Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date4 Jan 2025
Closing Soon16 Jan 2025
Tender Amount₹ 62,94,704 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20Kg.

216

5238

1131408

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;BMW-G.01: Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes with fittings & base support for tanks for Septic tank & SWG lines (Excluding VAT Charges)

72000

11

820800

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, overheads and contractors profit, etc., complete for finished item of work as per Standard specification. 3'-0" Depth

90

9870

888378

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 1524mm (5'.0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental, labour charges, overheads and contractors profit, etc complete for finished item of work 254.5 mm Dia SWG Pipe

180

1824

328439

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 1524mm (5'.0") depth and refilling, watering and tamping, including cost and conveyance of all materials to site, all operational,incidental, labour charges, overheads and contractors profit, etc complete for finished item of work 203.2 mm Dia SWG Pipe

350

1259

440997

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS JACKPROP , CUPLOCK & PIPE SCAFFOLDS) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for Ground Floor

239.52

464

111137

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Supplying, fitting and placing thermo Mechanically Treated (TMT/HYSD) (grade as per structural drawings confirming to IS 1786) manufactured with in Telangana with minimum integrated installed Production of 2Lakh MT per annum by Primary producers like AF STAR TMT/MS LIFE TMT , Radha TMT, SUGNA TMT as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

5.96

77972

464713

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Supply and placing of the M-20 Grade Design Mix Concrete corresponding to IS456 with minimum cement content of 350kgs per 1cum of concrete using Batching Plant of 50cum per hour capacity, Transitmixer 2cum capacity, concrete Pump and using 20mm size graded machine crushed hard Granite metal (coarseaggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20 / 12.50 mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, wateretc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, transportation, laying concrete using concrete pump, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING, and cost of overheads & contractors profitetc., complete but excluding cost of steel and its fabrication charges for finished item of work for following for Slabs 150mm thick of Ground Floor Unsupported height of 3.66 M

75.84

1668

126501

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Supply and placing of the M-20 Grade Design Mix Concrete corresponding to IS456 with minimum cement content of 350kgs per 1cum of concrete using Batching Plant of 50cum per hour capacity, Transitmixer 2cum capacity, concrete Pump and using 20mm size graded machine crushed hard Granite metal (coarseaggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20 / 12.50 mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, wateretc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, transportation, laying concrete using concrete pump, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING, and cost of overheads & contractors profitetc., complete but excluding cost of steel and its fabrication charges for finished item of work for following for Beams

4.65

12572

58460

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Supply and placing of the M-20 Grade Design Mix Concrete corresponding to IS 456 with minimum cement content of 350 kgs per 1cum of concrete using Batching Plant of 50 cum per hour capacity, Transitmixer 2cum capacity, concrete Pump and using 20mm size graded machine crushed hard Granite metal (coarseaggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20 / 12.50 mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, wateretc., to site and excluding Seigniorage charges but including sales & other taxes on all materials, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, transportation, laying concrete using concrete pump, curing etc., complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING, and cost of overheads & contractors profitetc., complete but excluding cost of steel and its fabrication charges for finished item of work for following for 230mm thick RCC Wall - GROUND FLOOR Of Unsupported height 3.66M

203.52

3556

723717

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTINGS

28.15

10379

292169

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Plain Cement Concrete (1:5:10) (cement:fineaggregate: Coarseaggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard, machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarseaggregate, water etc. to site, excluding seigniorage charges but including sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations, ramming, finishing top surface to the required level, curing including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No. 402)

16.99

4421

75113

... More
Construction of Septic Tanks and Sanitary works in 2Bed Room Houses;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means-upto 3M depth

339.98

416

141432



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.