South Central Railway Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

South Central Railway - SCR Tender

Works
Electrical and Electronics
Electrical Works
Ireps
Opening Date13 Nov 2024
Closing Date5 Dec 2024
Tender Amount₹ 93,24,793.91 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
2(a) (ii)Concrete for foundations and plinth in rocky soil.M10 grade

-

1074

16110

... More
2(b) Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BTmasts)

-

2433

617982

... More
2(b) Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BTmasts) 7

-

621

157734

... More
2 (c) Reinforced Concrete M15 grade 8

-

1603

1603

... More
2 (c) Reinforced Concrete M15 grade 9

-

321

321

... More
2 (e) Extra for supply & sinking of concrete shells.M15 grade 10

-

2047

2047

... More
2 (e) Extra for supply & sinking of concrete shells.M15 grade 11

-

902

902

... More
2 (f) Casting of foundations using mechanised Augur.M15 grade

-

3427

3427

... More
2 (f) Casting of foundations using mechanised Augur.M15 grade 13

-

690

690

... More
2(g) Casting of single under reamed pile foundation. M15 grade

-

4147

4147

... More
2(h) (i) Reinforcement cement concrete, ratio 1:2:4 in columns with 20 mm and down graded stoneaggregate and coarse sand.

-

5306

53060

... More
2(h) (ii) Reinforcement cement concrete, ratio 1:3:6 in pile caps with 20 mm and down graded stoneaggregate and coarse sand.

-

4883

4883

... More
2(h) (iii) Mass concrete (PCC), ratio stone with nominal size stone aggregate 40 mm gauge and ordinarysand in mud mat. 17

-

1870

3740

... More
2 (c) (i) Reinforced ConcreteM15 grade 18

-

3687

14748

... More
2 (c) (i) Reinforced ConcreteM15 grade 19

-

738

2952

... More
2 (c) (ii) Cable trunch covers 20

-

1026

5130

... More
2 (c) (ii) Cable trunch covers 21

-

244

1220

... More
1(a) Preparation of Designs and drawings. 22

-

38776

38776.4

... More
1(b)"Preparation of Designs and drawings for Switching Station. " 23

-

17004

17004

... More
1(c) Preparation of Station working Rules diagram and Instructions

-

5679

17037

... More
1(d) Supply and installation of SWR boards on flexi sheets (fixed ondecolum sheet) at nominated placesincluding supply of Power block caps.

-

2300

6900

... More
3(a) Erection of Traction masts and main masts of Switching stations and LT supply Transformer station. 26

-

1051

48713.85

... More
3(b) Erection of fabricated steel work such as TTC, Portals etc. 27

-

5320

15960

... More
3[c] Erection of fabricated Small Part Steel work etc. 28

-

2313

13878

... More
3(e) Supply of Guy rod assembly. 29

-

4487

67305

... More
3(e) erection of Guy rod assembly. 30

-

520

7800

... More
4(a)(i) Supply of Single bracket assembly without insulator for conventional OHE. 31

-

6362

591666

... More
4(a)(i) Erection of Single bracket assembly without insulator for conventional OHE. 32

-

455

42315

... More
4(a)(ii) Extra on 4(a) (I) for supporting two OHEs. 33

-

1799

1799

... More
4(a)(ii) Extra on 4(a) (I) for supporting two OHEs. 34

-

136

136

... More
4(b)(i)Supply without Insulator of a pull off arrangement for Conventional type OHE. 35

-

5175

5175

... More
4(b)(i) erection of a pull off arrangement for Conventional type OHE. 36

-

294

294

... More
6(a) Erection of regulated conventional OHE.

-

74552

74552.4

... More
7 (d) Manual Erection of All aluminum 25 KV feeder / Return Conductor (Single spider ) @ 5% of theroute length

-

242

242

... More
7 (d) Manual Erection of All aluminum 25 KV feeder / Return Conductor (Single spider ) @ 5% of theroute length 40

-

2739

2739

... More
7 (e) Erection of Copper cross fedder wire (37/2.25mmHDBC)

-

-

571.2

... More
8(a) (v) Supply of regulating equipment (3-pulley type) with counter weight assembly forconventional OHE.

