Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Civil And Construction
Building Construction
Opening Date17 Feb 2024
Closing Date11 Mar 2024
Tender Amount₹ 19,23,70,994 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
20 Residential Quarters and Health Club;Foundation and erection charges with special T&P, for 7.50 Mtrs long Octagonal / Conical pole duly erecting on base plate duly providing 4 Nos foundation bolts with nuts with providing of 0.45Mtr x0.45 Mtrs x 1.20 Mtr size M20 cc work vibrated concreting mixing with necessary steel (10kgs) reinforcement as directed by the field engineers during execution including all labour charges and cost and conveyance of materials etc. complete.

10

6828

68280

... More
20 Residential Quarters and Health Club;Fabrication, Transportation and supply of of 1.5mtrs sword type decorative Single arm bracket with dooms complete with all accessories with MS galvanized 50mm dia Pipe.

10

5135

51350

... More
20 Residential Quarters and Health Club;Fabrication, Transportation and supply of hot-dip galvanized Octagonal Pole with BSEN - 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangement, including the supply of suitable boards with Bakelite sheet and MCB's as per IS specification suitable to withstand the wind speed of 180 KMPH for 7.50 Mtrs height Pole having dimensions Bottom 130 mm,. Top 70mm with 3mm thick, base plate 220 x 220 x 12mm and 4 Nos of M20 x 700 long 'J' bolts along with template.Makes: Bajaj / Valmont / TRANSRAIL.

10

15031

150310

... More
20 Residential Quarters and Health Club;Street Lights

-

-

-

... More
20 Residential Quarters and Health Club;Supply and Fixing of crimping type alluminium lugs confirming to IS specifications for cables of 16Sqmm including nuts and bolts with conections etc., complete.

80

36

2880

... More
20 Residential Quarters and Health Club;Supply and Fixing of crimping type alluminium lugs confirming to IS specifications for cables of 25Sqmm including nuts and bolts with conections etc., complete.

8

41

328

... More
20 Residential Quarters and Health Club;Supply and Fixing of crimping type alluminium lugs confirming to IS specifications for cables of 50Sqmm including nuts and bolts with conections etc., complete.

10

51

510

... More
20 Residential Quarters and Health Club;Supply and Fixing of crimping type alluminium lugs confirming to IS specifications for cables of 95Sqmm including nuts and bolts with conections etc., complete.

4

67

268

... More
20 Residential Quarters and Health Club;Supply and Fixing of crimping type alluminium lugs confirming to IS specifications for cables of 185Sqmm including nuts and bolts with conections etc., complete.

12

160

1920

... More
20 Residential Quarters and Health Club;Supply and Fixing of single compression brass cable glands for 4 core 16 Sqmm XLPE armoured cable with brass washers etc., complete.

20

227

4540

... More
20 Residential Quarters and Health Club;Supply and Fixing of single compression brass cable glands for 3.5 core 25 Sqmm XLPE armoured cable with brass washers etc., complete.

2

300

600

... More
20 Residential Quarters and Health Club;Supply and Fixing of single compression brass cable glands for 3.5 core 50 Sqmm XLPE armoured cable with brass washers etc., complete.

2

300

600

... More
20 Residential Quarters and Health Club;Supply and Fixing of single compression brass cable glands for 3.5 core 185 Sqmm XLPE armoured cable with brass washers etc., complete.

4

903

3612

... More
20 Residential Quarters and Health Club;LT CABLE TERMINATIONS:

-

-

-

... More
20 Residential Quarters and Health Club;Labour charges for run of U.G cable on wall / existing pipe/tray with necessary fixing arrangments such as saddles, clamps,wooden separators etc., (as directed by departmental official) for the cables.

30

67

2010

... More
20 Residential Quarters and Health Club;Earth work excavation of Trench in hard ground soil and Sand filling shall be provided at the bottom of trench before laying the cable and laying of U.G cables up to 70 sqmm covering the cable with back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

380

269

102220

... More
20 Residential Quarters and Health Club;Earth work excavation of Trench in hard ground soil, laying of U.G cables 95 to 300Sqmm on sand cushion covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.

140

285

39900

... More
20 Residential Quarters and Health Club;Supply of 16 Sqmm 4 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I).Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Paragon

300

304

91200

... More
20 Residential Quarters and Health Club;Supply of 25 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I).Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Paragon

50

386

19300

... More
20 Residential Quarters and Health Club;Supply of 50 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I).Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Paragon

50

612

30600

... More
20 Residential Quarters and Health Club;Supply of 185 Sqmm 3.5 Core XLPE insulated, 1100V grade armoured alluminium cable as per specification confirming to IS:7098 (Part - I).Makes : Torrent / Unicab / Universal / Polycab / Havells / Gloster / KEI / Finolex / Paragon

150

1754

263100

... More
20 Residential Quarters and Health Club;U.G CABLES

-

-

-

... More
20 Residential Quarters and Health Club;Supply, installation, testing and commissioning of floor mounting type panel board with Alluminium bus bars fabricated with 16 Gauge CRCA Sheet comprising of TPN bus bars with bus bars of equal size in all phases and neutral equipped with bus bar chambers and cable chambers. The bus bars fault level shall be 50 KA and shall be as per the requirement of local CEIG, fire regulations, CPRI norms and other authorities etc. The painting of the complete system shall be powder coated duly processing the panel in 7 tank process . The panel shall be suitable for accomdating the following switch gear including supply of all components, hard wares etc including all necessary civil works, adequate reinforcement foundation bolts, suitable G.I earth strip 40 x 6 mm, door loop earthings , bus bars should be colour sleeved with heat shrinkable sleeves for phase and neutral duly supported at regular intervels by SMC supports and all cables shall have proper cable entry, danger board, feeder identification marks, rigid inter connections, cadmium plated bolts and nuts and shall be installed and consisting of the following as required and as per IS standards for Lighting panel. (Panel shall be manufacture only from CPRI approval fabricators.)250A Alluminium Bus Bar with colour coded sleeves.(1.2A/Sqmm).Internal wiring with approved make cable Earthing Flat: Providing suitable G.I Flat

1

167300

167300

... More
20 Residential Quarters and Health Club;MAIN PANEL

-

-

-

... More
20 Residential Quarters and Health Club;Supply and run of No. 8SWG GI wire including cost of all accessories and labour charges etc complete.

1500

28

42000

... More
20 Residential Quarters and Health Club;Supply and Run of 25mm x 6mm copper strip (Cuurrent Carrying Capacity 350A) including cost of all accessories and labour charges etc., complete. (1.34Kgs/1Mtr

113

1624

183512

... More
20 Residential Quarters and Health Club;Supply and run of 50mmX6mm GI strip including cost of all accessories and labour charges etc complete.

200

297

59400

... More
20 Residential Quarters and Health Club;Supply and run of 25mmX6mm GI strip including cost of all accessories and labour charges etc complete.

250

166

41500

... More
20 Residential Quarters and Health Club;Providing independent earthing by exacavating a pit to a depth of 2.25Mtr in all soils as per size specified in the data for Sophisticated Electronic equipment with 600mm x 600mm x 3.15mm thick copper plate rigidly fixed to 19mm dia 'B' Class G.I Pipe of 2.5Mtr lengthwith funnel as per National Electric Code and earth connection from electrode GI strip of 40mm x 5mm x 200mm length to be bolted with nut bolts to G.I.pipe including 25mm x 3mm copper strip of 6Mtrs length connected from plate to GI strip including filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe and providing CC / Brick massonry chamber 450mmX450mmX400mm and covered with R.C.C. Slab including all accessories and labour charges etc complete as per IS specification 732/1982 (Part II).

2

18940

37880

... More
20 Residential Quarters and Health Club;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick massonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II)

6

6631

39786

... More
20 Residential Quarters and Health Club;EARTHINGS

-

-

-

... More
20 Residential Quarters and Health Club;Providing External Electrical Installation and Panels

-

-

-

... More
20 Residential Quarters and Health Club;1.1 1/8" x 5/8"

20

1987

39740

... More
20 Residential Quarters and Health Club;1.7/8" x 1/2"

50

1700

85000

... More
20 Residential Quarters and Health Club;Providing 2 Runs of copper tubes for suction and liquid between indoor and out door unit for split air conditioners including foaming required wire etc complete with connections.

-

-

-

... More
20 Residential Quarters and Health Club;Supply, transportation and installation of 2.0 TR 3 Star capable of delivering 21600 BTU/hr and above with operating on refrigerant R-32 / R-22 with COP not less than 3.25 w/w split AC unit with high wall mounted indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing cooling dehumidifying air circulating and filtering with cooling and condensing units with 3.5 mts of copper piping, insulation kit and 4 mts of 3 core copper flexible chord, built-in stabilizer (Voltage range 160- 264 volts) and cordless remote control for Judge Chambers. Makes:Daikin or its equivalent model of Carrier / Blue Star

5

45009

225045

... More
20 Residential Quarters and Health Club;Supply, transportation and installation of 1.5 TR 3 Star capable of delivering 18000 BTU/hr and above with operating on refrigerant R-32 / R-410A with COP not less than 3.6 w/w split AC unit with high wall mounted indoor unit and outdoor condencing unit Hermetically sealed compressor suitable for operation on 230V, 50Hz, 1Phase AC supply capable of performing cooling dehumidifying air circulating and filtering with cooling and condensing units with 3.5 mts of copper piping, insulation kit and 4 mts of 3 core copper flexible chord, built-in stabilizer (Voltage range 160- 264 volts) and cordless remote control for Meeting Hall - 4 Nos, Library - 4 Nos, Computer rooms -4 Nos, Ante Rooms - 10 Nos and Judges Lounge - 1No Makes: Daikin or its equivalent model of Carrier / Blue Star

3

37696

113088

... More
20 Residential Quarters and Health Club;AC UNITS

-

-

-

... More
20 Residential Quarters and Health Club;Providing Airconditioning

-

-

-

... More
20 Residential Quarters and Health Club;Supply and providing of UPS cum battery rack up to 4 batteries.

1

1687

1687

... More
20 Residential Quarters and Health Club;Supply and fixing of 12V 42 AH SMF battery including wire leads.Makes: Servomax / Top Power / Amar Raja / Samhitha / Microtech / Excide / Sucom.

2

8193

16386

... More
20 Residential Quarters and Health Club;Supply and installation of 1400VA, 24VDC home UPS system pure sine wave out put, single phase input / Single phase output.Makes: Servomax / Top Power / Amar Raja / Samhitha / Microtech / Excide / Sucom.

