For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Opening Date17 Sep 2019
Closing Date24 Sep 2019
Tender Amount₹ 21,20,00,000 
Notes
Download

Costs

Summary

Construction Of (400) Urban (g+2) 2bhk Houses At Knanapur In Khanapur

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE

-

-

-

... More
Columns - C1

-

-

-

... More
Columns - C2

-

-

-

... More
Columns - C3

-

-

-

-

-

-

... More
BLD-CSTN-2-1 (9): Earth work excavation for foundation trenches in ordinary soils up to 3.00m depth by manual means excluding dewatering and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work etc as per SS - 20 B (APSS 308).

-

-

-

... More
For Footings F1

28.8

-

-

... More
For Footings F2

104.04

-

-

... More
For Footings F3

45.41

-

-

... More
BLD-CSTN-2-8 (16) : Filling with Sand as levelling course for Footings with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

-

-

-

... More
For Footings F1

2.4

-

-

... More
For Footings F2

8.67

-

-

... More
For Footings F3

3.78

-

-

... More
BLD-CSTN-3-6 (23) -Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

-

-

-

... More
For Footings F1

1.6

-

-

... More
For Footings F2

5.78

-

-

... More
For Footings F3

2.52

-

-

... More
for Flooring Bed

-

-

-

... More
Living

4.29

-

-

... More
C.Bed Room

3.36

-

-

... More
M.Bed Room

3.03

-

-

... More
Kitchen

1.34

-

-

... More
A. Toilet

0.65

-

-

... More
C. Toilet

0.82

-

-

... More
Wash Area

0.76

-

-

... More
Utility

0.99

-

-

... More
Inside Passage area

3.14

-

-

... More
Inside Passage area

2.96

-

-

... More
BLD-CSTN-2-9 (17): Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

-

-

-

... More
for filling basement

-

-

-

... More
Living

15.02

-

-

... More
C.Bed Room

11.74

-

-

... More
M.Bed Room

10.59

-

-

... More
Kitchen

4.69

-

-

... More
A. Toilet

2.28

-

-

... More
C. Toilet

2.87

-

-

... More
Wash Area

2.66

-

-

... More
Utility

3.47

-

-

... More
Inside Passage area

10.98

-

-

... More
Inside Passage area

10.37

-

-

... More
BLD-CSTN-2-9 (17): Filling with useful gravel (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

-

-

-

... More
For Footings (Refilling)

-

-

-

... More
Total excavation quantity

178.25

-

-

... More
Deductions

-

-

-

... More
For CC Bed under Footing F1

-1.6

-

-

... More
For CC Bed under Footing F2

-5.78

-

-

... More
For CC Bed under Footing F3

-2.52

-

-

... More
For Footing F1

-5.2

-

-

... More
For Footing F2

-17.1

-

-

... More
For Footing F3

-8.31

-

-

... More
Pedestal

-3.69

-

-

... More
Columns- Below ground level

-

-

-

... More
Columns- C1

-1.26

-

-

... More
Columns -C2

-0.18

-

-

... More
Columns - C3

-0.18

-

-

... More
Deduct for available excavated earth (178.25-74.67)

-103.58

-

-

... More
BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 330Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 330 Kgs/ Cum the defference in cost shall be deducted. For Footings.

-

-

-

... More
For Footings F1

5.83

-

-

... More
For Footing F2

17.1

-

-

... More
For Footing F3

7.7

-

-

... More
BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 330Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 330 Kgs/ Cum the defference in cost shall be deducted. For Pedestals.

-

-

-

... More
Pedestal

2.77

-

-

... More
BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 330Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 330 Kgs/ Cum the defference in cost shall be deducted. For Plinth Beams.

-

-

-

... More
Plinth Beam

-

-

-

... More
Building Outer Long walls

4.12

-

-

... More
Building inner Long walls

2.06

-

-

... More
Building OuterShort walls

3.31

-

-

... More
Building Inner Short walls

1.66

-

-

... More
Building Inner Short walls

1.16

-

-

... More
Building Inner Short walls Kitchen & Wash area

0.58

-

-

... More
Building Inner Short walls Kitchen & C. Toilet

0.76

-

-

... More
Building inner Short walls M.Bed room, A. Toilet

0.76

-

-

... More
Building internal short walls - A. Toilet & C. Toilet

0.63

-

-

... More
Building internal short walls - A. Toilet

0.3

-

-

... More
Deduct for Columns

15.34

-

-

... More
Columns- C1

-0.58

-

-

... More
Columns -C2

-0.08

-

-

... More
Columns - C3

-0.08

-

-

... More
BLD-CSTN-3-15-(31) - B : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales and other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers vibrating, approved by the department including pumping for RCC COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 330Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 330 Kgs/ Cum the defference in cost shall be deducted. For Columns. (Ground Floor).

-

-

-

... More
COLUMNS GROUND FLOOR

-

-

-

... More
Below GL

-

-

-

... More
Columns- C1

1.55

-

-

... More
Columns -C2

0.22

-

-

... More
Columns - C3

0.22

-

-

... More
Above GL upto bottom ofPlinth beam

-

-

-

... More
Columns- C1

0.38

-

-

... More
Columns -C2

0.04

-

-

... More
Columns - C3

0.04

-

-

... More
Above Plinth beam to bottom of Roof beam

-

-

-

... More
Columns- C1

5.31

-

-

... More
Columns -C2

0.76

-

-

... More
Columns - C3

0.76

-

-

... More
BLD-CSTN-3-15-(31) - B : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales and other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers vibrating, approved by the department including pumping for RCC COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 330Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 330 Kgs/ Cum the defference in cost shall be deducted. For COLUMNS (First Floor).

-

-

-

... More
COLUMNS FIRST FLOOR

-

-

-

... More
Above GF Roof beam to bottom of FF Roof beam

-

-

-

... More
Columns- C1

2.5

-

-

... More
Columns -C2

1.92

-

-

... More
Columns - C3

2.39

-

-

... More
BLD-CSTN-3-15-(31) - B : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales and other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers vibrating, approved by the department including pumping for RCC COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 330Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 330 Kgs/ Cum the defference in cost shall be deducted. For LINTELS (Ground Floor).

-

-

-

... More
For Lintels GROUND FLOOR

-

-

-

... More
Over Main Door & Window W1

0.23

-

-

... More
Over Doors D1

0.14

-

-

... More
Over Doors D2

0.13

-

-

... More
Over Windows W1

0.43

-

-

... More
Over Windows W2

0.05

-

-

... More
For Lintels FIRST FLOOR

0.98

-

-

... More
BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including sales & other taxes on all materials,all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vicbrating,curing etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. , 402)with minimum cement content as per IS code for RCC ROOF BEAMS. Note : 1) The cement content is adopted as 330Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 330 Kgs/ Cum the defference in cost shall be deducted. For Roof Beams (Ground Floor).

-

-

-

... More
Roof Beams GROUND FLOOR

-

-

-

... More
Building Outer Long walls

4.71

-

-

... More
Building inner Long walls

2.06

-

-

... More
Building Outer Short walls

3.15

-

-

... More
Building Inner Short walls

1.57

-

-

... More
Building Inner Short walls

0.29

-

-

... More
Building Inner Short walls Kitchen & Wash area

0.58

-

-

... More
Building inner Short walls M.Bed room, A. Toilet, Kitchen

1.52

-

-

... More
Stair Case Roof level beam

0.14

-

-

... More
Deduct for Columns

14.02

-

-

... More
Columns- C1

-0.58

-

-

... More
Columns -C2

-0.08

-

-

... More
Columns - C3

-0.08

-

-

... More
Roof Beams FIRST FLOOR

-

-

-

... More
Building Outer Long walls

2.06

-

-

... More
Building inner Long walls

1.57

-

-

... More
Building OuterShort walls

1.57

-

-

... More
Building Inner Short walls

1.57

-

-

... More
Building Inner Short walls

0.29

-

-

... More
Stair Case Roof level beam

0.14

-

-

... More
Deduct for Columns

7.22

-

-

... More
Columns- C1

-0.58

-

-

... More
Columns -C2

-0.08

-

-

... More
Columns - C3

-0.08

-

-

... More
BLD-CSTN-5-17-(55) : Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 150 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqcm for walls for Superstructure Walls. from Plinth beam level to Roof Level

-

-

-

... More
Brick work Above GL to bottom of Plinth beam

-

-

-

... More
Building Outer Long walls

1.34

-

-

... More
Building inner Long walls

0.67

-

-

... More
Building OuterShort walls

1.03

-

-

... More
Building Inner Short walls

0.51

-

-

... More
Building Inner Short walls

0.38

-

-

... More
Building Inner Short walls Kitchen & Wash area

0.19

-

-

... More
Building Inner Short walls Kitchen & C. Toilet

0.25

-

-

... More
Building inner Short walls M.Bed room, A. Toilet

0.25

-

-

... More
Building internal short walls - A. Toilet & C. Toilet

0.2

-

-

... More
Building internal short walls - A. Toilet

0.1

-

-

... More
Deduct for Columns

4.92

-

-

... More
Columns- C1

-0.29

-

-

... More
Columns -C2

-0.04

-

-

... More
Columns - C3

-0.04

-

-

... More
Brick work Above Plinth beam GROUND FLOOR

-

-

-

... More
Building Outer Long walls

12.33

-

-

... More
Building Outer Long walls

5.2

-

-

... More
Building Outer Short walls

11.13

-

-

... More
Deductions

28.66

-

-

... More
For Columns

-3.47

-

-

... More
Deduct Wash area openings

-1.05

-

-

... More
Deduct for Main Door

-1.27

-

-

... More
Deduct for Windows W1

-3.93

-

-

... More
Deduct for Windows W2

-0.5

-

-

... More
For Lintels

-

-

-

... More
Over Main Door & Window W1

-0.23

-

-

... More
Over Windows W1

-0.54

-

-

... More
Over Windows W2

-0.11

-

-

... More
For First Floor

17.56

-

-

... More
BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 112/100 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.

-

-

-

... More
For GROUND FLOOR

-

-

-

... More
Building inner Long walls between C. Bed and M bed room

3.36

-

-

... More
Building inner Short walls Middle wall of C.Bed Room and Living room

3.03

-

-

... More
Building inner Short walls M.Bed room, Kitchen

6.05

-

-

... More
Building inner Shortbetween Living, Kitchen

2.23

-

-

... More
Building internal Long walls Between- A. Toilet, C. Toilet

2.01

-

-

... More
Building internal Short walls - A. Toilet

2.35

-

-

... More
Building internal Short walls - C. Toilet

2.46

-

-

... More
Wash Area Middle wall

2.01

-

-

... More
Stair case area

1.43

-

-

... More
Stair case parapet wall at mid landing

0.76

-

-

... More
kitechen plotform wall

0.16

-

-

... More
Parapet walls

0.16

-

-

... More
Deduction for openings

26

-

-

... More
Room Doors - D1

-2.17

-

-

... More
A.Toilet and C. Toilet Door - D2

-1.21

-

-

... More
Wash Area Door - D2

-0.6

-

-

... More
Ventilators - V1

-0.14

-

-

... More
Deduct for Columns

-0.33

-

-

... More
For Lintels

-

-

-

... More
Over Doors D1

-0.14

-

-

... More
Over Doors D2

-0.13

-

-

... More
For FIRST FLOOR

21.28

-

-

... More
For PARAPET WALL First Floor

6.21

-

-

... More
BLD-CSTN-3-16-(31)-C : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including sales & other taxes on all materials,all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vicbrating,curing etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. , 402)with minimum cement content as per IS code for RCC SLABS, BEAMS Note : 1) The cement content is adopted as 330Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 330 Kgs/ Cum the defference in cost shall be deducted. For Roof Slab.

-

-

-

... More
100mm thick roof slab GROUND FLOOR

-

-

-

... More
Total Building area - A

240.72

-

-

... More
Deductions

-

-

-

... More
Openings

-31.37

-

-

... More
Openings

-5.78

-

-

... More
Openings

-8.4

-

-

... More
100mm thick roof slab FIRST FLOOR

195.17

-

-

... More
Stair case waist slab ( GF to FF) 1st & 2nd flaight

7.7

-

-

... More
Mid landing

2.31

-

-

... More
Stair case Mid Beam beam

0.17

-

-

... More
Stair case waist slab ( FF to SF) 1st & 2nd flaight

7.7

-

-

... More
Mid landing

2.31

-

-

... More
Stair case Mid Beam beam

0.17

-

-

... More
BLD-CSTN-3-15-(31) - B : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20 mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales and other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code from standard suppliers vibrating, approved by the department including pumping for RCC COLUMNS, LINTELS, WATER TANKS, RCC WALLS IN BUILDINGS. Note : 1) The cement content is adopted as 330Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 330 Kgs/ Cum the defference in cost shall be deducted. For SUN SHADES & CHAJJAS.

-

-

-

... More
Sun shades of 0.60 Mts wide and 75mm thick at fixed end and 50mm thick at free end - GROUND FLOOR.

-

-

-

... More
Over W1

24

-

-

... More
Over W2

4.8

-

-

... More
Over V

9.6

-

-

... More
Lofts in the M. Bed Rooms

11

-

-

... More
Lofts in the C. Bed Rooms

11.6

-

-

... More
Lofts in the Kitchens

7.32

-

-

... More
Sun shades of 0.60 Mts wide and 75mm thick at fixed end and 50mm thick at free end - FIRST FLOOR.

-

-

-

... More
BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS. Note : 1) The cement content is adopted as 330Kg/cum for estimating purpose only.The exact quantities will be as per mix design. 2) As per mix design, if the cement content is found to be less than 330 Kgs/ Cum the defference in cost shall be deducted.

-

-

-

... More
RCC Steps for two flights (GF & FF)

6.6

-

-

... More
BLD-CSTN-8-9: Plastering 12mm thick in two coats for weather exposed exterior walls using screened sand with base coat of 8mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) . (For External walls).

-

-

-

... More
External all round the building - GROUND FLOOR

347

-

-

... More
Passage walls

5.67

-

-

... More
Mid Landing wall

1.89

-

-

... More
Sun Shades W1

28.8

-

-

... More
Sun Shades W2

5.76

-

-

... More
Sun Shades V

11.52

-

-

... More
DEDUCTIONS

400.64

-

-

... More
Main Doors - D1

-8.47

-

-

... More
Room Windows- W1

-25.92

-

-

... More
Kitchen Windows- W2

-3.24

-

-

... More
Ventilators - V

-1.44

-

-

... More
Wash area openings

-14.13

-

-

... More
External all round the building - FIRST FLOOR

347.44

-

-

... More
Parapet wall alround-Second Floor

62.08

-

-

... More
BLD-CSTN-8-9: Plastering 12mm thick in two coats for weather exposed exterior walls using screened sand with base coat of 8mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) . (For Internal walls).

-

-

-

... More
Internal plastering GROUND FLOOR

-

-

-

... More
Living

119.68

-

-

... More
C.Bed Room

129.11

-

-

... More
M.Bed Room

122.31

-

-

... More
Kitchen

81.32

-

-

... More
A.Toilet

57.87

-

-

... More
C.Toilets

65.76

-

-

... More
wash Area

63.46

-

-

... More
kitchen plotform wall

3.24

-

-

... More
DEDUCTIONS

-

-

-

... More
Main Door -MD

-8.47

-

-

... More
Room Doors - D1

-43.43

-

-

... More
Room Windows- W1

-25.92

-

-

... More
Kitchen Windows- W2

-3.24

-

-

... More
Ventilators - V

-1.44

-

-

... More
Toilet Doors -D2

-24.14

-

-

... More
Wash area opening

-14.12

-

-

... More
Ceiling Ground Floor

-

-

-

... More
Living

42.9

-

-

... More
C.Bed Room

33.55

-

-

... More
M.Bed Room

30.25

-

-

... More
Kitchen

13.38

-

-

... More
A.Toilet

6.48

-

-

... More
C.Toilets

8.38

-

-

... More
wash Area

7.05

-

-

... More
Inside Passgae area

23.1

-

-

... More
Internal plastering FIRST FLOOR

687.09

-

-

... More
BLD-CSTN 12-4: Painting to walls with snowcem or other equal and approved waer proof Cement paint , two coats (All colours). For Exterior of the Building.

-

-

-

... More
External all round the building -

-

-

-

... More
Quantity as per External Plastering GF

347.44

-

-

... More
Quantity as per External Plastering FF

347.44

-

-

... More
Parapet wall

62.08

-

-

... More
BLD-CSTN-11-4- (161): White washing Two coat with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials

-

-

-

... More
Inner walls of the house

-

-

-

... More
Quantity as per Internal Plastering GF

687.09

-

-

... More
Quantity as per Internal Plastering FF

687.09

-

-

... More
BLD-CSTN-10-25-(148):Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

-

-

-

... More
Total Building area - A

240.72

-

-

... More
Deductions

-

-

-

... More
Openings

-15.69

-

-

... More
Openings

-5.78

-

-

... More
Openings

-8.4

-

-

... More
Qty as per Slab area

210.85

-

-

... More
BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126

-

-

-

... More
Footings

918.9

-

-

... More
Pedestal

83.1

-

-

... More
Coloumns

2815.75

-

-

... More
Plinth Beam

2189.22

-

-

... More
Roof beams

3949.56

-

-

... More
100 mm Thick Slab

2732.38

-

-

... More
Stair case waist slab

140.14

-

-

... More
Stair case mid landing beam

51

-

-

... More
Sun shades

307.44

-

-

... More
Lintels

196

-

-

... More
Supply and fixing of Steel Glazed Window with double openable on both sides centrally fixed post and MS Window Section of E Z 7 with lugs, glazing clips with other fittings and their fixtures including supplying and fixing of 10 mm square bars @ 10cm c/c as per approved design with cost and conveyance of all materials and labour charges including 4mm thick pin headed glass and approved fixtures like MS Z shaped hold fast, lugs, tower bolts, etc., complete for finishing item of work complete as directed by the department .

-

-

-

... More
Windows W1

51.84

-

-

... More
Windows W2

5.47

-

-

... More
Supply & fixing of Mild Steel Hallow single rebate general purpose door frames manufactured using cold roll formed process steel sheet of 1.25 mm thick bright (Cold Rolled Close Annealed (CRCA) and profile-B of size 105 x 60 mm conforming to IS 4351 - 2003 including pretreatment, phosphating with Hinges, Base Ties, Holdfast Lugs, Mortar Guards, shock absorbers and provision for Tower Bolts, Aldrops, Lock & Strike plates etc. for both single and double shutter doors with hinges tower bolts etc including cost of conveyance loading and unloading etc.,.

-

-

-

... More
Main doors- D1

40.16

-

-

... More
Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick CRCA section, size should be 50 x 75 mm with 32 mm rebate. The corner of the frame should be welded. The frame should be painted with one coat of primer and finished painted with pure polyester paint. The frame should be provided with approved quality butt hinges of 3 Nos. Complete for finished item of work.: Single shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x 75 mm ( TBSC-L.I-09)

-

-

-

... More
Internal Bed Room doors- D1

116.88

-

-

... More
Internal Bed Room doors- D2

113.28

-

-

... More
Supply and fixing of 25 mm thick Flush Door shutter solid bond wood block board type with commercial ply on both faces with 1no. 300 mm long Aldrop, 2 nos. 125 mm lond door handle, 1 no. 150 mm long tower bolt, 1 no. 250 mm long door latch 1 No. door stopper ( all fixturs MS Powder coated ) including c/c of all materials and labour chrges etc., complete

-

-

-

... More
Main doors- D1

13.18

-

-

... More
Supply and fixing of Cement Bonded Prelaminated Particle Board door shutter made out of U section of size 12x14x12 made from 6 mm thick pps sections with 16MM Cement Bonded Prelaminated Particle Board with necessary screws fixed at every 1'.0" interwells. The hardware consists of 250mm long Aldrop - 2 Nos. 150mm Handle- 1 No, 150mm long ms powder coated tower bolt 1 no. nickel coated. The cost is inclusive of all incidentals, labor transportation charges. (TBSC-H.IV-19)

-

-

-

... More
Internal Bed Room doors- D1

39.53

-

-

... More
Supply and fixing of Cement bonded Particle BOARD (conforming to IS 14862) 12mm thick door shutter of size 6'0" x 2'6" with all-round style "U'' lipping size 15 x 14x 15 mm made from 8 mm thick powder coated cold rolled steel profiles with necessary screws fixed at 1'-0" interval 250 mm long Aldrops 2 nos. M.S. nickel coated 250 mm long 1 no. M.S. Tower Bolts Including cost and conveyance of all materials at site and applying 1 coat of primer, 2 coats of luppum and 2 coats of synthetic enamel paint as per approved design for finished item of work. (TBSC-H.IV-20)

-

-

-

... More
Toilet, bath and Kitchen doors- D3

33.38

-

-

... More
Supply, delivery and fixing of 50mm thick Cement Jali of size 0.90x0.45 m for Ventilator including all labour charges etc., complete

-

-

-

... More
Ventilators - V1 - 0.6 x 0.5 - GF

2.88

-

-

... More
BLD-CSTN-9-6-(104) : Flooring with Vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. (For Flooring) ., complete for finished item of work. (As per SS 903).

