For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
AI Insights
Technical
Technical
Financial
Class Of Bidder
... View More
The class eligibility requirement to bid or participate in this tender is Grade "A" / 33KV or above.
Bid Capacity
... View More
The bid capacity required in the given tender can be calculated using the formula: Minimum Average Annual Contractual Turnover = V/N or V, whichever is less, where V = Advertised value of the tender in crores of Rupees and N = Number of years prescribed for completion of work for which bids have been invited. This formula is used to determine the minimum average annual contractual turnover, which is the bid capacity required.
Technical Capacity
... View More
The required prior work experience for the bidder includes successfully completing or substantially completing similar works during the last 07 years. The specific requirements are:
- Three similar works each costing not less than 30% of the advertised value of each component of the tender, - Two similar works each costing not less than 40% of the advertised value of each component of the tender, - One similar work costing not less than 60% of the advertised value of each component of the tender. For subletting of work, the subcontractor must have successfully completed at least one work similar to the work proposed for subcontract, costing not less than 35% of the value of the work to be subletted, in the last 5 years. However, for subletting of work costing up to Rs 50 lakh, no previous work experience of the subcontractor is required. The value of similar works completed should be considered as follows:
- If the final bill of similar nature of work has not been passed and final measurements have not been recorded, the paid amount including Statutory Deduction will be considered.
- If final measurements have been recorded and work has been completed with negative variation, then also the paid amount including Statutory Deduction will be considered.
- If final measurements have been recorded and work has been completed with positive variation but variation has not been sanctioned, original agreement value or last sanctioned agreement value whichever is lower shall be considered for judging eligibility. A payment of 90% or more of the contract value is mentioned as a criterion for substantially completed work. The average annual turnover of Rs 500 crore is mentioned as a requirement for a Public listed company. The amount of Rs 50 lakh is mentioned as the threshold for not requiring previous work experience for subletting.
Costs
EMD
₹ 2,56,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
GNT-E-20-GS-TRD-2024-25-GUNTUR DIVISION-ELECTRICAL/SOUTH CENTRAL RLYTender No
GNT-E-20-GS-TRD-2024-25Tender Authority
South Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
4.(a)(i) Supply without insulator and erection of single bracket assembly for conventional OHE.
-
-
2165948.93
... More
9.a Supply without Insulators and erection of anti-creep with galvanized steel wire for conventional OHE.
-
-
216083.37
... More
11.a.(i) Supply without Insulators and erection of anti-creep with galvanized steel wire for conventional OHE.
-
-
64963.85
... More
16.a Supply and erection of structure bonds 10
-
-
9
... More
16.a.a Drilling holes in the rails 11
-
290
356.72
... More
17.a Supply and erection of Earth electrode. 12 31 a 168.00 Each 564.00 94752.00 356.72 432751.33
-
-
106013.85
... More
41. Supply and erection of caution boards for 25 KV AC traction 32 3 a 41.00 MT 457.00 18737.00 356.72 85575.63 19
-
-
65767.68
... More
3(a) Supply of Traction masts and main masts of switching stations, LT supply transformer station and booster transformer station as per RDSO drawings and IS Specifications.
41
57487
4969429.22
... More
3(b) Supply of fabricated steel work other than masts such as TTC's portal sets (with all components) as per RDSO drawings and IS specifications.
15
58612
1853663.11
... More
3(c) Supply of fabricated steel work other than masts such as TTC's portal sets (with all components) as per RDSO drawings and IS specifications.
5
59737
629747.45
... More
4(ax)(i) supply of insulators for item 4(a)(I) (iii) (v) 2
-
-
18
... More
4(bx)(i) supply of 9 ton insulator for item 4(b)(I) (iii)
-
-
18
... More
Supply of 5mm dia droppers with dropper clips as per latest RDSO specifications. 2
1360
100
398942.4
... More
Re-adjustment of OHE spans including erection of droppers. 3
168
1000
492811.2
... More
3.Re adjustment of OHE spans including erection of droppers under power block. 4
168
1000
492811.2
... More
4. Dismantlement of existing droppers. 5
1360
200
797884.8
... More
5. Dismantlement of existing droppers under power block.
1360
200
797884.8
... More
6 Supply, fabrication and erection of cleat on PF wall with suitable bolts and nuts, cleating by duly making drilling of holes in rocky / non rocky surface and filling of holes with epoxy resin before provision of cleat bolts.
40
450
18000
... More
7. Cutting of top tiles/granite of PF and making of trench by chipping the PF concrete surface and grouting of bond with cement, sand mixture inside the trench and plastering/laying of removed cut pieces of tiles/granite neatly.
40
420
16800
... More
1 Supply, testing and commissioning of Heavy-duty Pillar type rotary Drilling Machine,
3
105932
374999.28
... More
Supply, testing and commissioning of Portable inflatable emergency lighting system consists of inbuilt Genset of 1.2 KV. Generator Power Output : 1200VA; Fuel Tank Capacity: 8.0 Liter; Lamps Lumens: 42000 lumens; System shall be suitable for continuous running: 8 hrs.
4
133900
632008
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%