1

14247

14247

... More
20 Residential Quarters and Health Club;UPS

-

-

-

... More
20 Residential Quarters and Health Club;Supply and fixing of 9U wall mounting net work rack with power spike including accessories and all labour charges etc.complete

1

9072

9072

... More
20 Residential Quarters and Health Club;Supply and fixing of 15U wall mounting net work rack with power spike including accessories and all labour charges etc.complete

1

11975

11975

... More
20 Residential Quarters and Health Club;Supply and fixing of 24 port patch panels including accessories and all labour charges etc complete.Makes : D Link / AMP / Molex / Legrand / Krone.

1

7578

7578

... More
20 Residential Quarters and Health Club;Supply and fixing of 24 Port manageable switches including accessories and all labour charges etc complete.Makes : CISCO / Net Gear / HP / D Link

1

9941

9941

... More
20 Residential Quarters and Health Club;Supply and fixing of 3 feet length moulded patch cord including accessories and all labour charges etc complete Makes : D Link / AMP / Molex / Legrand / Krone.

14

200

2800

... More
20 Residential Quarters and Health Club;Supply and fixing of 7 feet length moulded patch cord including accessories and all labour charges etc complete Makes : D Link / AMP / Molex / Legrand / Krone.

14

222

3108

... More
20 Residential Quarters and Health Club;Supply and fixing of Modular telephone Jack with connector on modular box with cover frame in existing surface / consealed pipe wiring including cost and coveyance of all material and all labour charges etc., complete in N.R.B. / R.B. Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

5

312

1560

... More
20 Residential Quarters and Health Club;Supply and fixing of 20 pair MDF krone pair box with MS enclosure with lock and key arrangement etc complete with all labour charges.

1

1964

1964

... More
20 Residential Quarters and Health Club;Supply and laying of 20 pair telephone wire 0.5mm copper in the existing metallic/non metallic conduit pipe with connections etc.,completeTelephone wire.Makes: Finolex / Delton / Surabi / Polycab.

25

110

2760

... More
20 Residential Quarters and Health Club;Supply and run of 2 Pair, 0.5mm telephone copper wire in existing pipe inlcuding all labour charges etc., complete.Makes: Gold Medal / Million / Finolex / Surabi / Polycab.

180

26

4734

... More
20 Residential Quarters and Health Club;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate and all labour charges etc., complete Makes: D Link / AMP / Molex / Legrand / Krone.

14

637

8918

... More
20 Residential Quarters and Health Club;Supply and Run of LAN Cable cat - 6 UTP cable.in existing pipe inlcuding all labour charges etc., complete.Makes: D Link / AMP / Molex / Legrand / Krone

500

44

22000

... More
20 Residential Quarters and Health Club;"Supply and fixing of DB with 1 No 20A single phase plug and Socket, in sheet steel enclosure with 1 No 10A to 20A 10 KA ISI Marked C/D curveSP MCB including internal connection and labour charges for Flush Mounting etc., complete.Plug and Socket Makes:Legrand / Schneider.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

8

2706

21648

... More
20 Residential Quarters and Health Club;Supply and fixing of 8 Way VTPN DB with IP 43 Protection as per IS:13032 and Supply and Fixing of 1 No., of 125A TPN MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted as incomer with 8 Nos of 63A, 10KA, TP MCBs C Curve ISI Mark as Out goings including internal connections and labour charges for FLUSH Mounting etc., complete. DB Makes:Legrand / Schneider.MCCB Makes: L&T- D shine / Schneider-NS NSX.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

1

56754

56754

... More
20 Residential Quarters and Health Club;Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 63A FP Isolator and 12 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. MCBs Makes: Legrand-DX3 / Schneider-Acti9.Isolator Makes: Legrand-DX3 / Schneider-Acti9.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

1

12581

12581

... More
20 Residential Quarters and Health Club;Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 40A FP Isolator and 12 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes:Legrand / Schneider / Siemens.Isolator Makes: Legrand-DX3 / Schneider-Acti9.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

3

12449

37347

... More
20 Residential Quarters and Health Club;Supply and fixing of 8Way SPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 40A DP Isolator and 8 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes:Legrand / Schneider.Isolator Makes: Legrand-DX3 / Schneider-Acti9.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

1

6675

6675

... More
20 Residential Quarters and Health Club;Supply and fixing of shutter for the exhaust fan with enamil paint matching to the wall colour.

10

191

1910

... More
20 Residential Quarters and Health Club;Supply, Transportation and Fixing of 12" (300mm) ISI, 900 RPM Heavy duty exhaust fan with metallic blades with Mark and masonary work and all labour charges etc., complete. Makes: Crompton / Almonard / Havells Turbo Force SP.Twin Core Wire Makes: Finolex / RR kabel / Havells.

6

4343

26058

... More
20 Residential Quarters and Health Club;Supply, Transportation and Fixing of light duty 9" (225mm) ISI, Fresh Air fan with metallic body and blades and masonary work and all labour charges etc., complete. Makes:Crompton / Havells Ventilair-DB / Orient hill air.Twin Core Wire Makes: Finolex / RR kabel / Havells.

4

2217

8868

... More
20 Residential Quarters and Health Club;Supply and fixing of Modular type Stepped electronic regulator for sweep AC ceiling fans of 1200mm including internal connections and all labour charges etc.Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision.

34

624

21216

... More
20 Residential Quarters and Health Club;Supply, Transportation and fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.0, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete.with twin core flat copper wire, connections and all labour charges etc., complete.Makes : Atomberg (Efficio ) / Havells /

34

3656

124304

... More
20 Residential Quarters and Health Club;Supply,Transportation & Instatlation of 36 W +/-10% (>=3600 Lumens) Back lit, 2' x2' (600mm x 600mm) Recessed / Surface mounted LED luminaire made of CRCA sheet housing with powder coated with high efficiency acrylic wide diffuser, with wide operating voltage range, Power factor > 0.9, Surge protection >2KV, System efficacy of >100 lumens/watt, CCT: 3000K - 6500K as desired by the department, CRI >80, and THD is less than 15% etc., complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM /Wipro / Crompton / Havells / Jaquar / Panasonic. / Keselec / FIEM / Arraystorm / GM / Goldmedal LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

7

3528

24696

... More
20 Residential Quarters and Health Club;Supply, transportation and Fixing of 22W +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton/ Bajaj / Havells / Jaquar / Panasonic. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

13

930

12090

... More
20 Residential Quarters and Health Club;Supply and transportation of 18W +/-10% (>= 1080 Lumens) LED back' lit LED slimline panel light Housing made of Pressure die cast aluminium with Powder coated, round / Square with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >90 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 2 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Havells / Jaquar / Panasonic. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

81

1972

159732

... More
20 Residential Quarters and Health Club;Supply and transportation of 12W +/-10% (>= 1080 Lumens) LED back lit LED slimline panel light Housing made of Pressure die cast aluminium with Powder coated, round / Square with Protruded high efficiency diffuser, IP20, with wide operating voltage range, Power factor > 0.9, Surge protection: > 2KV, System efficacy of >90 lumens/watt, CCT: 3000K - 6500K as desired by the department and as per IS, CRI >80, and THD is less than 15% etc., complete with 2 years warranty with BIS Certification. LUMINAIRE MAKE : Phillips / OSRAM / Wipro / Crompton / Havells / Jaquar / Panasonic. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

42

1632

68544

... More
20 Residential Quarters and Health Club;Supply and fixing of buzzer of makes Anchor / Goldmedal / Million / GM / Maru, in lieu of Ceiling rose, including giving connections, cost of all accessories and labour charges etc., complete for New installations Makes : GM / Million / Gold Medal / Anchor Makes : GM / Million / Gold Medal / Anchor

1

144

144

... More
20 Residential Quarters and Health Club;Supply and Run of 5 of 10.0 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains ,ferrulesinlcuding all labour charges etc., complete for Lighting VTPN DBs. Makes : Finolex / RR kabel / Havells

100

869

86900

... More
20 Residential Quarters and Health Club;Supply and Run of 5 of 6.0 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains,ferrules inlcuding all labour charges etc., complete. for lighting TPN DBs and computer TPN DBs Makes : Finolex / RR kabel / Havells

100

558

55800

... More
20 Residential Quarters and Health Club;Supply and Run of 3of 6.0 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains,ferrules inlcuding all labour charges etc., complete. for lighting TPN DBs and computer TPN DBs Makes : Finolex / RR kabel / Havells

480

326

156480

... More
20 Residential Quarters and Health Club;Supply and Run of 3 of 4.00 Sq.mm FRLSH/ HFFRPVC insulated flexible ISI mark copper cable in existing pipe for run of mains,ferrules inlcuding all labour charges etc., complete.Makes : Finolex / RR kabel / Havells

210

234

49140

... More
20 Residential Quarters and Health Club;Supply and Run of 3 of 2.50 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains, ferrules inlcuding all labour charges etc., complete.Makes : Finolex / RR kabel / Havells

770

154

118580

... More
20 Residential Quarters and Health Club;Supply and fixing of 3 Nos 10A ISI mark Modular type switch with 3Nos 10A 3/2 pin wall plug socket on suitable size Modular deep box with cover frame including cost and coveyance of all material ferules and all labour charges etc., complete for Computers in N.R.B. / R.B.Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

14

1454

20356

... More
20 Residential Quarters and Health Club;Supply and fixing of ISI mark 16A 3pin / 6A 3 Pin 1 way Modular combi socket, 16 Amps Modular switch, 3 Modular box with suitable cover frame and earth connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B.. Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

17

781

13277

... More
20 Residential Quarters and Health Club;Wiring with run of 3 of 1.5 Sqmm FRLSH/ HFFRPVC insulated flexible ISI marked copper cable including Supply and fixing of ISI Marked 10A- 3/2 pin Modular socket, 10A 1way Modular switch with required cover frame including connections, cost and conveyance of all material and all labour charges etc., complete for seperate plug points in N.R.B. / R.B.Makes : Finolex / RR kabel / Havells Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

25

949

23725

... More
20 Residential Quarters and Health Club;Supply and fixing of ISI marked 10A 3/2pin Modular socket, 10 Amps Modular switch on 3 modular box with suitable cover frame on a common switch board including cost and conveyance of all material and all labour charges etc., complete in N.R.B. Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

33

552

18216

... More
20 Residential Quarters and Health Club;Wiring with run of 3 of 1.5 Sqmm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for fan and exhaust fan points in N.R.B. Makes : Finolex / RR kabel / Havells Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

44

1157

50908

... More
20 Residential Quarters and Health Club;Wiring with run of 2 of1.5 Sqmm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 10A ISI Mark 2way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for Stair case points in N.R.B .Makes : Finolex / RR kabel / Havells Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

4

1410

5640

... More
20 Residential Quarters and Health Club;Wiring with run of 2 of1.5 Sqmm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for light and bell points in N.R.B .Makes : Finolex / RR kabel / Havells Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

160

940

150400

... More
20 Residential Quarters and Health Club;Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe consealed in wall with all required Metallic Junction Boxes including masonary work and labour charges etc., complete for Run of mains.Makes : Sudhakar / Finolex / Modi / VIP / Precision.

1300

93

120900

... More
20 Residential Quarters and Health Club;Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe consealed in wall with Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP / Precision.

1000

93

93000

... More
20 Residential Quarters and Health Club;Supply and Laying of ISI 25mm outer dia heavy grade IS:9537 part 3 regid PVC pipe concealed in Roof Slabs with all required Metallic Deep Boxes including labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP / Precision.

1500

113

169500

... More
20 Residential Quarters and Health Club;Providing Electrical Installations to the Club House

-

-

-

... More
20 Residential Quarters and Health Club;Supply and fixing of Modular telephone Jack with connector on modular box with cover frame in existing surface / consealed pipe wiring including cost and coveyance of all material and all labour charges etc., complete in N.R.B. / R.B. Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

50

312

15600

... More
20 Residential Quarters and Health Club;Supply and fixing of 20 pair MDF krone pair box with MS enclosure with lock and key arrangement etc complete with all labour charges.

5

1964

9820

... More
20 Residential Quarters and Health Club;Supply and laying of 20 pair telephone wire 0.5mm copper in the existing metallic/non metallic conduit pipe with connections etc.,completeTelephone wire.Makes: Finolex / Delton / Surabi / Polycab.

100

110

11040

... More
20 Residential Quarters and Health Club;Supply and run of 2 Pair, 0.5mm telephone copper wire in existing pipe inlcuding all labour charges etc., complete. Makes: Gold Medal / Million / Finolex / Surabi / Polycab.

1500

26

39450

... More
20 Residential Quarters and Health Club;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate and all labour charges etc., complete Makes: D Link / AMP / Molex / Legrand / Krone.

10

637

6370

... More
20 Residential Quarters and Health Club;Supply and Run of LAN Cable cat - 6 UTP cable.in existing pipe inlcuding all labour charges etc., complete.Makes: D Link / AMP / Molex / Legrand / Krone

350

44

15400

... More
20 Residential Quarters and Health Club;"Supply and fixing of DB with 1 No 20A single phase plug and Socket, in sheet steel enclosure with 1 No 10A to 20A 10 KA ISI Marked C/D curveSP MCB including internal connection and labour charges for Flush Mounting etc., complete.Plug and Socket Makes:Legrand / Schneider.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

40

2706

108240

... More
20 Residential Quarters and Health Club;Supply and fixing of 8 Way VTPN DB with IP 43 Protection as per IS:13032 and Supply and Fixing of 1 No., of 125A TPN MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted as incomer with 8 Nos of 63A, 10KA, TP MCBs C Curve ISI Mark as Out goings including internal connections and labour charges for FLUSH Mounting etc., complete.DB Makes:Legrand / Schneider . MCCB Makes: L&T- D shine / Schneider-NS NSX/Legrand -DP X3.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

1

56754

56754

... More
20 Residential Quarters and Health Club;Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 63A FP Isolator and 12 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes:Legrand / Schneider.Isolator Makes: Legrand-DX3 / Schneider-Acti9.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

1

12581

12581

... More
20 Residential Quarters and Health Club;Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 40A FP Isolator and 12 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes:Legrand / Schneider.Isolator Makes: Legrand-DX3 / Schneider-Acti9.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

11

12449

136939

... More
20 Residential Quarters and Health Club;Supply and fixing of 8Way SPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 40A DP Isolator and 8 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes:Legrand / Schneider.Isolator Makes: Legrand-DX3 / Schneider-Acti9.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

10

6675

66750

... More
20 Residential Quarters and Health Club;Supply and fixing of shutter for the exhaust fan with enamil paint matching to the wall colour.

60

191

11460

... More
20 Residential Quarters and Health Club;Supply, Transportation and Fixing of light duty 9" (225mm) ISI, Fresh Air fan with metallic body and blades and masonary work and all labour charges etc., complete. Makes:Crompton / Havells Ventilair-DB / Orient hill air. Twin Core Wire Makes: Finolex / RR kabel / Havells. Twin Core Wire Makes: Finolex / RR kabel / Havells.

60

2217

133020

... More
20 Residential Quarters and Health Club;Supply and fixing of Modular type Stepped electronic regulator for sweep AC ceiling fans of 1200mm including internal connections and all labour charges etc.Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision.

92

624

57408

... More
20 Residential Quarters and Health Club;Supply, Transportation and fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.0, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete.with twin core flat copper wire, connections and all labour charges etc., complete.Makes : Atomberg (Efficio ) / Havells / Orient

92

3656

336352

... More
20 Residential Quarters and Health Club;Supply, transportation and Fixing of 22W +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton/ Havells / Jaquar/ Panasonic. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

220

930

204600

... More
20 Residential Quarters and Health Club;Supply and fixing of Ding Dong Bell of makes Anchor/Goldmedal/Million/ GM/ Maru/,in lieu of Ceiling rose, including giving connections, cost of all accessories and labour charges etc., complete for New installations Makes : GM / Million / Gold Medal / Anchor

10

213

2130

... More
20 Residential Quarters and Health Club;Supply and fixing of buzzer of makes Anchor / Goldmedal / Million / GM / Maru, in lieu of Ceiling rose, including giving connections, cost of all accessories and labour charges etc., complete for New installations Makes : GM / Million / Gold Medal / Anchor

10

144

1440

... More
20 Residential Quarters and Health Club;Supply and Run of 5 of 10.0 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains ,ferrulesinlcuding all labour charges etc., complete for Lighting VTPN DBs. Makes : Finolex / RR kabel / Havells

50

869

43450

... More
20 Residential Quarters and Health Club;Supply and Run of 5 of 6.0 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains,ferrules inlcuding all labour charges etc., complete. for lighting TPN DBs and computer TPN DBs Makes : Finolex / RR kabel / Havells

320

558

178560

... More
20 Residential Quarters and Health Club;Supply and Run of 3of 6.0 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains,ferrules inlcuding all labour charges etc., complete. for lighting TPN DBs and computer TPN DBs Makes : Finolex / RR kabel / Havells

1500

326

489000

... More
20 Residential Quarters and Health Club;Supply and Run of 3 of 4.00 Sq.mm FRLSH/ HFFRPVC insulated flexible ISI mark copper cable in existing pipe for run of mains,ferrules inlcuding all labour charges etc., complete.Makes : Finolex / RR kabel / Havells

1700

234

397800

... More
20 Residential Quarters and Health Club;Supply and Run of 3 of 2.50 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains, ferrules inlcuding all labour charges etc., complete.Makes : Finolex / RR kabel / Havells

2400

154

369600

... More
20 Residential Quarters and Health Club;Supply and fixing of 3 Nos 10A ISI mark Modular type switch with 3Nos 10A 3/2 pin wall plug socket on suitable size Modular deep box with cover frame including cost and coveyance of all material ferules and all labour charges etc., complete for Computers in N.R.B. / R.B. Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

40

1454

58160

... More
20 Residential Quarters and Health Club;Supply and fixing of ISI mark 16A 3pin / 6A 3 Pin 1 way Modular combi socket, 16 Amps Modular switch, 3 Modular box with suitable cover frame and earth connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B.. Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

60

781

46860

... More
20 Residential Quarters and Health Club;Wiring with run of 3 of 1.5 Sqmm FRLSH/ HFFRPVC insulated flexible ISI marked copper cable including Supply and fixing of ISI Marked 10A- 3/2 pin Modular socket, 10A 1way Modular switch with required cover frame including connections, cost and conveyance of all material and all labour charges etc., complete for seperate plug points in N.R.B. / R.B.Makes : Finolex / RR kabel / Havells Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

160

949

151840

... More
20 Residential Quarters and Health Club;Supply and fixing of ISI marked 10A 3/2pin Modular socket, 10 Amps Modular switch on 3 modular box with suitable cover frame on a common switch board including cost and conveyance of all material and all labour charges etc., complete in N.R.B. Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

150

552

82800

... More
20 Residential Quarters and Health Club;Wiring with run of 3 of 1.5 Sqmm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for fan and exhaust fan points in R.B. Makes : Finolex / RR kabel / Havells Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

152

1073

163096

... More
20 Residential Quarters and Health Club;Wiring with run of 2 of1.5 Sqmm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 10A ISI Mark 2way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for Stair case points in R.B .(2 way points)Makes : Finolex / RR kabel / Havells Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

100

1330

133050

... More
20 Residential Quarters and Health Club;Wiring with run of 2 of1.5 Sqmm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for light and bell points in R.B .Makes : Finolex / RR kabel / Havells Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

372

887

329964

... More
20 Residential Quarters and Health Club;Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe consealed in wall with all required Metallic Junction Boxes including masonary work and labour charges etc., complete for Run of mains.Makes : Sudhakar / Finolex / Modi / VIP / Precision.

1600

93

148800

... More
20 Residential Quarters and Health Club;Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe consealed in wall with Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP / Precision.

3000

93

279000

... More
20 Residential Quarters and Health Club;Supply and Laying of ISI 25mm outer dia heavy grade IS:9537 part 3 regid PVC pipe concealed in Roof Slabs with all required Metallic Deep Boxes including labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP / Precision.

6900

113

779700

... More
20 Residential Quarters and Health Club;Internal Electrification for Quarters Building-2.

-

-

-

... More
20 Residential Quarters and Health Club;Supply and fixing of Modular telephone Jack with connector on modular box with cover frame in existing surface / consealed pipe wiring including cost and coveyance of all material and all labour charges etc., complete in N.R.B. / R.B. Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

50

312

15600

... More
20 Residential Quarters and Health Club;Supply and fixing of 20 pair MDF krone pair box with MS enclosure with lock and key arrangement etc complete with all labour charges.

5

1964

9820

... More
20 Residential Quarters and Health Club;Supply and laying of 20 pair telephone wire 0.5mm copper in the existing metallic/non metallic conduit pipe with connections etc.,completeTelephone wire.Makes: Finolex / Delton / Surabi / Polycab.

100

110

11040

... More
20 Residential Quarters and Health Club;Supply and run of 2 Pair, 0.5mm telephone copper wire in existing pipe inlcuding all labour charges etc., complete. Makes: Gold Medal / Million / Finolex / Surabi / Polycab.

1500

26

39450

... More
20 Residential Quarters and Health Club;Supply and fixing of Cat 6 RJ-45 information outlets including duel face plate and all labour charges etc., complete Makes: D Link / AMP / Molex / Legrand / Krone.

10

637

6370

... More
20 Residential Quarters and Health Club;Supply and Run of LAN Cable cat - 6 UTP cable.in existing pipe inlcuding all labour charges etc., complete.Makes: D Link / AMP / Molex / Legrand / Krone

350

44

15400

... More
20 Residential Quarters and Health Club;"Supply and fixing of DB with 1 No 20A single phase plug and Socket, in sheet steel enclosure with 1 No 10A to 20A 10 KA ISI Marked C/D curveSP MCB including internal connection and labour charges for Flush Mounting etc., complete.Plug and Socket Makes:Legrand / Schneider.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

40

2706

108240

... More
20 Residential Quarters and Health Club;Supply and fixing of 8 Way VTPN DB with IP 43 Protection as per IS:13032 and Supply and Fixing of 1 No., of 125A TPN MCCB, Adjustable, Confirms to IS/IEC 60947-2 having Breaking Capacity 25 KA with thermal magnetic release Panel Mounted as incomer with 8 Nos of 63A, 10KA, TP MCBs C Curve ISI Mark as Out goings including internal connections and labour charges for FLUSH Mounting etc., complete.DB Makes:Legrand / Schneider . MCCB Makes: L&T- D shine / Schneider-NS NSX/Legrand -DP X3.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

1

56754

56754

... More
20 Residential Quarters and Health Club;Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 63A FP Isolator and 12 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes:Legrand / Schneider.Isolator Makes: Legrand-DX3 / Schneider-Acti9.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

1

12581

12581

... More
20 Residential Quarters and Health Club;Supply and fixing of 4 Way TPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 40A FP Isolator and 12 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes:Legrand / Schneider.Isolator Makes: Legrand-DX3 / Schneider-Acti9.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

11

12449

136939

... More
20 Residential Quarters and Health Club;Supply and fixing of 8Way SPN DB Horizontal with IP 43 Protection as per IS:13032 with 1 No 40A DP Isolator and 8 Nos 6-32 A 10kA ISI Marked C/D curveSP MCBs including alll connections and labour charges for Flush Mounting etc., complete. DB Makes:Legrand / Schneider.Isolator Makes: Legrand-DX3 / Schneider-Acti9.MCBs Makes: Legrand-DX3 / Schneider-Acti9.

10

6675

66750

... More
20 Residential Quarters and Health Club;Supply and fixing of shutter for the exhaust fan with enamil paint matching to the wall colour.

60

191

11460

... More
20 Residential Quarters and Health Club;Supply, Transportation and Fixing of light duty 9" (225mm) ISI, Fresh Air fan with metallic body and blades and masonary work and all labour charges etc., complete. Makes:Crompton / Havells Ventilair-DB / Orient hill air. Twin Core Wire Makes: Finolex / RR kabel / Havells. Twin Core Wire Makes: Finolex / RR kabel / Havells.

60

2217

133020

... More
20 Residential Quarters and Health Club;Supply and fixing of Modular type Stepped electronic regulator for sweep AC ceiling fans of 1200mm including internal connections and all labour charges etc.Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision.

92

624

57408

... More
20 Residential Quarters and Health Club;Supply, Transportation and fixing of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.0, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 10%. compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, earthing etc., including all standard accessories etc., complete.with twin core flat copper wire, connections and all labour charges etc., complete.Makes : Atomberg (Efficio ) / Havells / Orient

92

3656

336352

... More
20 Residential Quarters and Health Club;Supply, transportation and Fixing of 22W +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton/ Havells / Jaquar/ Panasonic. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

220

930

204600

... More
20 Residential Quarters and Health Club;Supply and fixing of Ding Dong Bell of makes Anchor/Goldmedal/Million/ GM/ Maru/,in lieu of Ceiling rose, including giving connections, cost of all accessories and labour charges etc., complete for New installations Makes : GM / Million / Gold Medal / Anchor

10

213

2130

... More
20 Residential Quarters and Health Club;Supply and fixing of buzzer of makes Anchor / Goldmedal / Million / GM / Maru, in lieu of Ceiling rose, including giving connections, cost of all accessories and labour charges etc., complete for New installations Makes : GM / Million / Gold Medal / Anchor

10

144

1440

... More
20 Residential Quarters and Health Club;Supply and Run of 5 of 10.0 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains ,ferrulesinlcuding all labour charges etc., complete for Lighting VTPN DBs. Makes : Finolex / RR kabel / Havells

50

869

43450

... More
20 Residential Quarters and Health Club;Supply and Run of 5 of 6.0 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains,ferrules inlcuding all labour charges etc., complete. for lighting TPN DBs and computer TPN DBs Makes : Finolex / RR kabel / Havells

320

558

178560

... More
20 Residential Quarters and Health Club;Supply and Run of 3of 6.0 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains,ferrules inlcuding all labour charges etc., complete. for lighting TPN DBs and computer TPN DBs Makes : Finolex / RR kabel / Havells

1500

326

489000

... More
20 Residential Quarters and Health Club;Supply and Run of 3 of 4.00 Sq.mm FRLSH/ HFFRPVC insulated flexible ISI mark copper cable in existing pipe for run of mains,ferrules inlcuding all labour charges etc., complete.Makes : Finolex / RR kabel / Havells

1700

234

397800

... More
20 Residential Quarters and Health Club;Supply and Run of 3 of 2.50 Sq.mm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains, ferrules inlcuding all labour charges etc., complete.Makes : Finolex / RR kabel / Havells

2400

154

369600

... More
20 Residential Quarters and Health Club;Supply and fixing of 3 Nos 10A ISI mark Modular type switch with 3Nos 10A 3/2 pin wall plug socket on suitable size Modular deep box with cover frame including cost and coveyance of all material ferules and all labour charges etc., complete for Computers in N.R.B. / R.B. Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

40

1454

58160

... More
20 Residential Quarters and Health Club;Supply and fixing of ISI mark 16A 3pin / 6A 3 Pin 1 way Modular combi socket, 16 Amps Modular switch, 3 Modular box with suitable cover frame and earth connections including cost and conveyance of all material and all labour charges etc., complete in N.R.B.. Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

60

781

46860

... More
20 Residential Quarters and Health Club;Wiring with run of 3 of 1.5 Sqmm FRLSH/ HFFRPVC insulated flexible ISI marked copper cable including Supply and fixing of ISI Marked 10A- 3/2 pin Modular socket, 10A 1way Modular switch with required cover frame including connections, cost and conveyance of all material and all labour charges etc., complete for seperate plug points in N.R.B. / R.B.Makes : Finolex / RR kabel / Havells Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

160

949

151840

... More
20 Residential Quarters and Health Club;Supply and fixing of ISI marked 10A 3/2pin Modular socket, 10 Amps Modular switch on 3 modular box with suitable cover frame on a common switch board including cost and conveyance of all material and all labour charges etc., complete in N.R.B. Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

150

552

82800

... More
20 Residential Quarters and Health Club;Wiring with run of 3 of 1.5 Sqmm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for fan and exhaust fan points in R.B. Makes : Finolex / RR kabel / Havells Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

152

1073

163096

... More
20 Residential Quarters and Health Club;Wiring with run of 2 of1.5 Sqmm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 10A ISI Mark 2way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for Stair case points in R.B .(2 way points)Makes : Finolex / RR kabel / Havells Accessories Makes : Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

100

1330

133050

... More
20 Residential Quarters and Health Club;Wiring with run of 2 of1.5 Sqmm FRLSH/ HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Surface or Concealed pipe wiring,ferrules including cost and conveyance of all material and all labour charges etc., complete for light and bell points in R.B .Makes : Finolex / RR kabel / Havells Accessories Makes :Legrand Myrius /Goldmedal Curve/ Anchor Roma viola / Havells Fabio / Panasonic Vision/GM Four five.

372

887

329964

... More
20 Residential Quarters and Health Club;Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe consealed in wall with all required Metallic Junction Boxes including masonary work and labour charges etc., complete for Run of mains.Makes : Sudhakar / Finolex / Modi / VIP / Precision.

1600

93

148800

... More
20 Residential Quarters and Health Club;Supply and laying of ISI 25mm outer dia medium grade with IS:9537 part 3 regid PVC pipe consealed in wall with Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with including all labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP / Precision.

3000

93

279000

... More
20 Residential Quarters and Health Club;Supply and Laying of ISI 25mm outer dia heavy grade IS:9537 part 3 regid PVC pipe concealed in Roof Slabs with all required Metallic Deep Boxes including labour charges etc., complete.Makes : Sudhakar / Finolex / Modi / VIP / Precision.

6900

113

779700

... More
20 Residential Quarters and Health Club;Internal Electrification for Quarters Building-1.

-

-

-

... More
20 Residential Quarters and Health Club;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)

27

229

6183

... More
20 Residential Quarters and Health Club;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504).

15.9

9216

146534.4

... More
20 Residential Quarters and Health Club;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No. 402) MACHINE MIXING

3.2

4392

14054.4

... More
20 Residential Quarters and Health Club;Earth work excavation for ( Sump, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.

118

91

10738

... More
20 Residential Quarters and Health Club;Rain water

-

-

-

... More
20 Residential Quarters and Health Club;Painting to new iron works with 2 coats

14

205

2870

... More
20 Residential Quarters and Health Club;Compound wall gate Providing Mild Steel

1215

156

189673.65

... More
20 Residential Quarters and Health Club;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

1450

285

413250

... More
20 Residential Quarters and Health Club;Flush Pointing to RR/CRS Masonry in CM(1:3)(with 50% river sand & 50% manufactured sand), including all cost and convenyance of all materials in site curing, labour chrges etc, and overheads & contractors profit, complete for finished item of work.

190

112

21280

... More
20 Residential Quarters and Health Club;Plastering 20mm thick using screened sand with CM (1:5) (with 50% river sand and 50% Manufactured sand) including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, curing, cutting grooves as directed by Engineer - in - charge and cost of overheads & contractors profit etc., complete for finished item of work for basement. (SS 901,903 & 904)- Stilt Floor

1260

265

333900

... More
20 Residential Quarters and Health Club;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504).

132

9216

1216512

... More
20 Residential Quarters and Health Club;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)

29

229

6641

... More
20 Residential Quarters and Health Club;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand (with 50% river sand & 50% manufactured sand), water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc., complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

199

4518

899082

... More
20 Residential Quarters and Health Club;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

0.25

84842

21210.5

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, Water Tankes, RCC Walls in BUILDINGS.

0.9

14391

12951.9

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, in BUILDINGS.

-

-

-

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Footings, Pedestals & Plinth Beams

2

8918

17836

... More
20 Residential Quarters and Health Club;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No. 402) MACHINE MIXING

37

4392

162504

... More
20 Residential Quarters and Health Club;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.

