... More
37(b)Loading of all type of Copper & Aluminum conductors. 69

-

-

275.07

... More
40Supply and erction of Number Plates on existing masts 70

-

-

7335.2

... More
41Supply and erection of Caution boards for 25 kV Traction

-

-

2864.88

... More
3(a)Supply of Traction masts and main masts of switching stations , LT supply transformer station as per RDSO drawings and IS Specifications.

-

-

778662

... More
3(b)Supply of fabricated steel work other than masts such as TTC's (with 8.0 m and 5.5m booms), portal sets (with all components) as per RDSO drawings and IS specifications.

-

-

264634

... More
3[c]Supply of Fabricated steel work other than mast, ttc's, portals, such as SPS,special fabricated steel etc.

-

-

269712

... More
6(a)(iv)Supply of 5mm dia solid round hard drawn copper wire as RDSO specification.

-

-

84966

... More
15(a)(iii)Supply of 105 sq.mm Annealed Stranded Copper jumper wire as per specification.

-

-

13606.8

... More
15(a)(iv)Supply of 50 sq.mm Annealed Stranded Copper jumper wire as per specification.

-

-

11750.4

... More
4(ax)(i)Supply of Stay & Bracket insulator set for item 4(a)(i) (iii) (v) 2

-

-

123905.6

... More
4(bx)(ii)Supply of 9 ton insulator for item 4(b)(I) (iii) for polluted zone 3

-

-

10042.76

... More
8(bx)(i)Supply of 9 ton insulators for item no 8(b)(I)/(ii)/(iii)/( v)//(vi)/(vii)/(viii)/(ix)

-

-

16736.72

... More
8(bx)(ii)Supply of 9 ton insulators for Pollutted Zone item no 8(b)(I)/(ii)/(iii)/( v)//(vi)/(vii) /(viii)/(ix) 5

-

-

10042.76

... More
9(ax)(I)Supply of 9 ton insulators for item no 9(a),(b),[c] 6

-

-

8370.18

... More
11(ax)(i)Supply of 25KV solid core insulators for item no 11(a)(i),(ii) 7

-

-

50210.16

... More
11(bx)supply of 25KV Post insulator for 11(b) 8

-

-

21759.92

... More
13(ax)Supply of Post & Operating rod insulators for item 13(a)

-

-

27623.96

... More
31(f)(i)Supply of Contact wire Splice 2

-

-

5942.8

... More
31(f)(ii)Supply of catenary wire Splice

-

-

2341.32

... More
31(f)(iv)Supply of Anchor "V" Loop 5

-

-

8735.2

... More
53Transportation of released/New TrD materials

-

-

1432

... More
31(f)(i)Preparation of Pegging plans duly showing details of TRD assests & OHE arrangments on existing electrified lines

-

-

2974.73

... More
2(a) (i)Concrete for foundations and plinth in hard soil. In M10 grade 2

-

-

83336.4

... More
2(a) (ii)Concrete for foundations and plinth in rocky soil.M10 grade

-

-

91576.8

... More
2(b) Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts) 4

-

-

507941.28

... More
2 (c) Reinforced Concrete M15 grade 5

-

-

4848.48

... More
2 (e)Extra for supply & sinking of concrete shells.M15 grade 6

-

-

7431.48

... More
2 (f)Casting of foundations using mechanised Augur.M15 grade 7

-

-

10374.84

... More
2(g)Casting of single under reamed pile foundation. M15 grade

-

-

10450.44

... More
2(h) (I)Reinforcement cement concrete, ratio 1:2:4 in columns with 20 mm and down graded stone aggregate and coarse sand.

-

-

13371.12

... More
2(h) (ii)Reinforcement cement concrete, ratio 1:3:6 in pile caps with 20 mm and down graded stone aggregate and coarse sand.

-

-

12305.16

... More
2(h) (iii)Mass concrete (PCC), ratio stone with nominal size stone aggregate 40 mm gauge and ordinary sand in mud mat.

-

-

4712.4

... More
1(a)Preparation of Designs and drawings. 2

-

-

12900.61

... More
1(c)Preparation of Station working Rules diagram and Instructions

-

-

9824.67

... More
3(a)Erection of Traction masts and main masts of Switching stations and LT supply Transformer station. 4

-

-

10182.09

... More
3[c]Erection of fabricated Small Part Steel work etc.

-

-

4001.49

... More
3(e)Supply and erection of Guy rod assembly.

-

-

17324.22

... More
7 (d)Manual Erection of All aluminum 25 KV feeder / Return Conductor (Single spider ) @ 5% of the route length

-

-

5157.13

... More
8(b)(iii) Supply without Insulator & erection of materials for termination of all aluminum 25KV feeder / Return conductor (Single spider ) 8

-

-

4472.05

... More
11(a) (ii)Supply and erection of 25 kV solid core suspension insulator. 9

-

-

29839.04

... More
11(b)Supply without insulator and erection of 25 kV Post Insulators. 10

-

-

851.16

... More
16(a)Supply and erection of structure bonds 11

-

-

14324.4

... More
17(a)Supply and erection of Earth electrode. 12

-

-

3299.11

... More
33/ 3(a)Extra on erection rate for steel work done manually under item No. 3(a) 13

-

-

5076.51

... More
41Supply and erection of Caution boards for 25 kV Traction

-

-

716.22

... More
3(a)Supply of Traction masts and main masts of switching stations , LT supply transformer station as per RDSO drawings and IS Specifications.

-

-

726751.2

... More
3[c]Supply of Fabricated steel work other than mast, ttc's, portals, such as SPS,special fabricated steel etc

-

-

134856

... More
15(a)(v)Supply of 150 sq.mm (37/2.25mm) Copper feeder jumper wire as per specification.

-

-

44401.5

... More
11(ax)(ii)Supply of 25KV solid core insulators for item no 11(a)(i),(ii) for polluted zone 2

-

-

71513.28

... More
11(bx)supply of 25KV Post insulator for 11(b) 3

-

-

4842.18

... More
13(ax)Supply of Post & Operating rod insulators for item 13(a)

-

-

12294.18

... More
7(a)Supply of All aluminum 25KV Feeder /Return conductor (Single spider ) as per latest Specification 2

-

-

312530.4

... More
53Transportation of released/New TrD materials

-

-

18444

... More
2(a) (i)Concrete for foundations and plinth in hard soil. In M10 grade

-

-

12302.04

... More
2(b) Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts)

-

-

34082.64

... More
3(a)Erection of Traction masts and main masts of Switching stations and LT supply Transformer station. 2

-

-

1272.76

... More
3(b)(ii)Erection of fabricated Small Part Steel work etc. 3

-

-

5522.16

... More
11(a) (ii)Supply and erection of 25 kV solid core suspension insulator. 4

-

-

4044.74

... More
11(b)Supply without insulator and erection of 25 kV Post Insulators. 5

-

-

3404.64

... More
15(a)Supply and erection of copper jumpers. 6

-

-

6833.5

... More
16(a)Supply and erection of structure bonds 7

-

-

6366.4

... More
17(a)Supply and erection of Earth electrode. 8

-

-

6598.22

... More
17 (c) Supply and erection of earth bus.

-

-

5709

... More
27(a)Oil filtration, erection, testing and commissioning of 25 kV / 240 volts, 5 / 10/25/50 kVA LT supply transformer.

-

-

9653.4

... More
28Supply and Erection of 25 kV Drop out fuse switch for all oil / dry type L.T.Supply transformerss of all capacities 11

-

-

19348.32

... More
30(b)(iii)Supply and erection of anticlimbing device etc:L.T. stations 12

-

-

1740.38

... More
33/ 3(a)Extra on erection rate for steel work done manually under item No. 3(a) 13

-

-

906.52

... More
41Supply and erection of Caution boards for 25 kV Traction

-

-

1432.44

... More
3(a)Supply of Traction masts and main masts of switching stations , LT supply transformer station as per RDSO drawings and IS Specifications.

-

-

129777

... More
3[c]Supply of Fabricated steel work other than mast, ttc's, portals, such as SPS,special fabricated steel etc

-

-

80913.6

... More
15(a)(iv)Supply of 50 sq.mm Annealed Stranded Copper jumper wire as per specification.

-

-

8236.8

... More
11(ax)(ii)Supply of 25KV solid core insulators for item no 11(a)(i),(ii) for polluted zone 2

-

-

11256.72

... More
11(bx)supply of 25KV Post insulator for 11(b) 3

-

-

24390.24

... More
28(X)Supply of 25 KV Post insulators for item 28.[ 2 Nos as one set ]

-

-

24394.32

... More
27(a)(ii)Supply of 10 kVA, 25 kV/240 volts LT supply Transformers (Oil type) as per latestRDSO Specification No. ETI/PSI/15 (11/92) or latest.

-

-

317288.24

... More
28(a)Supply of link pull rod for 25 KV Drop Out fuse switch as per latest RDSO specification

-

-

17341.52

... More
2(a) (i)Concrete for foundations and plinth in hard soil. In M10 grade 2

-

-

8192

... More
2(a) (ii)Concrete for foundations and plinth in rocky soil.M10 grade 3

-

-

8902

... More
2(b) Concrete for foundations and plinth in other than hard soil and rock 4

-

-

305600

... More
2 (c) (i)Reinforced Concrete M15 5

-

-

9622

... More
2 (c) (ii)Cable trench Covers 6

-

-

27600

... More
2 (d) (i)Reinforced brick work 7

-

-

33580

... More
2 (d) (ii)Plastering of brick work 8

-

-

3750

... More
2 (e)Extra for supply & sinking of concrete shells.M15 grade 9

-

-

9378

... More
2 (f)Casting of foundations using mechanised Augur.M15 grade 10

-

-

13092

... More
2(g)Casting of single under reamed pile foundation. M15 grade

-

-

13188

... More
2(h) (I)Reinforcement cement concrete, ratio 1:2:4 in columns with 20 mm and down graded stone aggregate and coarse sand.

