Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Roads And Buildings Department Tender
Civil And Construction
Road Construction
Opening Date31 Jul 2024
Closing Date3 Aug 2024
Tender Amount₹ 3,85,380
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
532447Bid Award Id
ViewTender No
DB/HD/03/2024-25/4, Dt: 27.07.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
A.M. to R and B Chinnambavi Section Package II roads;Painting and lettering to 5th K.M stones including cost of paint and labour chrges etc, complete for finished itme of work. On Pentlavelly "X" road to Sreerangapur via Thoomukinta road from km 6/5 to 11/0 & 24/300 to 28/160
2
1231
2462
A.M. to R and B Chinnambavi Section Package II roads;Manufacturing supplying and fixing of Kilometer stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (H.M stones) on Pentlavelly "X" road to Sreerangapur via Thoomukinta road from km 6/5 to 11/0 & 24/300 to 28/160
12
1398
16776
A.M. to R and B Chinnambavi Section Package II roads;Manufacturing supplying and fixing of Kilometer stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (K.M stones) on Pentlavelly "X" road to Sreerangapur via Thoomukinta road from km 6/5 to 11/0 & 24/300 to 28/160
2
2440
4880
A.M. to R and B Chinnambavi Section Package II roads;Manufacturing supplying and fixing of Kilometer stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (5th K.M stones) on Pentlavelly "X" road to Sreerangapur via Thoomukinta road from km 6/5 to 11/0 & 24/300 to 28/160
1
3645
3645
A.M. to R and B Chinnambavi Section Package II roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Pentlavelly "X" road to Sreerangapur via Thoomukinta road from km 6/5 to 11/0 & 24/300 to 28/160
5
575
2875
A.M. to R and B Chinnambavi Section Package II roads;Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil obtained from side earth and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005) on Pentlavelly "X" road to Sreerangapur via Thoomukinta road from km 6/5 to 11/0 & 24/300 to 28/160
100
39
3990
A.M. to R and B Chinnambavi Section Package II roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. on Pentlavelly "X" road to Sreerangapur via Thoomukinta road from km 6/5 to 11/0 & 24/300 to 28/160
3600
2
10440
A.M. to R and B Chinnambavi Section Package II roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. on Pentlavelly "X" road to Sreerangapur via Thoomukinta road from km 6/5 to 11/0 & 24/300 to 28/160
7200
2
18720
A.M. to R and B Chinnambavi Section Package II roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Pentlavelly "X" road to Sreerangapur via Thoomukinta road from km 6/5 to 11/0 & 24/300 to 28/160
4
2110
8440
A.M. to R and B Chinnambavi Section Package II roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Pentlavelly "X" road to Sreerangapur via Thoomukinta road from km 6/5 to 11/0 & 24/300 to 28/160
100
238
23800
A.M. to R and B Chinnambavi Section Package II roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Pentlavelly "X" road to Sreerangapur via Thoomukinta road from km 6/5 to 11/0 & 24/300 to 28/160
170
380
64600
A.M. to R and B Chinnambavi Section Package II roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . On Ayyavaripally - Weepanagandla road from km 0/0 to 5/0,
300
29
8700
A.M. to R and B Chinnambavi Section Package II roads;Painting and lettering to H.M stones including cost of paint and labour chrges etc, complete for finished itme of work. On Ayyavaripally - Weepanagandla road from km 0/0 to 5/0,
20
326
6520
A.M. to R and B Chinnambavi Section Package II roads;Painting and lettering to K.M stones including cost of paint and labour chrges etc, complete for finished itme of work. On Ayyavaripally - Weepanagandla road from km 0/0 to 5/0,
5
621
3105
A.M. to R and B Chinnambavi Section Package II roads;Manufacturing supplying and fixing of Kilometer stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (H.M stones) on Ayyavaripally - Weepanagandla road from km 0/0 to 5/0,
10
1410
14100
A.M. to R and B Chinnambavi Section Package II roads;Manufacturing supplying and fixing of Kilometer stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (K.M stones) on Ayyavaripally - Weepanagandla road from km 0/0 to 5/0,
3
2458
7374
A.M. to R and B Chinnambavi Section Package II roads;Providing and Engaging Front end loader/JCB 1 Cum capacity for removal of fallen trees, enchroachments etc., for unscattered work in emergency for complete finished item of work as per the instructions of Engineer-in-Charge.(SSR 2023-24 Page N0 39) ( for making kacha drains, high berm cutting and Jungle clearance) on Ayyavaripally - Weepanagandla road from km 0/0 to 5/0,
3
2028
6084
A.M. to R and B Chinnambavi Section Package II roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Ayyavaripally - Weepanagandla road from km 0/0 to 5/0,
5
575
2875
A.M. to R and B Chinnambavi Section Package II roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. on Ayyavaripally - Weepanagandla road from km 0/0 to 5/0,
3600
2
10440
A.M. to R and B Chinnambavi Section Package II roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. on Ayyavaripally - Weepanagandla road from km 0/0 to 5/0,
3600
2
9360
A.M. to R and B Chinnambavi Section Package II roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Ayyavaripally - Weepanagandla road from km 0/0 to 5/0,
4
2180
8720
A.M. to R and B Chinnambavi Section Package II roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. onAyyavaripally - Weepanagandla road from km 0/0 to 5/0,
30
240
7200
A.M. to R and B Chinnambavi Section Package II roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Ayyavaripally - Weepanagandla road from km 0/0 to 5/0,
100
384
38400
A.M. to R and B Chinnambavi Section Package II roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . on Kollapur - Yaparla road from km 16/0 to 19/4,
120
29
3480
A.M. to R and B Chinnambavi Section Package II roads;Manufacturing supplying and fixing of Kilometer stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (H.M stones) on Kollapur - Yaparla road from km 16/0 to 19/4,
13
1398
18174
A.M. to R and B Chinnambavi Section Package II roads;Manufacturing supplying and fixing of Kilometer stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (K.M stones) on Kollapur - Yaparla road from km 16/0 to 19/4,
3
2440
7320
A.M. to R and B Chinnambavi Section Package II roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. On Kollapur - Yaparla road from km 16/0 to 19/4,
5
575
2875
A.M. to R and B Chinnambavi Section Package II roads;Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil obtained from side earth and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005) on Kollapur - Yaparla road from km 16/0 to 19/4,
100
39
3990
A.M. to R and B Chinnambavi Section Package II roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On Kollapur - Yaparla road from km 16/0 to 19/4,
1800
2
5220
A.M. to R and B Chinnambavi Section Package II roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On Kollapur - Yaparla road from km 16/0 to 19/4,
1800
2
4680
A.M. to R and B Chinnambavi Section Package II roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Kollapur - Yaparla road from km 16/0 to 19/4,
2
2110
4220
A.M. to R and B Chinnambavi Section Package II roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Kollapur - Yaparla road from km 16/0 to 19/4,
40
238
9520
A.M. to R and B Chinnambavi Section Package II roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Kollapur - Yaparla road from km 16/0 to 19/4,
60
380
22800
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements