South Central Railway Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
South Central Railway - SCR Tender
Civil And Construction
Civil Works Others
Ireps
+4Khammam, TelanganaJagitial, TelanganaNizamabad, TelanganaKarim Nagar, Telangana
Opening Date14 Aug 2024
Closing Date9 Sep 2024
Tender Amount₹ 18,53,031.68
Costs
EMD
₹ 37,100Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Sc Division: 1. Provision Towards Trd Modification At Lc No.2 Between Dkj-pcz Of Dkj- mugr Section On Sc Division. 2. Provision Towards Trd Modification At Lc No.4
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
C-E29-TRD-25-2024-25-SECUNDERABAD DIVISION-ELECTRICAL/SOUTH CENTRAL RLYTender No
C-E29-TRD-25-2024-25Tender Authority
South Central Railway ViewPurchaser Address
-Website
http://ireps.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
3(c)Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc
-
-
5758.91
... More
32/3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station.
-
-
5650.62
... More
32/3(c)Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc
-
-
5758.91
... More
33/3(a)Extra on erection rate for steel work done manually under item No. 3(a)
-
-
2819.13
... More
3(a)Supply of Traction masts and main masts of switching stations, LT supply transformer station and booster transformer station as per latest RDSO drawings and IS specifications
-
-
311608.28
... More
3(c): Supply of facricated steel work other than masts, TTC, Portals such as SPS, special fabricated steel etc.
-
-
65202.94
... More
2(a)(i) Concrete for foundations and plinth in hard soil
-
-
22119.55
... More
2(b) Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts)
-
-
38688.96
... More
3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station.
-
-
5650.62
... More
3(c)Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc
-
-
5758.91
... More
32/3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station.
-
-
5650.62
... More
32/3(c)Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc
-
-
5758.91
... More
33/3(a)Extra on erection rate for steel work done manually under item No. 3(a)
-
-
2819.13
... More
3(a)Supply of Traction masts and main masts of switching stations, LT supply transformer station and booster transformer station as per latest RDSO drawings and IS specifications
-
-
311608.28
... More
3(c) Supply of fabricated steel work other than masts, TTC, Portals such as SPS, special fabricated steel etc.
-
-
65202.94
... More
2(a)(i) Concrete for foundations and plinth in hard soil
-
-
22119.55
... More
2(b) Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts)
-
-
38688.96
... More
3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station.
-
-
5650.62
... More
3(c)Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc
-
-
5758.91
... More
32/3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station.
-
-
5650.62
... More
32/3(c)Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc
-
-
5758.91
... More
33/3(a)Extra on erection rate for steel work done manually under item No. 3(a)
-
-
2819.13
... More
3(a)Supply of Traction masts and main masts of switching stations, LT supply transformer station and booster transformer station as per latest RDSO drawings and IS specifications
-
-
311608.28
... More
3(c) Supply of facricated steel work other than masts, TTC, Portals such as SPS, special fabricated steel etc.
-
-
65202.94
... More
2(a)(i) Concrete for foundations and plinth in hard soil
-
-
22119.55
... More
2(b) Concrete for foundations and plinth in other than hard soil and rock (including foundation for AT/BT masts)
-
-
38688.96
... More
3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station.
-
-
5650.62
... More
3(c)Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc
-
-
5758.91
... More
32/3(a)Erection of Traction masts and Main masts of Switching stations and LT supply Transformer station.
-
-
5650.62
... More
32/3(c)Erection of Fabricated Small Part Steel work other than mast, TTC's, Portals, etc
-
-
5758.91
... More
33/3(a)Extra on erection rate for steel work done manually under item No. 3(a)
-
-
2819.13
... More
3(a)Supply of Traction masts and main masts of switching stations, LT supply transformer station and booster transformer station as per latest RDSO drawings and IS specifications
-
-
311608.28
... More
3(c) Supply of facricated steel work other than masts, TTC, Portals such as SPS, special fabricated steel etc.
-
-
65202.94
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements