Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Civil And Construction
Bridge Construction
Opening Date12 Jul 2023
Closing Date18 Jul 2023
Tender Amount₹ 27,65,744 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
FDR by Construction of Box Culvert;Drainage spouts for 100mm dia complete as per drwaing and technical specifications Clause 1209 MORD & 2705 MORTH at complete and as per directed by the Engineer-in-Charge.

2

2899

5798

... More
FDR by Construction of Box Culvert;Providing Weep holes in VCC Abutment/Wing wall/return wall with 100mm diameter AC pipe extending through the full width of the structure at 1.00cm cost and conveyance in both horizontal and vertical direction sothat the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C. pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V:20H towards stream side face etc., complete for finished item of work for weep holes as per SSR Data.

27

365

9855

... More
FDR by Construction of Box Culvert;Providing HYSD bars(Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all RCC items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H Specification 1600 & 2200 (5th revision) and as per IS 1786 of 1985 for Super structure of R.C.C. Items.

3

81913

245739

... More
FDR by Construction of Box Culvert;Providing HYSD bars(Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all RCC items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H Specification 1600 & 2200 (5th revision) and as per IS 1786 of 1985 for Sub structure of R.C.C. Items.

3

79795

239385

... More
FDR by Construction of Box Culvert;Providing HYSD bars(Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all RCC items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H Specification 1600 & 2200 (5th revision) and as per IS 1786 of 1985 for Foundations of RCC Items.

4

79480

317920

... More
FDR by Construction of Box Culvert;Provision of an Reinforced Cement Concrete Crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-25 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25mm dia, 450mm long at expansion joints filled with premoulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No.RW/NH-33022/1/94-DO III dated 24 june 1994 as per dimensions in the approved draing and at locations directed by the Engineer-in-Charge.

22

2019

44418

... More
FDR by Construction of Box Culvert;Vibrated reinforced cement concrete M-30 grae using 20mm & 10mm HBG/HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but excluding cost of steel and its fabrication charges as per MoRT&H Specification 1500,1600,1700 & 2702 (5th Revision) and as directed by the Engineer-in-Cherage for Wearing coat over Deck slab.

10

6458

64580

... More
FDR by Construction of Box Culvert;Vibrated reinforced cement concrete M-30 grae using 20mm & 10mm HBG/HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing bD/1-69 (A) but excluding cost of steel and its fabrication charges as per MoRT&H Specification 1500,1600,1700 & 2702 (5th Revision) and as directed by the Engineer-in-Cherage for Approach slab.

18

6499

116982

... More
FDR by Construction of Box Culvert;Vibrated Cement Concrete M-25 Grade Concrete using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, weigh batcher, laying in position, compacting, vibrating curing etc., including other ioncidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Superstructue(Slab)

40

6524

260960

... More
FDR by Construction of Box Culvert;Vibrated Cement Concrete M-25 Grade Concrete using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, weigh batcher, laying in position, compacting, vibrating curing etc., including other ioncidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Sub-Structure.

100

6001

600100

... More
FDR by Construction of Box Culvert;Vibrated Cement Concrete M-25 Grade Concrete using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, weigh batcher, laying in position, compacting, vibrating curing etc., including other ioncidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Foundations.

72

5660

407520

... More
FDR by Construction of Box Culvert;Vibrated Cement Concrete M-15 Grade Concrete using 40mm, 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,(excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, weigh batcher, laying in position, compacting, vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700,2100 (5th Revision) for footings and Raft foundation.

41

5930

243130

... More
FDR by Construction of Box Culvert;Earth work excavation in soils up to SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom back filling the excavation earth to the extent required etc., complete including (excluding seigniorage) charges for finished item of work as per MoRT&H Specification 304 (5th Revision) and as directed by the Engineer-in-Charge.

220

92

20240



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.