183

159

29097

... More
20 Residential Quarters and Health Club;Compound wall

-

-

-

... More
20 Residential Quarters and Health Club;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)

82

229

18778

... More
20 Residential Quarters and Health Club;Manufacture, supply, delivery and fixing of encapsulated plastic steeps as per company's standard specification including cost of materials packing as per companys standards loding transporation unloading and stacking at site of work etc,. Complete but excluding taxes and others etc,. as applicable,including all incidental, labour charges such of overheads & contractors profit etc., complete for finished item of work

24

232

5568

... More
20 Residential Quarters and Health Club;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

270

587

158490

... More
20 Residential Quarters and Health Club;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

5

84842

424210

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for 75mm thick slabs

3

1314

3942

... More
20 Residential Quarters and Health Club;Roof Slab 125 mm thick up to unsupported height of 3.66

57

1600

91200

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for beam and slabs.

-

-

-

... More
20 Residential Quarters and Health Club;150 mm thick side walls

7

3366

23562

... More
20 Residential Quarters and Health Club;225 mm thick side walls

103

4083

420549

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Columens Water Tanks RCC Walls in Buildings

-

-

-

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Botoom Slab

14.4

8915

128376

... More
20 Residential Quarters and Health Club;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504).

2

9216

18432

... More
20 Residential Quarters and Health Club;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand (with 50% river sand & 50% manufactured sand), water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc., complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

11

4518

49698

... More
20 Residential Quarters and Health Club;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

6.8

4584

31171.2

... More
20 Residential Quarters and Health Club;Earth work excavation for ( Sump, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.

178

91

16198

... More
20 Residential Quarters and Health Club;Septic Tank

-

-

-

... More
20 Residential Quarters and Health Club;Manufacture, supply, delivery and fixing of encapsulated plastic steeps as per company's standard specification including cost of materials packing as per companys standards loding transporation unloading and stacking at site of work etc,. Complete but excluding taxes and others etc,. as applicable,including all incidental, labour charges such of overheads & contractors profit etc., complete for finished item of work

18

232

4176

... More
20 Residential Quarters and Health Club;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

167

587

98029

... More
20 Residential Quarters and Health Club;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

2.66

84842

225679.72

... More
20 Residential Quarters and Health Club;Roof Slab 125 mm thick up to unsupported height of 3.66side walls

29

1600

46400

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for beam and slabs.

-

-

-

... More
20 Residential Quarters and Health Club;225 mm thick side walls

14

4083

57162

... More
20 Residential Quarters and Health Club;150 mm thick side walls

61

3366

205326

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Columens Water Tanks RCC Walls in Buildings

-

-

-

... More
20 Residential Quarters and Health Club;Haunch concrete

1.4

7175

10045

... More
20 Residential Quarters and Health Club;150 mm thick side walls

35

8915

312025

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Footings, Pedestals & Plinth Beams

-

-

-

... More
20 Residential Quarters and Health Club;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

6

4584

27504

... More
20 Residential Quarters and Health Club;Earth work excavation for ( Sump, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.

112

91

10192

... More
20 Residential Quarters and Health Club;50000 Liters Sump

-

-

-

... More
20 Residential Quarters and Health Club;Supplying & fixing Bronze Horizontal Check (Non return) Valve as per IS-778 I-class heavy duty - 40 mm NB Size including cost and conveyance of all materials and over heads and contractor profit etc., complete.

1

2721

2721

... More
20 Residential Quarters and Health Club;Supply & fixing 2 1/2" (63.5mm) dia Sluice valve ISI mark with 2 Nos. flanges, 8 nos, 3/4" dia nuts & bolts and all necessary washers and packing materials including over heads and contractor profit etc., complete.

6

5308

31848

... More
20 Residential Quarters and Health Club;90mm dia OD

160

360

57600

... More
20 Residential Quarters and Health Club;63mm dia OD

105

202

21210

... More
20 Residential Quarters and Health Club;Supply and laying of HDPE pipe of 6 Kg/Sq.cm (PE-100 Grade) for water supply conforming to IS 4984-2016 including transportation to any where in T.G, Laying and jointing of HDPE pipes by butt fusion welding as perIS:7634 ? part-II/1975 as amended from time to time to the alignment and gradient and testing the pipeline to the required pressure including over heads and contractor profit etc., complete. ( Supply upto 90 mm dia in coil & above 90 mm dia straight length in 6 M.)

-

-

-

... More
20 Residential Quarters and Health Club;41.30mm OD pipe

20

479

9580

... More
20 Residential Quarters and Health Club;54.00mm OD pipe

20

699

13980

... More
20 Residential Quarters and Health Club;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge. (SDR 11)

-

-

-

... More
20 Residential Quarters and Health Club;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of excluding seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, overheads and contractors profit, etc., complete for finished item of work as per Standard specification. 5'-0" Depth

8

16005

128040

... More
20 Residential Quarters and Health Club;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, cost of excluding seigniorage charges on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing, overheads and contractors profit, etc., complete for finished item of work as per Standard specification. 3'-0" Depth

18

9871

177678

... More
20 Residential Quarters and Health Club;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg. including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work.

16

5238

83808

... More
20 Residential Quarters and Health Club;Supplying & fixing 150 mm x 100 mm SWG gully traps conforming to ISI 651 & 4127 with C.I Grating & constructing Brick masonry in CM 1:6 prop. over a C.C. (1:5:10) prop. Bed 100mm thick and plastering 12mm thick in CM (1:4) prop. both inside and outside surfaces and fitted with 304.8 mm x 288.6mm (12" x 9") C.I. frame and hinged cover of standard make as directed by the Engineer-in-charge including cost and conveyance of all materials to site, all operational,incidental, labour charges, overheads and contractors profit, etc. complete for finished item of work. (APSS No 1326)

22

851

18722

... More
20 Residential Quarters and Health Club;203.20mm dia upto 1524mm (5') depth

105

1251

131355

... More
20 Residential Quarters and Health Club;152.40mm dia upto 1524.0mm (5') depth

160

1089

174240

... More
20 Residential Quarters and Health Club;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling watering and tamping, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work

-

-

-

... More
20 Residential Quarters and Health Club;EXTERNAL WATER SUPPLY & SEWRAGE SYSTEM

-

-

-

... More
20 Residential Quarters and Health Club;Constructing Brick masonry support for G.I pipe with C.M 304.8 x 228.6 x228.6 mm size including plastering including cost and conveyance of all materials to site, all operational,incidental , labour charges, overhead & contractor's profit etc complete for finished item of work in all floors as directed by Engineer-in-charge.

80

107

8560

... More
20 Residential Quarters and Health Club;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work.

20000

11

228000

... More
20 Residential Quarters and Health Club;110mmdia

694

530

367820

... More
20 Residential Quarters and Health Club;75mmdia

1030

360

370800

... More
20 Residential Quarters and Health Club;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads & contractors profit etc. complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326)

-

-

-

... More
20 Residential Quarters and Health Club;40mm Nominal bore

10

3152

31520

... More
20 Residential Quarters and Health Club;32mm Nominal bore

20

2337

46740

... More
20 Residential Quarters and Health Club;25mm Nominal bore

90

1538

138420

... More
20 Residential Quarters and Health Club;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

-

-

-

... More
20 Residential Quarters and Health Club;Supplying and fixing 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 in ground or on wall with GI fittings such as elbows tees couplings, nipples, plugs including excavation for trenches and refilling the trenches ,chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work except for GI bends union and GI connectors with checkout and socket Tata or Zenith make or equivalent

80

253

20240

... More
20 Residential Quarters and Health Club;Supplying and fixing 65 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 in ground or on wall with GI fittings such as elbows tees couplings, nipples, plugs including excavation for trenches and refilling the trenches ,chiselling masonry walls and making good the walls & floors to the original surface and fixing MS clamps on TW blocks on walls including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work except for GI bends union and GI connectors with checkout and socket Tata or Zenith make or equivalent

120

1102

132240

... More
20 Residential Quarters and Health Club;54.00mm OD pipe

48

699

33552

... More
20 Residential Quarters and Health Club;41.30mm OD pipe

54

479

25866

... More
20 Residential Quarters and Health Club;34.90mm OD pipe

180

386

69480

... More
20 Residential Quarters and Health Club;28.60mm OD pipe

366

284

103944

... More
20 Residential Quarters and Health Club;22.20mm OD pipe

948

237

224676

... More
20 Residential Quarters and Health Club;15.90mm OD pipe

254

197

50038

... More
20 Residential Quarters and Health Club;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge. (SDR 11)

-

-

-

... More
20 Residential Quarters and Health Club;Supplying & fixing stainless steel sink size 36" x 18" (914.4x457.2mm) 1 mm thick with accessories i including cost and conveyance of all materials to site, all operational,incidental , labour charges etc. overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

40

8568

342720

... More
20 Residential Quarters and Health Club;S&F of Chromium plated finish stainless steel body Toilet paper holder with 10 years warranty including cost and conveyance of all materials to site, all operational,incidental , labour charges, overhead & contractor's profit etc.complete for finished item of work in all floors as directed by Engineer-in-charge.

80

1126

90080

... More
20 Residential Quarters and Health Club;S&F 15 mm nominal size CP finish shower rose 200 mm dia with CP finish flexible pipe, including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

80

720

57600

... More
20 Residential Quarters and Health Club;S&F of 15 mm premium variety Chromium plated finish brass body wall mixer with hand shower with a provision for over head shower with 115 mm long bend pipe on upper side, connecting legs & wall flanges conforming to IS 8931 with 10 years warranty including cost and conveyance of all materials to site, all operational,incidental , labour charges, overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

80

4611

368880

... More
20 Residential Quarters and Health Club;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.

80

4040

323200

... More
20 Residential Quarters and Health Club;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded conenction conforming to IS 8931, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.

20

327

6540

... More
20 Residential Quarters and Health Club;Supplying and fixing 15 mm brass body CP finish self closing tap push type conforming to IS 1711 as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges, overheads & contractors profit complete for finished item of work in all floors.

40

358

14320

... More
20 Residential Quarters and Health Club;S&F powder coated stainless steel body wall mounted towel rack 600 mm long including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

80

4237

338960

... More
20 Residential Quarters and Health Club;S&F of Chromium plated finish stainless steel body Towel Ring with 10 years warranty, including all incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

20

1250

25000

... More
20 Residential Quarters and Health Club;Supplying and fixingTV shape mirror with plastic frame size 609.6 mm x 457 .2 mm best quality glass mirror with approved make 1st quality including cost and conveyance of all materials to site, all operational,incidental , labour charges etc. overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

100

641

64100

... More
20 Residential Quarters and Health Club;Supply and fixing CP finish brass soap dish of approved make with screws including cost and conveyance of all materials to site, all operational,incidental , labour charges and overhead & contractor's profit etc. complete for finished item of work as directed by Engineer-in-charge.