-

-

-

... More
Ground floor

-

-

-

... More
Living

42.9

-

-

... More
C.Bed Room

33.53

-

-

... More
M.Bed Room

30.25

-

-

... More
Kitchen

13.37

-

-

... More
wash Area

6.94

-

-

... More
Internal utility area

9.92

-

-

-

-

-

... More
Main Door -MD Sills

0.43

-

-

... More
Doors - D1

1.1

-

-

... More
Doors- D2

1.09

-

-

... More
First Floor

139.53

-

-

... More
BLD-CSTN-9-6-(104) : Flooring with ceramic tiles (Non skid type), set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. (For Toilets and baths).

-

-

-

... More
Ground floor

-

-

-

... More
A.Toilets

7.25

-

-

... More
C. Toilets

9.62

-

-

... More
First Floor

16.87

-

-

... More
BLD-CSTN-9-18-(116) see Ref:9-23-(121-b) : Dadooing to walls with Glazed colour tiles of any size 1st quality set over a base coat of CM(1:3) Prop. 12mm thick and neat Gray cement slurry of Honey like consistancy sread at the rate of 3.30 Kg of cement per One Square Meter and jointed wiyh neat White cement paste mixed with pigmant of matching shade including cost and conveyance of all materials like cement, sand, water, flooring Tiles etc. to site, all operational, incidental and labour charges such as mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work (for toilets and bath).

-

-

-

... More
Ground Floor

-

-

-

... More
A.Toilets

23.04

-

-

... More
C. Toilets

27.84

-

-

... More
First Floor

50.88

-

-

... More
BLD-CSTN-12-12-(193) : Painting with Synthetic Enamel paints - One Coat - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).

-

-

-

... More
For Ground Floor and First Floor

-

-

-

... More
Main Door -D1

38.13

-

-

... More
Windows-W1

142.56

-

-

... More
Kitchen Window-W2

15.05

-

-

... More
Supply and fixing of 40mm thick polished block kadapa/shabad stone for platform including labour charges for lifting and fixing the stone in position at all levels.

-

-

-

... More
for kitchen platform

8.64

-

-

... More
Total of - A

-

-

-

... More
Internal Electrification

-

-

-

... More
BLD-ELEC-1-4.2 .c : Supply and Fixing of 25mm dia 2mm thick PVC pipe (ISI MARK) concealed in Roof Slabs with all required accessories including masonary work and labour charges etc., complete.

-

-

-

... More
for Circuite wiring for Switch board to all rooms

-

-

-

... More
In Roof Slab along the length

200

-

-

200

-

-

... More
BLD-ELEC-1-4.1 (b) :Supply and Fixing of 20mm dia1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.

-

-

-

... More
Living room

80

-

-

... More
C.Bed room

40

-

-

... More
M.Bed room

40

-

-

... More
Kitchen

40

-

-

... More
A.Toilet

40

-

-

... More
C.Toilet

40

-

-

... More
Wash area

40

-

-

... More
Passage area

5

-

-

... More
BLD-ELEC-2.1.7 : Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges without 40W bulb (for new installation).

-

-

-

... More
Ceiling Fan points

40

-

-

... More
CFL Light point

48

-

-

... More
Wall mounted lights/ tube lights

48

-

-

... More
Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Residential Buildings.

-

-

-

... More
Ceiling Fan points

40

-

-

... More
CFL Light point

48

-

-

... More
Wall mounted lights/ tube lights

48

-

-

136

-

-

... More
BLD-ELEC-2-1-4 : Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.

-

-

-

... More
Living Room & (2) Bed rooms

40

-

-

... More
Kitchen and wash area

16

-

-

56

-

-

... More
BLD-ELEC-2-1-5 : Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet covered board including earth connection and all labour charges etc., complete on wall.

-

-

-

... More
Living, C. bed room, M. bed room & Kitchen

40

-

-

... More
BLD-ELEC -3.1.2 : Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.

-

-

-

... More
6A 3 pin wall plug socket with 6A switch

400

-

-

... More
16A 3pin / 6A 3pin plug socket

160

-

-

... More
add extra

56

-

-

616

-

-

... More
BLD-ELEC-3.1.4 ; Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

-

-

-

... More
for Total House

200

-

-

... More
6.1.3 : Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.