-

34656

277248

... More
8(a) (v) erection of regulating equipment (3-pulley type) with counter weight assembly forconventional OHE. 43

-

1955

15640

... More
8(a) (xii) Marking of "Y" - Measurement at BWA locations.

-

85

680

... More
8(b)(ii) Supply without Insulator of materials for termination of Double Overhead equipmentconductors (Regulated)

-

3866

23196

... More
8(b)(ii) erection of materials for termination of Double Overhead equipmentconductors (Regulated)

-

515

3090

... More
8(b)(iii) Supply without Insulator of materials for termination of all aluminum 25KV feeder /Return conductor (Single spider )

-

2134

6402

... More
8(b)(iii) erection of materials for termination of all aluminum 25KV feeder /Return conductor (Single spider )

-

451

1353

... More
8(b)(ix) Supply without Insulator of materials for termination of all aluminum / 25KV Coppercross feeder wire with gantries

-

3905

7810

... More
8(b)(ix) erection of materials for termination of all aluminum / 25KV Coppercross feeder wire with gantries

-

451

902

... More
9(a) Supply with out insulator and erection of anti-creep with galvanised steel wire for conventional OHE. 53

-

12153

12153

... More
9(a) erection of anti-creep with galvanised steel wire for conventional OHE.

-

1449

1449

... More
10(a) Extra on Item 6(a) for supply of additional fittings at a turn-out or diamond crossingor overlap.

-

2174

6522

... More
10(a) Extra on Item 6(a) for erection of additional fittings at a turn-out or diamond crossingor overlap. 56

-

596

1788

... More
11(a) (i)Supply of 25 kV solid core cut-in insulator. 57

-

858

12012

... More
11(a) (i) erection of 25 kV solid core cut-in insulator. 58

-

311

4354

... More
11(a) (ii)Supply of 25 kV solid core suspension insulator. 59

-

892

20516

... More
11(a) (ii) erection of 25 kV solid core suspension insulator. 60

-

186

4278

... More
11(b)Supply without insulator of 25 kV Post Insulators.

-

368

5152

... More
12(a)Supply (without Insulator) of 25 kV Section Insulator assembly [Conventional type] 63

-

23041

69123

... More
12(a) erection of 25 kV Section Insulator assembly [Conventional type]

-

1548

4644

... More
12(e) Erection of Light Weight 25KV Section Insulator assembly for usage on high speed routes

-

1548

1548

... More
13(a)Supply of 25 kV Single Pole Isolator with out earth contact assembly (withoutInsulators)

-

18297

59465.25

... More
13(a) erection of 25 kV Single Pole Isolator with out earth contact assembly (withoutInsulators)

-

1435

4663.75

... More
13(c)Supply of 25 kV Double Pole Isolator with out earth contact assembly (withoutInsulators)

-

29261

58522

... More
13(c) erection of 25 kV Double Pole Isolator with out earth contact assembly (withoutInsulators) 70

-

1587

3174

... More
13(d)Supply of an earth contact assembly in an isolator. 71

-

5364

6705

... More
13(d) erection of an earth contact assembly in an isolator. 72

-

166

207.5

... More
13(e)Extra on item 13(a), (b) or (c) for an inter-locking device. 73

-

1872

9828

... More
13(e)Extra on item 13(a), (b) or (c) for an inter-locking device. 74

-

120

630

... More
15(a)Supply of copper jumpers. 75

-

1842

51465.48

... More
15(a) erection of copper jumpers. 76

-

133

3716.02

... More
16(a)Supply of structure bonds 77

-

315

36540

... More
16(a) erection of structure bonds 78

-

145

16820

... More
16(b)Supply n of longitudinal bond. 79

-

198

9900

... More
16(b) erection of longitudinal bond. 80

-

129

6450

... More
16(c) Supply of transverse and special bonds. 81

-

382

17190

... More
16(c) erection of transverse and special bonds. 82

-

156

7020

... More
17(a)Supply of Earth electrode. 83

-

1355

10840

... More
17(a) erection of Earth electrode. 84

-

552

4416

... More
17(b)Extra for special embedment of earth electrode. 85

-

596

1311.2

... More
17 (c) erection of earth bus. 86

-

71

3905

... More
17 (c) erection of earth bus. 87

-

39

2145

... More
17(d)Supply of Copper strips for equipment earthing.