100

744

74400

... More
20 Residential Quarters and Health Club;Supplying & Fixing Indian make WHITE Flat Back Wash Hand Basin of size 550 x 400 mm with Single C.P. Pillar cock 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963- 1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/ Nice/ Esso or equivalent, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded onforming to IS 8931, 15 mm nominal size PVC connection with brass union nut C.P coated, 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality and standard CI brackets including wooden block, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects.

100

3687

368700

... More
20 Residential Quarters and Health Club;Supplying & Fixing Orissa Pan White glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap : 580 mm x 440 mm duly providing constructing Brick masonry seat using 2nd class bricks, CC Squatting plate in P.C.C 1:2:4, S&F PVC Low level system with internal components & short bend: 10 Litres capacity Single Flush, S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and S&F 15 mm nominal size PVC connection with brass union nut C.P coated including cost and conveyance of all materials , operational, incidental, labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.

20

6187

123740

... More
20 Residential Quarters and Health Club;Supply, Installation and commissioning approved make wash down wall mounted EWC conforming to IS:2556 (Part 16)-2002 with 'P' or 'S' trap with concealed flush cistern fixed in wall with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap all of approved make etc. complete for finished item ofwork in all respects: Whitecolour.

80

12950

1036000

... More
20 Residential Quarters and Health Club;Supplying & fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads & contractors profit etc. complete for finished item of work.

128

194

24832

... More
20 Residential Quarters and Health Club;Quarters

-

-

-

... More
20 Residential Quarters and Health Club;Constructing Brick masonry support for G.I pipe with C.M 304.8 x 228.6 x228.6 mm size including plastering including cost and conveyance of all materials to site, all operational,incidental , labour charges, overhead & contractor's profit etc complete for finished item of work in all floors as directed by Engineer-in-charge.

35

107

3745

... More
20 Residential Quarters and Health Club;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work.

5000

11

57000

... More
20 Residential Quarters and Health Club;110mmdia

81

530

42930

... More
20 Residential Quarters and Health Club;75mmdia

111

360

39960

... More
20 Residential Quarters and Health Club;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads & contractors profit etc. complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326)

-

-

-

... More
20 Residential Quarters and Health Club;32mm Nominal bore

8

2337

18696

... More
20 Residential Quarters and Health Club;25mm Nominal bore

10

1538

15380

... More
20 Residential Quarters and Health Club;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I,Indian make heavy type as approved by the Engineer including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

-

-

-

... More
20 Residential Quarters and Health Club;41.30mm OD pipe

105

479

50295

... More
20 Residential Quarters and Health Club;34.90mm OD pipe

22

386

8492

... More
20 Residential Quarters and Health Club;28.60mm OD pipe

57

284

16188

... More
20 Residential Quarters and Health Club;22.20mm OD pipe

117

237

27729

... More
20 Residential Quarters and Health Club;15.90mm OD pipe

35

197

6895

... More
20 Residential Quarters and Health Club;S&F premium make CPVC Pipes including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational,incidental , labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge. (SDR 11)

-

-

-

... More
20 Residential Quarters and Health Club;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.

16

4040

64640

... More
20 Residential Quarters and Health Club;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded conenction conforming to IS 8931, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.

14

327

4578

... More
20 Residential Quarters and Health Club;S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod with brackets and aluminium screws, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit, etc. complete for finished item of work.

11

181

1991

... More
20 Residential Quarters and Health Club;Supplying and fixingTV shape mirror with plastic frame size 609.6 mm x 457 .2 mm best quality glass mirror with approved make 1st quality including cost and conveyance of all materials to site, all operational,incidental , labour charges etc. overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

11

641

7051

... More
20 Residential Quarters and Health Club;Supply and fixing CP finish brass soap dish of approved make with screws including cost and conveyance of all materials to site, all operational,incidental , labour charges and overhead & contractor's profit etc. complete for finished item of work as directed by Engineer-in-charge.

26

744

19344

... More
20 Residential Quarters and Health Club;Supplying & Fixing Indian make WHITE Flat Back Wash Hand Basin of size 550 x 400 mm with Single C.P. Pillar cock 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963- 1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/ Nice/ Esso or equivalent, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded onforming to IS 8931, 15 mm nominal size PVC connection with brass union nut C.P coated, 30 mm nominal size dia PVC flexible waste pipe of 914.4 mm length of Ist quality and standard CI brackets including wooden block, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work in all respects.

16

3687

58992

... More
20 Residential Quarters and Health Club;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2- 2004 of white glazed with 'S' trap with CI short Connector & 4" dia CP thimble pipe: 150 mm long, best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996, PVC low level system with internal components & short bend: 10 Litres capacity Single Flush, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and 15 mm nominal size PVC connection with brass union nut C.P coated all of approved make, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.

14

7456

104384

... More
20 Residential Quarters and Health Club;Supply, Installation and commissioning approved make wash down wall mounted EWC conforming to IS:2556 (Part 16)-2002 with 'P' or 'S' trap with concealed flush cistern fixed in wall with all internal parts of dual flush cistern, ultra solid seat cover of approved make with rubber buffer and cap all of approved make etc. complete for finished item ofwork in all respects: Whitecolour.

2

12950

25900

... More
20 Residential Quarters and Health Club;Supplying & fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads & contractors profit etc. complete for finished item of work.

31

194

6014

... More
20 Residential Quarters and Health Club;Club House

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

222

1406

312132

... More
20 Residential Quarters and Health Club;Club House - First Floor

204

1406

286824

... More
20 Residential Quarters and Health Club;Club House - Ground Floor

184

1406

258704

... More
20 Residential Quarters and Health Club;Supplying and fixing 14 mm - Mineral Fibre Sheet Grid Line False Ceiling of Tegular Edge 600 x 600 of Board / Tegular/ Micro look Edge tiles with a Humidity Resistance of 90% RH, Average NRC 0.50, Light Reflectance >80%, Thermal Conductivity ? = 0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1; fixing to Gyp steel precoated GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using precoated GI Tee section (24 mm x 38 mm x 0.7 mm) from soffit at 1220 mm c/c fixed with GI Soffit Cleat, rawl plugs and steel expansion fasteners & connecting clip to the GI T section with 4 mm dia GI Rod with galvanised spring steel level clip of PVC unversal holding clips system at 1200 mm c/c and fixing the 14mm Mineral Fibre Sheet of size 600 x 600 mm in position and finishing two coats of drywall topcoat including overheads & contractors profit, etc. complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Providing 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328)

71

422

29962

... More
20 Residential Quarters and Health Club;Club House - Terrace Floor

2.43

132

320.76

... More
20 Residential Quarters and Health Club;Club House - Second Floor

48

132

6336

... More
20 Residential Quarters and Health Club;Club House - First Floor

25

132

3300

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

33

132

4356

... More
20 Residential Quarters and Health Club;Painting to new iron works with 2 coats of ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit of approved brand and shade to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. including cost of overheads & contractors profit for finished item of work for:-Painting to Iron work - Synthetic enamel paint to New Iron Work - 2 coats

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Terrace Floor

9

293

2637

... More
20 Residential Quarters and Health Club;Club House - Second Floor

43

293

12599

... More
20 Residential Quarters and Health Club;Club House - First Floor

44

293

12892

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

57

293

16701

... More
20 Residential Quarters and Health Club;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors.

-

-

-

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

4.68

1352

6327.36

... More
20 Residential Quarters and Health Club;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., including overheads & contractors profit complete for finished item of work for:-Polishing to wood work - Melamine Polishing to Wood Work.

-

-

-

... More
20 Residential Quarters and Health Club;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., including overheads & contractors profit complete for finished item of work for:-Polishing to wood work - Melamine Polishing to Wood Work.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Terrace Floor

66

503

33198

... More
20 Residential Quarters and Health Club;Club House - Second Floor

55

497

27335

... More
20 Residential Quarters and Health Club;Club House - First Floor

62

491

30442

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

66

484

31944

... More
20 Residential Quarters and Health Club;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Terrace Floor

329

285

93765

... More
20 Residential Quarters and Health Club;Club House - Second Floor

300

285

85500

... More
20 Residential Quarters and Health Club;Club House - First Floor

322

285

91770

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

428

285

121980

... More
20 Residential Quarters and Health Club;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Terrace Floor

85

159

13515

... More
20 Residential Quarters and Health Club;Club House - Second Floor

743

159

118137

... More
20 Residential Quarters and Health Club;Club House - First Floor

851

159

135309

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

687

159

109233

... More
20 Residential Quarters and Health Club;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

663

257

170391

... More
20 Residential Quarters and Health Club;Club House - First Floor

743

257

190951

... More
20 Residential Quarters and Health Club;Club House - Ground Floor

482

257

123874

... More
20 Residential Quarters and Health Club;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

13

4764

61932

... More
20 Residential Quarters and Health Club;Club House - First Floor

18

4764

85752

... More
20 Residential Quarters and Health Club;Club House - Ground Floor

12

4764

57168

... More
20 Residential Quarters and Health Club;Supply and fixing of box type cup board using Cement Bonded Particle Board conforming to IS 14276 for making frame of size 100mm x 35mm using two sandwiched 16MM boards, one Cement Bonded Particle Board conforming to IS 14276 and one Cement Bonded Prelaminated Particle Board with plain 35mm wood lipping. The Shutters are made of 16MM thick Cement Bonded Prelaminated Particle Board (Pre-Laminated Cement Bonded Particle Board) of approved shade inclusive of hardware like M.S. powder coated Piano hinges of size ¾? x ¾? , Aluminium powder coated handles of size 4? (101.6mm), Aluminium tower bolt 4? (101.6mm) Godrej locks, screws, wood lipping and synthetic glue, cost of overheads and contractors profit, etc., complete finish item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

78

765

59670

... More
20 Residential Quarters and Health Club;Club House - First Floor

124

765

94860

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

78

765

59670

... More
20 Residential Quarters and Health Club;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Ground Floor

4

2945

11780

... More
20 Residential Quarters and Health Club;RCM facia 50mm thick in CM (1:3) (with 50% river sand & 50% manufactured sand) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer - In - Charge with dubara sponge finishing,including cost and conveyance of all materials to site, all operationals &incidental charges,cost and conveyance of cement,wire mesh,water to work site,centering,scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) and form work,lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Terrace Floor