-

-

-

... More
From Individual House board to Pole

48

-

-

... More
BLD-ELEC-5-1 : Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

-

-

-

... More
for Total house

4

-

-

... More
BLD-ELEC-2.4.2:Supply and erection of Panel mounting cubical type 30/32A TPN 415V,50Hz switch disconector fuse unit complete with front drive mechanism with door inter lock, pad locking arrangements etc complete with fuse links on existing control panel.

-

-

-

... More
For House

8

-

-

... More
B. Total of internal electrification

-

-

-

... More
Water Supply and Sanitary arrangements

-

-

-

... More
Supplying & Fixing 76.20mm (3") CI Nahany trap 1st quality with CP grating, black painted for all floors including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work.

-

-

-

... More
A.Toilets, C . Toilets, Kitchen & Wash

32

-

-

... More
S & F tested NP bib taps at all levels of size 12.70mm dia of Indian make first quality including cost and conveyance of all materials, labour charges etc., complete for finished item of work in all floors.

-

-

-

... More
250 grams (short) -in Kitchen , wash area & A.toilets. C.Toilets

32

-

-

... More
Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping.

-

-

-

... More
For Ground floor

12

-

-

... More
Providing 110 mm Dia ISI marked P.V.C.down water take pipes 2.5mm thick 4kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., complete for finished item of work. (APSS No. 1328)

-

-

-

... More
110mm dia(4") dia

24

-

-

... More
Supplying & fixing GI pipe Medium Grade as per IS 1239 ISI mark in ground or on wall including cost of tees, elbows, bends, reducers, couplings, running joints, union flanges, unions etc. with necessary excavation in all types of soils except rock requiring blasting, refilling, chasing masonry walls and making good the walls & floors to the originals, surface and fixing MS clamps of TW block on walls, including cost and conveyance of all materials and labour charges complete for finished item of work.

-

-

-

... More
15 mm dia nominal Distribution from connected to 20mm dia pipe from FF floor to Kitchen & toilets

40

-

-

... More
20 mm dia nominal from Bore to storage tank

40

-

-

... More
25 mm dia nominal bore

40

-

-

... More
Supplying & Fixing tested gun metal peet valve ISI mark make as approved by Engineer, screw type 1st quality of approved type including cost and conveyance of all materials & labour charges at all levels in all floors for following.

-

-

-

... More
For 25mm dia GI pipe

8

-

-

... More
Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg. (TBSP-B.II-02)

-

-

-

... More
for sewer connections

4

14688

3672

... More
Supply & fixing 630 mm x 450mm size white virerous orissa pan with attached footrests of approved make confirming to IS 2556 (part - 3-2004) with 'P' or 'S' trap, including 10 lit. low level PVC flusihing systerm confirming to IS 7231 with all internal fittings, CI brackets, 32mm dia CP flush pipe, 15mm dia 450mm long PVC connerctor, 15mm dia Cp brass strop cock 300 grams of ISI make, cutting and making good the walls and floors wherever required including cost & conveyance of all material to work site, all labour charges for all operations for fixing etc., complete for finished item of work.

-

-

-

... More
WC for C. Toilet

8

-

-

... More
Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of Hindustan / Neycer or Parryware make white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and PVC low level system parryware, slimline with internal components & short bend : 10 Ltrs. capacity single flush tank of Parryware or equivalent with internal components and fixed using required size of nails and screws, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 of first quality Indian make heavy duty Seiko/Senior/Nice or equivalent, 15mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

-

-

-

... More
EWC for Bath.

8

-

-

... More
Providing & fixing UPVC SWR pipes TYPE-B conforming to IS 13592:1992 including necessary specials,jointing with adhesives ,fixing vertical pipes over wooden battens including cost and conveyance of all materials at site complete for finished item of work

-

-

-

... More
110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/Sudhakar or any ISI Brand

24

-

-

... More
Providing & fixing UPVC SWR pipes TYPE-B conforming to IS 13592:1992 including necessary specials,jointing with adhesives ,fixing vertical pipes over wooden battens including cost and conveyance of all materials at site complete for finished item of work

-

-

-

... More
75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm - Prince/Sudhakar or any ISI Brand

24

-

-

... More
C.Total of Water Supply & Sanitary

-

-

-

... More
Total Estimate (A. Building+B Electrical+C.Water supply )

-

-

-

... More
Add for Vat @ 5%

-

-

-

... More
Provision for unforeseen items

-

-27

-

... More
Total Rs.

-

-

-

... More
Cost of 1 Dwelling Units

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.