-

407

5698

... More
17(d) erection of Copper strips for equipment earthing. 89

-

-

88

... More
18(a)Erection of 25 KV Interruptors - SF6/VAC 90

-

78

78

... More
18(a)Erection of 25 KV Interruptors - SF6/VAC 91

-

2077

2077

... More
18 (d)Extra for erection of interlocking mechanism. 92

-

120

120

... More
19(a)(i) Erection of 25 KV PT(Type-I) 93

-

474

474

... More
20(a) Erection of 42KV Lightning Arrestors 94

-

308

308

... More
21Supply of Terminal boards in control cubicle. 95

-

9269

9269

... More
21 Erection of Terminal boards in control cubicle. 96

-

225

225

... More
22(a)Supply of an iron clad 110V. DC. Fuse box. 97

-

285

285

... More
22(a) erection of an iron clad 110V. DC. Fuse box. 98

-

53

53

... More
22(b) Supply of 220 V. AC. Fuse box. 99

-

428

428

... More
22(b) erection of 220 V. AC. Fuse box. 100

-

53

53

... More
25(a)Supply of cable for control and indication. 101

-

136

2720

... More
25(a) installation of cable for control and indication. 102

-

9

180

... More
25(b)Supply of cable for heater supply. 103

-

41

820

... More
25(b) installation of cable for heater supply. 104

-

9

180

... More
25(c)Supply of cable for catenary indication. 105

-

53

1060

... More
25(c) installation of cable for catenary indication. 106

-

9

180

... More
25(d)Supply of cable for LT power supply. 107

-

129

645

... More
25(d) installation of cable for LT power supply. 108

-

12

60

... More
25(e)Supply of cable for 110 V. DC. power supply. 109

-

53

530

... More
25(e) installation of cable for 110 V. DC. power supply. 110

-

12

120

... More
26(a)(i)Supply of Aluminium Bus-Bar 36 /28 mm 111

-

260

5200

... More
26(a)(i) erection of Aluminium Bus-Bar 36 /28 mm 112

-

32

640

... More
26(a)(ii)Supply of 18 mm Copper Bus-bar. 113

-

1390

44480

... More
26(a)(ii) erection of 18 mm Copper Bus-bar. 114

-

126

4032

... More
26(a)(iii) erection of all types of Copper connnectors.. 116

-

51

816

... More
26(b)(i)Supply of all types Aluminium Bus-Bar and connectors(36/28) 117

-

1600

32000

... More
26(b)(i) erection of all types Aluminium Bus-Bar and connectors(36/28) 118

-

23

460

... More
26(b)(ii)Supply of Al Bus splice 6490 119

-

1546

1546

... More
26(b)(ii) erection of Al Bus splice 6490 120

-

21

21

... More
26(b)(iii)Supply of Al Bus Tee connector 6500 121

-

1576

3152

... More
26(b)(iii) erection of Al Bus Tee connector 6500 122

-

18

36

... More
26(b)(vii)Supply of Al Bus tap connector 6520 123

-

1454

2908

... More
26(b)(vii) erection of Al Bus tap connector 6520 124

-

21

42

... More
26(b)(v)Supply of Al Bus terminal connector bolted type 6830-1 125

-

1189

2378

... More
27(a)Oil filtration, erection, testing and commissioning of 25 kV / 240 volts, 5 / 10/25/50 kVA LT supplytransformer.

-

78

78

... More
27(a)Oil filtration, erection, testing and commissioning of 25 kV / 240 volts, 5 / 10/25/50 kVA LT supplytransformer.