-

-

168740

... More
2(h) (ii)Reinforcement cement concrete, ratio 1:3:6 in pile caps with 20 mm and down graded stone aggregate and coarse sand.

-

-

12

... More
2(h) (iii)Mass concrete (PCC), ratio stone with nominal size stone aggregate 40 mm gauge and ordinary sand in mud mat

-

-

5946

... More
1(b)Preparation of Designs and drawings for Switching Station. 2

-

-

27036.36

... More
1(c)Preparation of Station Working Rules and Instructions

-

-

9029.61

... More
1(d)Supply and installation of SWR boards on flexi sheets (fixed on decolum sheet) at nominated places including supply of Power block caps.

-

-

3657

... More
3(a)Erection of Traction masts and main masts of Switching stations and LT supply Transformer station. 5

-

-

6684.36

... More
3(c)Erection of fabricated Small Part Steel work etc. 6

-

-

21147

... More
3(e)Supply and erection of Guy rod assembly. 7

-

-

31844.52

... More
3(g)supply of steel for reinforcement for RCC work 8

-

-

25123.59

... More
7 (e)Erection of Copper cross fedder wire (37/2.25mmHDBC)

-

-

1816.42

... More
8(b)(iii) Supply without Insulator & erection of materials for termination of all aluminum 25KV feeder / Return conductor (Single spider )

-

-

16440.6

... More
8(b)(ix) Supply without Insulator & erection of materials for termination of all aluminum / 25KV Copper cross feeder wire with gantries 11

-

-

55408.32

... More
11(a) (i)Supply and erection of 25 kV solid core cut-in insulator. 12

-

-

7434.84

... More
11(a) (ii)Supply and erection of 25 kV solid core suspension insulator. 13

-

-

6856.08

... More
11(b)Supply without insulator and erection of 25 kV Post Insulators.

-

-

3129.12

... More
13(c)Supply and erection of 25 kV Double Pole Isolator with out earth contact assembly (without Insulators) 15

-

-

196193.28

... More
13(e)Extra on item 13(a), (b) or (c) for an inter-locking device. 16

-

-

3167.28

... More
15(a)Supply and erection of copper jumpers. 17

-

-

31402.5

... More
16(a)Supply and erection of structure bonds 18

-

-

5851.2

... More
17(a)Supply and erection of Earth electrode. 19

-

-

15160.65

... More
17 (c) Supply and erection of earth bus. 20

-

-

6996

... More
17(d)Supply and erection of Copper strips for equipment earthing. 21

-

-

7059.6

... More
18(a)Erection of 25 KV Interruptors - SF6/VAC

-

-

13705.8

... More
18 (d)Extra for erection of interlocking mechanism. 23

-

-

22

... More
19(a)(i) Erection of 25 KV PT(Type-I) 24

-

-

3014.64

... More
20(a) Erection of 42KV Lightning Arrestors 25

-

-

1958.88

... More
21Supply and Erection of Terminal boards in control cubicle. 26

-

-

15095.46

... More
22(a)Supply and erection of an iron clad 110V. DC. Fuse box. 27

-

-

537.42

... More
22(b)Supply and erection of 220 V. AC. Fuse box. 28

-

-

764.79

... More
23(a) Erection of Lead Acid Battery.(110 V,40-Ah) 29

-

-

5404.41

... More
24(a) Erection of Battery Charger. 30

-

-

742.53

... More
25(a)Supply and installation of cable for control and indication. 31

-

-

34582.5

... More
25(b)Supply and installation of cable for heater supply. 32

-

-

11925

... More
25(c)Supply and installation of cable for catenary indication. 33

-

-

11829.6

... More
25(d)Supply and installation of cable for LT power supply. 34

-

-

5604.75

... More
25(e)Supply and installation of cable for 110 V. DC. power supply. 35

-

-

2583.75

... More
26(a)(i) Supply and erection of Aluminum bus bar 36mm x 28mm. 36

-

-

55713.6

... More
26(b)(i)Supply and erection of Al Bus terminal 6480 37

-

-

58651.92

... More
26(b)(ii)Supply and erection of Al Bus splice 6490 38

-

-

4983.06

... More
26(b)(iii)Supply and erection of Al Bus Tee connector 6500 39

-

-

50689.2

... More
26(b)(vii)Supply and erection of Al Bus tap connector 6520 40

-

-

18762

... More
26(b)(v)Supply and erection of Al Bus terminal connector bolted type 6830-1

-

-

15353.04

... More
27(a)Oil filtration, erection, testing and commissioning of 25 kV / 240 volts, 5 / 10/25/50 kVA LT supply transformer.