37

156

5772

... More
20 Residential Quarters and Health Club;Club House - Second Floor

720

156

112320

... More
20 Residential Quarters and Health Club;Club House - First Floor

375

156

58500

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

495

156

77220

... More
20 Residential Quarters and Health Club;Supplying and fixing of MS doors, grill to windows, ventilators / in open court yards using MS square bars, cutting and fabricating to required sizes and shapes, placing in position as per approved designs and drawings, including cost and conveyance of all Mild steel sections and all wastages such as overlaps, couplings, welded joints, etc., and all operational, incidental charges, Including Labour charges for fabricating all heavy steel works like Trusses,Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc and Labour charges for fixing Trusses, Stanchions, Heavy Beams and Girders erecting and fixing in position by using chain pulley blocks, Derek pole arrangements and cranes etc., including overheads and contractor's profit complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

1.89

7279

13757.31

... More
20 Residential Quarters and Health Club;Club House - First Floor

2.43

7279

17687.97

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

1.35

7279

9826.65

... More
20 Residential Quarters and Health Club;Providing, supplying & fixing of Fixed Louvered Ventilator made from multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists of a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractor profit etc., complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Terrace Floor

2.43

8088

19653.84

... More
20 Residential Quarters and Health Club;Club House - Second Floor

45.63

8088

369055.44

... More
20 Residential Quarters and Health Club;Club House - First Floor

22

8088

177936

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

31.59

8088

255499.92

... More
20 Residential Quarters and Health Club;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

8.06

6751

54429.94

... More
20 Residential Quarters and Health Club;Club House - First Floor

9.68

6751

65315.93

... More
20 Residential Quarters and Health Club;Club House - Grounf Floor

7.87

6751

53163.99

... More
20 Residential Quarters and Health Club;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Flush door shutters of 30 mm thick solid bond wood block board type with commercial ply ON BOTH faces conforming to IS:2202 and providing and fixing PVC door cladding to the flush doors shutter it shall be pasted with synthetic glue 1 mm thick including cost of Aluminium fixtures 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1 No. Latch - 300 mm long, 2 Nos. handles of 150 mm size and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work. Toilet door(D4)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Terrace Floor

3.78

5893

22275.54

... More
20 Residential Quarters and Health Club;Club House - Second Floor

3.87

5893

22805.91

... More
20 Residential Quarters and Health Club;Club House - First Floor

1.94

5893

11403

... More
20 Residential Quarters and Health Club;Club House - Ground Floor

1.94

5893

11403

... More
20 Residential Quarters and Health Club;Supplying and fixing SINGLE shutter door using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and flush door shutters of 35mm thick solid bond wood block board type with commercial ply ON BOTH faces conforming to IS:2202, including cost of Stainles steel fixtures, 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, Aluminium 1No. Latche-300mm long, 3 Nos. Hinges-125 mm long and 2 Nos. handles of 150 mm size, 1 no. rubber bush & Aluminium 1 No. heavy duty door stopper including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, cost of overheads & Contractor's profit etc., complete for finished item of work as per APSS 1001 & 1002 (Door size : 0.9X2.15m - D3)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

4.51

6727

30372

... More
20 Residential Quarters and Health Club;Club House - First Floor

13.55

6727

91150.85

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

4.51

6727

30372

... More
20 Residential Quarters and Health Club;Supplying and fixing SINGLE shutter door using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and flush door shutters of 35mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202, including cost of SS fixtures, 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, Aluminium 1No. Latche-300mm long, 3 Nos. Hinges-125 mm long and 2 Nos. handles of 150 mm size, 1 no. rubber bush & Aluminium 1 No. heavy duty door stopper including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, cost of overheads & Contractor's profit etc., complete for finished item of work as per APSS 1001 & 1002 (Door size : 1.05X2.15m - D3)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

3.12

6209

19372.08

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

3.12

6209

19372.08

... More
20 Residential Quarters and Health Club;Supplying and fixing DOUBLE SHUTTER DOOR WITH FIXED FAN LIGHT using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and Flush door shutters of 35 mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202 as per drawing including cost of Stainless steel fixtures of 2 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, Aluumium 1No. Latche-300mm long, 4 Nos. handles of 150 mm size & Aluminium 2 No. heavy duty door stopper, 2 no rubber bushes. 6Nos Hinges of 125mm and 4mm thick pin headed glass in the ventilator portion including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc.cost of overhead & contractor's profit complete for finished item of work as per APSS 1001 & 1002 (Door size :D2-1.20*2.60)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

9.36

5697

53323.92

... More
20 Residential Quarters and Health Club;Club House - First Floor

4.68

5697

26661.96

... More
20 Residential Quarters and Health Club;Club House - Ground Floor

7.8

5697

44436.6

... More
20 Residential Quarters and Health Club;Supplying and fixing DOUBLE SHUTTER DOOR WITH FIXED FAN LIGHT using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and Flush door shutters of 35 mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202 as per drawing including cost of Stainless steel fixtures of 2 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1No. Aluminium Latche-300mm long, 4 Nos. handles of 150 mm size & 2 No.Aluminium heavy duty door stopper, 2 no rubber bushes. 6Nos Hinges of 125mm and 4mm thick pin headed glass in the ventilator portion including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc.cost of overhead & contractor's profit complete for finished item of work as per APSS 1001 & 1002 (Door size :D1-1.50*2.60)

-

-

-

... More
20 Residential Quarters and Health Club;(MAIN DOOR) Supplying and fixing DOUBLE SHUTTER DOOR WITH FIXED FAN LIGHT at top ( MAN DOOR)using Medium Teak Wood frame of section of 100*150 MM and Medium teak wood fully panelled Shutters i.e,. top rail bottem rail middle rail and styles of sections 150x45mm and 20mm thick teak wood planks fixed 12mmx12mm teak wood beading alround,4mm thick oin headed glass fixed with 12mmz12mm teak wood beading alround,4mm thickwith encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and Flush door shutters of 35 mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202 as per drawing including cost of Stainless steel fixtures of 2 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, Aluumium 1No. Latche-300mm long, 4 Nos. handles of 150 mm size & Aluminium 2 No. heavy duty door stopper, 2 no rubber bushes. 6Nos Hinges of 125mm and 4mm thick pin headed glass in the ventilator portion including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc.cost of overhead & contractor's profit complete for finished item of work as per APSS 1001 & 1002 (Door size :D2-1.20*2.60)

4.68

12151

56866.68

... More
20 Residential Quarters and Health Club;Club House - Second Floor

2

5351

10702

... More
20 Residential Quarters and Health Club;Club House - First Floor

2

5256

10512

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

2

5161

10322

... More
20 Residential Quarters and Health Club;Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

17

1393

23681

... More
20 Residential Quarters and Health Club;Club House - First Floor

19

1340

25460

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

12

1288

15456

... More
20 Residential Quarters and Health Club;Skirting with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

9

5106

45954

... More
20 Residential Quarters and Health Club;Club House - First Floor

9

5042

45378

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

9

4977

44793

... More
20 Residential Quarters and Health Club;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of premium colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

49

1600

78400

... More
20 Residential Quarters and Health Club;Club House - First Floor

62

1547

95914

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

50

1495

74750

... More
20 Residential Quarters and Health Club;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

-

-

-

... More
20 Residential Quarters and Health Club;Terrace Floor

31

557

17267

... More
20 Residential Quarters and Health Club;Grounf Floor

6

453

2718

... More
20 Residential Quarters and Health Club;Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal sand (with 50% river sand & 50% manufactured sand) and water, overheads & contractors profit, complete for finished item of work. (APSS No.701 & 710).

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

9

7210

64890

... More
20 Residential Quarters and Health Club;Club House - First Floor

9

7019

63171

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

14

6827

95578

... More
20 Residential Quarters and Health Club;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

5

4645

23225

... More
20 Residential Quarters and Health Club;Club House - First Floor

5

4579

22895

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

8

4513

36104

... More
20 Residential Quarters and Health Club;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

10

6544

65440

... More
20 Residential Quarters and Health Club;Club House - First Floor

6

6448

38688

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

8

6352

50816

... More
20 Residential Quarters and Health Club;Providing Sills with 16 to 18mm thick high polished granite stone slabs of regular colour (other than black) length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using Manufactured sand(Rock sand) and natural river sand in the ratio of 50:50 over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding on both the edges of sill, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work (S.S.701 & special)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

4

4358

17432

... More
20 Residential Quarters and Health Club;Club House - First Floor

12

4262

51144

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

14

4166

58324

... More
20 Residential Quarters and Health Club;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)-Kitchen Plotforms

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

4

4905

19620

... More
20 Residential Quarters and Health Club;Club House - First Floor

4

4809

19236

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

62

4713

292206

... More
20 Residential Quarters and Health Club;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

222

1401

311022

... More
20 Residential Quarters and Health Club;Club House - First Floor

204

1349

275196

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

184

1297

238648

... More
20 Residential Quarters and Health Club;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

17

1068

18156

... More
20 Residential Quarters and Health Club;Club House - First Floor

22

1016

22352

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

17

963

16371

... More
20 Residential Quarters and Health Club;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Third Floor

367

728

267176

... More
20 Residential Quarters and Health Club;Club House - Second Floor

31

681

21111

... More
20 Residential Quarters and Health Club;Club House - First Floor

31

634

19654

... More
20 Residential Quarters and Health Club;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Third Floor

414

703

291042

... More
20 Residential Quarters and Health Club;Club House - Second Floor

937

649

608113

... More
20 Residential Quarters and Health Club;Club House - First Floor

1049

595

624155

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

809

541

437669

... More
20 Residential Quarters and Health Club;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

-

-

-

... More
20 Residential Quarters and Health Club;Flush Pointing to RR/CRS Masonry in CM(1:3)(with 50% river sand & 50% manufactured sand), including all cost and convenyance of all materials in site curing, labour chrges etc, and overheads & contractors profit, complete for finished item of work.