-

2712

2712

... More
28 Supply of 25 kV Drop out fuse switch for all oil / dry type L.T.Supply transformerss of allcapacities

-

5327

5327

... More
28 Erection of 25 kV Drop out fuse switch for all oil / dry type L.T.Supply transformerss of allcapacities 130

-

265

265

... More
30(a)(i)Supply of Fencing Panel at switching stations. 131

-

1628

16280

... More
30(a)(i) Erection of Fencing Panel at switching stations. 132

-

44

440

... More
30(a)(ii) Supply of Fencing Upright 133

-

-

24846

... More
30(a)(ii) Erection of Fencing Upright 134

-

-

1042

... More
30(b)(i)Supply of Anti-climbing device at switching stations. 135

-

184

1840

... More
30(b)(i)Erection of Anti-climbing device at switching stations. 136

-

5

50

... More
30(b)(iii)Supply of anticlimbing device etc:L.T. stations 137

-

337

337

... More
30(b)(iii) erection of anticlimbing device etc:L.T. stations 138

-

166

166

... More
31(a)Transfer of equipment from one mast or support to other. 139

-

1297

22049

... More
31(b)Provision of an additional bracket assembly / assemblies on a mast or support. 140

-

1150

14950

... More
31(d) Dismantling of Over Head Equipment. 141

-

4851

4851

... More
31(f) Splicing and extension of Over head conductors. 142

-

1270

7620

... More
31(h)Slewing of equipment. 143

-

-

5165

... More
31(k) Dismantlement of OHE mast / structure by cutting. 144

-

1610

10143

... More
31(l)(i)Retrieval of traction masts, main masts, TTC uprights etc. 145

-

5750

36225

... More
31(o)Releasing of Multiple Cantilever Cross arm assemblies where single bracket assembly is leftover onMCC after modification 147

-

260

520

... More
31(r) Dismantling of Cantilever assemblies including insulators. 148

-

228

1368

... More
31(s)Dismantling of fabricated steel & SPS 150

-

260

364

... More
31(t)(iv) Dismantling of copper jumper 151

-

67

134

... More
32/3(a)Extra charges on Erection of Traction masts and main masts of Switching stations and LT supplyTransformer station under power block

-

1051

3153

... More
32/3(b)Extra charges on Erection of fabricated steel work such as TTC, portals SPS etc.under powerblock 154

-

5320

5320

... More
32/4(a) (i)Extra charges on Erection of Single bracket assembly suitable for Conventional type OHE(Regulated)under power block 156

-

455

3640

... More
32/8(a) (v)Extra charges on Erection of regulating equipment (3 pulley type) with counter weightassembly for Conventional OHE. under power block

-

1955

3910

... More
32/11(a) (i)Extra charges on Erection of 25 kV solid core cut-in insulator under power block 161

-

311

1866

... More
32/13(a)Extra charges on Erection of 25 kV Single Pole Isolator with out earth contact assembly underpower block 163

-

1435

1435

... More
32/31(a)Extra charges on Transfer of equipment from one mast or support to other under power block.

-

1297

6485

... More
32/31(b)Extra charges on Provision of an additional bracket assembly / assemblies on a mast or supportunder power block.

-

1150

5750

... More
32/31(f)Extra charges on Splicing and extension of Over head conductors under power block.. 168

-

1270

5080

... More
32/31(k)Extra charges on Dismantlement of OHE mast / structure by cutting under power block.

-

1610

3220

... More
32/31(l)(i)Extra charges on Retrieval of traction masts, main masts, TTC uprights etc.under power block 171

-

5720

11440

... More
32/31(o)Extra charges on Releasing of Multiple Cantilever Cross arm assemblies where single bracketassembly is leftover on MCC after modification under power block.