-

-

4436.1

... More
28Supply and Erection of 25 kV Drop out fuse switch.for all oil/dry type L.T.Supply transformerss of all capacities 43

-

-

8891.28

... More
30(a)(i)Supply and Erection of Fencing Panel at switching stations. 44

-

-

119631.6

... More
30(a)(ii)Supply and Erection of Fencing Upright 45

-

-

98788.61

... More
30(b)(i)Supply and Erection of Anti-climbing device at switching stations. 46

-

-

13522.95

... More
33/ 3(a)Extra on erection rate for steel work done manually under item No. 3(a) 47

-

-

3332.64

... More
36(a)Unloading of all type of Steel Structures. 48

-

-

184.44

... More
36(b)Loading of all type of Steel Structures.

-

-

298.92

... More
37(a)Unloading of all type of Copper & Aluminum conductors. 50

-

-

49

... More
37(b)Loading of all type of Copper & Aluminum conductors. 51

-

-

168.54

... More
38(ii)Manning of SSP/SP 52

-

-

166759.2

... More
40Supply and erction of Number Plates on existing masts 53

-

-

2528.1

... More
41Supply and erection of Caution boards for 25 kV Tractio 54

-

-

3949.56

... More
42Shock Treatment charts Tri - lingual English, Hindi and telugu (Laminated) 55

-

-

257.58

... More
44(a)Supply and Erection of Name Plate[ Enamel Board ] for switching stations.

-

-

6582.6

... More
44(b)Supply and erection of schematic diagram board in switching / traction sub stations 57

-

-

3291.3

... More
44(c)Supply and erection of Standard First Aid Box 58

-

-

914.25

... More
44(d)Supply and erection of fire extinguishers 59

-

-

39495.6

... More
44(e)Supply and erection of fire buckets with stand. 60

-

-

9873.9

... More
44(f)Supply and spreading of 20 mm ballast at TSS/SSP/SP yards

-

-

127041

... More
3(a)Supply of Traction masts and main masts of switching stations , LT supply transformer station as per RDSO drawings and IS Specifications.

-

-

519108

... More
3[c]Supply of Fabricated steel work other than mast, ttc's, portals, such as SPS,special fabricated steel etc.

-

-

337140

... More
7 (e)Supply of 150 s.qmm (37/2.25 mm ) copper conductor (feeder wire)

-

-

111034.8

... More
15(a)(i)Supply of 160 sq.mm Annealed Stranded Copper jumper wire as per specification.

-

-

89996

... More
15(a)(iii)Supply of 105 sq.mm Annealed Stranded Copper jumper wire as per specification.

-

-

29814.9

... More
15(a)(iv)Supply of 50 sq.mm Annealed Stranded Copper jumper wire as per specification.

-

-

5149.44

... More
8(bx)(ii)Supply of 9 ton insulators for item no 8(b)(I)/(ii)/(iii)/( v)//(vi)/(vii)/(viii)/(ix) for polluted zone 2

-

-

56095.6

... More
11(ax)(i)Supply of 25KV solid core insulators for item no 11(a)(i),(ii) 3

-

-

22438.24

... More
11(ax)(ii)Supply of 25KV solid core insulators for item no 11(a)(i),(ii) for polluted zone 4

-

-

13463.92

... More
11(bx)supply of 25KV Post insulator for 11(b) 5

-

-

14586.32

... More
13(cx)Supply of Post & Operating rod insulators for item 13(c)

-

-

74068.64

... More
18( a )Supply of 25KV Vacuum Interruptors with terminal connectors(800 A) 2

-

-

329107

... More
19(a)(i)Supply of 25 KV PT(Type-I) 3

-

-

69027

... More
20(a)Supply of 42KV Lightning Arrestors 4

-

-

45946

... More
23(a)Supply of Lead Acid Battery.(110 V,40-Ah) 5

-

-

60665

... More
24(a)Supply of Battery Charger(110 V, 40 -Ah)

-

-

28827

... More
27(a)(ii)Supply of 10 kVA, 25 kV/240 volts LT supply Transformers (Oil type) as per latestRDSO Specification No. ETI/PSI/15 (11/92) or latest. 7

-

-

88628

... More
28(a)Supply of link pull rod for 25 KV Drop Out fuse switch as per latest RDSO specn. 8

-

-

5947

... More
53Transportation of released/New TrD materials

-

-

4000

... More
Modifications to the existing SCADA installation 2

-

-

500000

... More
Supply, erection, testing & commissioning of RTU as per RDSO specification for SSP

-

-

1547446.95



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.