-

260

520

... More
32/31(r)Extra charges on Dismantling of Cantilever assemblies including insulators under power block. 174

-

228

1368

... More
32/31(s)Extra charges on Dismantling of fabricated steel & SPS under power block. 175

-

-

104

... More
32/31(t)(xii)Extra charges on Readjustment of OHE spans including erection of droppers under powerblock 177

-

-

13800

... More
33/ 3(a)Extra on erection rate for steel work done manually under item No. 3(a) 178

-

524

24287.4

... More
33 / 3(b)Extra on erection rate for steel work done manually under item No. 3(b) 179

-

2659

7977

... More
33/ 6(a) Extra on erection rate for stringing work done manually under item 6(a) ,6(d) 180

-

7482

26935.2

... More
35 Internal and external lighting of SSP/SP building 181

-

14090

14090

... More
36(a)Unloading of all type of Steel Structures. 182

-

58

261

... More
36(b)Loading of all type of Steel Structures. 183

-

94

423

... More
37(a)Unloading of all type of Copper & Aluminum conductors 184

-

53

185.5

... More
37(b)Loading of all type of Copper & Aluminum conductors. 185

-

53

185.5

... More
40 Supply of Number Plates on existing masts 186

-

219

5343.6

... More
40 erction of Number Plates on existing masts 187

-

46

1122.4

... More
41 Supply of Caution boards for 25 kV Traction 188

-

345

6900

... More
41 erection of Caution boards for 25 kV Traction 189

-

69

1380

... More
42 Shock Treatment charts Tri - lingual English, Hindi and telugu (Laminated) 190

-

150

1995

... More
44(b) Supply of schematic diagram board and shock treatment charts in switching / tractionsubstations

-

1840

1840

... More
44(b) erection of schematic diagram board and shock treatment charts in switching / tractionsubstations 193

-

230

230

... More
44(c) Supply of Standard First Aid Box 194

-

460

460

... More
44(c) erection of Standard First Aid Box 195

-

115

115

... More
44(d)Supply of fire extinguishers 196

-

11040

11040

... More
44(d) erection of fire extinguishers 197

-

1380

1380

... More
44(e) Supply of fire buckets with stand. 198

-

5520

5520

... More
44(e) erection of fire buckets with stand. 199

-

690

690

... More
44(f) Supply of 20 mm ballast at TSS/SSP/SP yards 200

-

794

9528

... More
44(f) spreading of 20 mm ballast at TSS/SSP/SP yards 201

-

5

60

... More
3(g) supply of steel for reinforcement for RCC work 202

-

31602

31602

... More
3(c )Erection of fabricated Small Part Steel work etc. 203

-

5320

12236

... More
11(a) (ii)Supply of 25 kV solid core suspension insulator. 204

-

858

858

... More
11(a) (ii)erection of 25 kV solid core suspension insulator. 205

-

311

311

... More
26(a)(i) Supply of Aluminum bus bar 36mm x 28mm. 206

-

283

5660

... More
26(a)(i) erection of Aluminum bus bar 36mm x 28mm. 207

-

35

700

... More
26(b)(ii)Supply of Al Bus splice 6490 208

-

1516

6064

... More
26(b)(ii) erection of Al Bus splice 6490 209

-

21

84

... More
3(a) Supply of Traction masts and main masts of switching stations , LT supply transformer station asper RDSO drawings and IS Specifications.

-

71025

3292008.75

... More
3(b) Supply of fabricated steel work other than masts such as TTC's (with 8.0 m and 5.5m booms),portal sets (with all components) as per RDSO drawings and IS specifications.

-

72415

144830

... More
3[c] Supply of Fabricated steel work other than mast, ttc's, portals, such as SPS,special fabricated steeletc.

-

73805

612581.5

... More
6(a)(iv) Supply of 5mm dia solid round hard drawn copper wire as RDSO specification.

-

595

169575

... More
15[a][i] Supply of 160sq.mm Annealed stranded copper jumper wire -[Large jumper] as per latest RDSOspecification. 3

-

604

75500

... More
15(a)(ii) Supply of 130 sq.mm Cadmium copper large span wire as per specification. 4

-

667

33350

... More
7 (e)Supply of 150 s.qmm (37/2.25 mm ) copper conductor (fedder wire)

-

621

18630

... More
15(a)(iv) Supply of 50 sq.mm Annealed Stranded Copper jumper wire as per specification.

-

576

6912

... More
15(a)(v) Supply of 150 sq.mm (37/2.25mm) Copper feeder jumper wire as per specification.

-

621

62100

... More
4(ax)(i) Supply of Stay & Bracket insulator set for item 4(a)(i) (iii) (v)

-

4255

395715

... More
4(axx) supply of Stay & Bracket composite type insulators (long creepage) for item 4(a)(i)/(iii)/(v) 3

-

4966

4966

... More
4(bx)(i)Supply of 9 ton insulator for item 4(b)(i) & (iii) 4

-

2299

2299

... More
4(bx)(ii)supply of 9 ton insulator for item 4(b)(i) (iii) for polluted zone 5

-

2759

2759

... More
8(bx)(i)Supply of 9 ton insulators for item no. 8(b)(i)/(ii) /(iii)/(v)/(vi)/(vii)/(viii)/(ix)

-

2299

11495

... More
8(bx)(ii)Supply of 9 ton insulators for item no.8(b)(i)/(ii) /(iii)/(v)/(vi)/(vii)/(viii)/(ix) for polluted zone 7

-

2299

13794

... More
9(ax)(I)Supply of 9 ton insulators for item no 9(a),(b),[c] 8

-

4599

4599

... More
11(ax)(i)Supply of 25 kV solid core insulators for item no 11(a)(i),(ii) 9

-

2299

39083

... More
11(ax)(ii)Supply of 25 kV solid core insulators for item no 11(a)(i),(ii) for polluted zone 10

-

2759

66216

... More
11(bx) supply of 25 kV Post insulator for 11(b) 11

-

2989

41846

... More
12(ax) Supply of bar insulator + 9 T Cut in Insulator for itemNo.12(a) 12

-

5748

22992

... More
13(ax) Supply of Post & Operating rod insulators for item 13(a) 13

-

7589

30356

... More
13(cx)Supply of Post & Operating rod insulators for item 13(c) 14

-

15178

30356

... More
28(X) Supply of 25 KV Post insulators for item 28.[ 2 Nos as one set ]

-

5979

5979

... More
8(bx)(ii)Supply of 9 ton insulators for Pollutted Zone item no 8(b) (i)/(ii)/(iii)/(v)/(vi)/(vii)/(viii)/(ix)

-

2759

2759

... More
12(e) Supply of Light Weight 25KV Section Insulator assembly for usage on high speed routes

-

224335

224335.5

... More
31(f)(i)Supply of Contact wire Splice 3

-

830

3320

... More
31(f)(ii)Supply of catenary wire Splice 4

-

327

1308

... More
31(f)(v) Supply of Large span wire ending clamp

-

379

2653

... More
Breaking of mass concrete by using pnematic breaker (tractor mounted) including disposal of debris outof the yard limits including crossing of tracks, rehandling etc., 6

-

9878

49390

... More
53 Transportation of released/New TrD materials 7

-

7

17514

... More
31(f)(iv) Supply of Anchor "V" Loop

-

610

2440

... More
27(a)(ii) Supply of 10 kVA, 25 kV/240 volts LT supply Transformers (Oil type) as per latest RDSOSpecification No. ETI/PSI/15 (11/92) or latest..

-

88628

88628

... More
28(a) Supply of link pull rod for 25 KV Drop Out fuse switch as per latest RDSO specification 10

-

4844

4844

... More
18(a) Supply of 25KV Vacuum Interrupters 11

-

268051

268051

... More
19(a)(i) Supply of 25 KV PT(Type-I) 12

-

56221

56221

... More
20(a) Supply of 42KV Lightning Arrestors 1 erection 8.13 Track 13

-

37422

37422

... More
31 f(i) Preparation of OHE Pegging plans, General supply arrangement diagram and sectioning diagrams

35828.91

35828

35828.91



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.