81

112

9072

... More
20 Residential Quarters and Health Club;Club House - Third Floor

31

745

23095

... More
20 Residential Quarters and Health Club;Club House - Second Floor

37

685

25345

... More
20 Residential Quarters and Health Club;Club House - First Floor

49

626

30674

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

185

566

104710

... More
20 Residential Quarters and Health Club;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

0.2

86915

17383

... More
20 Residential Quarters and Health Club;Club House - First Floor

0.3

85282

25584.6

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

0.36

83649

30113.64

... More
20 Residential Quarters and Health Club;Providing Mild steel (MS) steel bars ( (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials and cost of overheads & contractors profit etc., complete for finished item of work in all floors.( APSS No.126)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Third Floor

2.4

89742

215380.8

... More
20 Residential Quarters and Health Club;Club House - Second Floor

8.9

88108

784161.2

... More
20 Residential Quarters and Health Club;Club House - First Floor

8.2

86475

709095

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

24.6

84842

2087113.2

... More
20 Residential Quarters and Health Club;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

7

3957

27699

... More
20 Residential Quarters and Health Club;Club House - First Floor

7

3766

26362

... More
20 Residential Quarters and Health Club;Providing and laying cinder concrete in cement cinder mix (1:15) prop. using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyance of all materials, water to work site, all operational, incidental, labour charges, such as mixing cement & cinder, cost of overheads and contractor's profit etc. complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Reinforced Cement Concrete(1:5:10)proporation nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy colomns using coarse e 40mm size (SS5) hard , Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, machine mixing, vibrating lifting conncreate machnically laying concrete curing overheads & contractors profit centring using Steel scaffolding pipes jack Props, wallers, Foot plates, breakers, steel Centering plates etc., including all oprational incidental and labour charges etc,. complete but excluding cost of steel and its fabrication chrges for finished item of work upto un supported height up to 3.66 m for dummy clomns (APSS No. 402).

4

16030

64120

... More
20 Residential Quarters and Health Club;Club House - Second Floor

1

6315

6315

... More
20 Residential Quarters and Health Club;Club House - First Floor

1

6065

6065

... More
20 Residential Quarters and Health Club;Club House - Ground Floor

1

5815

5815

... More
20 Residential Quarters and Health Club;Club House - SILL SLABS - Stilt Floor

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Terrace Floor

0.2

6565

1315.99

... More
20 Residential Quarters and Health Club;Club House - Second Floor

2

6315

12630

... More
20 Residential Quarters and Health Club;Club House - First Floor

2

6065

12130

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

2

5815

11630

... More
20 Residential Quarters and Health Club;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

71

1199

85129

... More
20 Residential Quarters and Health Club;Club House - First Floor

71

1104

78384

... More
20 Residential Quarters and Health Club;Club House -Ground Floor

80

1010

80800

... More
20 Residential Quarters and Health Club;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, and cost of overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Third Floor

45

11027

496191.84

... More
20 Residential Quarters and Health Club;Club House - Second Floor

38

10424

396112

... More
20 Residential Quarters and Health Club;Club House - First Floor

39

9820

382980

... More
20 Residential Quarters and Health Club;Club House -Stilt Floor

60

9216

552960

... More
20 Residential Quarters and Health Club;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504).

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

9

1369

12321

... More
20 Residential Quarters and Health Club;Club House - First Floor

22

1321

29062

... More
20 Residential Quarters and Health Club;Club House - GroundFloor

8

1274

10192

... More
20 Residential Quarters and Health Club;Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

8

768

6144

... More
20 Residential Quarters and Health Club;Club House - First Floor

22

748

16456

... More
20 Residential Quarters and Health Club;Club House - Stilt Floor

18

729

13122

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Platforms 50 mm thick .

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Second Floor

26

1306

33956

... More
20 Residential Quarters and Health Club;Club House - First Floor

16

1242

19872

... More
20 Residential Quarters and Health Club;Club House -Stilt Floor

20

1181

23620

... More
20 Residential Quarters and Health Club;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903)

-

-

-

... More
20 Residential Quarters and Health Club;Club House - STEPS - Second Floor

1

9145

9145

... More
20 Residential Quarters and Health Club;Club House - STEPS - First Floor

1

9032

9032

... More
20 Residential Quarters and Health Club;Club House - STEPS - Stilt Floor

1

8918

8918

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for

-

-

-

... More
20 Residential Quarters and Health Club;Club House - ROOF SLAB 150mm THICK - Fifth Floor

26

2485

64610

... More
20 Residential Quarters and Health Club;Club House - ROOF SLAB 150mm THICK - Fourth Floor

2

21322

42644

... More
20 Residential Quarters and Health Club;Club House - ROOF SLAB 150mm THICK - Third Floor

8

1860

14880

... More
20 Residential Quarters and Health Club;Club House - ROOF SLAB 150mm THICK - Second Floor

16

1822

29152

... More
20 Residential Quarters and Health Club;Club House - ROOF SLAB 150mm THICK - First Floor

16

1782

28512

... More
20 Residential Quarters and Health Club;Club House - ROOF SLAB 150mm THICK - Stilt Floor

16

1744

27904

... More
20 Residential Quarters and Health Club;Club House - ROOF SLAB 125mm THICK - Third Floor

31

1717

53227

... More
20 Residential Quarters and Health Club;Club House - ROOF SLAB 125mm THICK - Second Floor

351

1679

589329

... More
20 Residential Quarters and Health Club;Club House - ROOF SLAB 125mm THICK - First Floor

353

1639

578567

... More
20 Residential Quarters and Health Club;Club House - ROOF SLAB 125mm THICK - Stilt Floor

327

1600

523200

... More
20 Residential Quarters and Health Club;Club House - ROOF BEAMS - Third Floor

3

14551

43653

... More
20 Residential Quarters and Health Club;Club House - ROOF BEAMS - Second Floor

17

14211

241587

... More
20 Residential Quarters and Health Club;Club House - ROOF BEAMS - First Floor

13

13868

180284

... More
20 Residential Quarters and Health Club;Club House - ROOF BEAMS - Stilt Floor

17

13526

229942

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Third Floor

0.2

17382

3407.91

... More
20 Residential Quarters and Health Club;Club House - Second Floor

3

16495

49485

... More
20 Residential Quarters and Health Club;Club House - First Floor

2

15609

31218

... More
20 Residential Quarters and Health Club;Club House - Stilt Floor

2

14722

29444

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Third Floor

5.7

15614

88999.8

... More
20 Residential Quarters and Health Club;Club House - Second Floor

20

15206

304120

... More
20 Residential Quarters and Health Club;Club House- First Floor

20

14798

295960

... More
20 Residential Quarters and Health Club;Club House - Stilt Floor

31

14391

446121

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, in BUILDINGS.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - 150M Thick Side Walls - Ground Floor

16

3367

53872

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, WATER TANKS, RCC WALLS in BUILDINGS.

-

-

-

... More
20 Residential Quarters and Health Club;Club House - Plinth Beams

15

12831

192465

... More
20 Residential Quarters and Health Club;Club House -Pedestals

14

9670

135380

... More
20 Residential Quarters and Health Club;Club House -FOOTING

174

8918

1551732

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Footings, Pedestals & Plinth Beams

-

-

-

... More
20 Residential Quarters and Health Club;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand (with 50% river sand & 50% manufactured sand), water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc., complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

41

4518

185238

... More
20 Residential Quarters and Health Club;Pre construction Anti termite is a process in which chemical toxic to sub terrain termites is apply/ inject into soil during early stage of building Construction Treatment of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the columns , plinth beams (Back filling) walls and floor junction, external perimeters, along retaining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around columns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for spraying, rodding, cost of overheads and contractors profit, etc. complete for furnished item of work as per the approval of the Engineer-in-charge (Plinth area measurements will be taken for payment)

369

165

60885

... More
20 Residential Quarters and Health Club;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No. 402) MACHINE MIXING

36

4392

158112

... More
20 Residential Quarters and Health Club;Filling with carted gravel in trenches sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)

187

533

99671

... More
20 Residential Quarters and Health Club;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)

479

229

109691

... More
20 Residential Quarters and Health Club;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

42

4584

192528

... More
20 Residential Quarters and Health Club;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.Upto 3M Depth

705

159

112095

... More
20 Residential Quarters and Health Club;FOR CLUB HOUSE

-

-

-

... More
20 Residential Quarters and Health Club;Providing 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328)

540

422

227880

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

278

1406

390868

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

278

1406

390868

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

278

1406

390868

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

278

1406

390868

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

278

1406

390868

... More
20 Residential Quarters and Health Club;Supplying and fixing 14 mm - Mineral Fibre Sheet Grid Line False Ceiling of Tegular Edge 600 x 600 of Board / Tegular/ Micro look Edge tiles with a Humidity Resistance of 90% RH, Average NRC 0.50, Light Reflectance >80%, Thermal Conductivity ? = 0.052 to 0.057 w/mk, Fire Performance Class 0/Class 1; fixing to Gyp steel precoated GI wall angle of size 25 mm x 25 mm x of 0.70 mm thick along the perimeter of ceiling screw fixed to brick work/ partition at 610 mm c/c and suspending the frame work using precoated GI Tee section (24 mm x 38 mm x 0.7 mm) from soffit at 1220 mm c/c fixed with GI Soffit Cleat, rawl plugs and steel expansion fasteners & connecting clip to the GI T section with 4 mm dia GI Rod with galvanised spring steel level clip of PVC unversal holding clips system at 1200 mm c/c and fixing the 14mm Mineral Fibre Sheet of size 600 x 600 mm in position and finishing two coats of drywall topcoat including overheads & contractors profit, etc. complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

128

522

66816

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

188

515

96820

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

188

509

95692

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

188

503

94564

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

188

497

93436

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

188

491

92308

... More
20 Residential Quarters and Health Club;Providing and applying Exterior grade texture ready mixed paint with sand texture added sand particles Acrylic copolymers and mineral compounds, bactericides and various additives having VOC (Volatile Organic Compound) content less than 30 grams/ Lit or equivalent of average 2 to 3 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying texture paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads and contractors profit for finished item of work for external walls - including cost of access scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) for:-External Colouring - Providing / Texture to External walls.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

12.96

132

1710.72

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

100.44

132

13258.08

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

100.44

132

13258.08

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

100.44

132

13258.08

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

100.44

132

13258.08

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

100.44

132

13258.08

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

74.52

132

9836.64

... More
20 Residential Quarters and Health Club;Painting to new iron works with 2 coats of ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit of approved brand and shade to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. including cost of overheads & contractors profit for finished item of work for:-Painting to Iron work - Synthetic enamel paint to New Iron Work - 2 coats

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

28

293

8204

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

76

293

22268

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

76

293

22268

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

76

293

22268

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

76

293

22268

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

76

293

22268

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

166

293

48638

... More
20 Residential Quarters and Health Club;Painting to new wood work with luppam finish to give even & smooth surface and painting two coats with ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat, including cost and conveyance of all materials to site, all labour charges , including sand paper on lappam coats for neat even and glossy surface, including cost of overheads & contractors profit, etc. complete for finished item of work as directed by Engineer-in-charge during exection - for all floors.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

184

1352

248768

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

144

1352

194688

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

184

1352

248768

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

144

1352

194688

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

184

1352

248768

... More
20 Residential Quarters and Health Club;Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., including overheads & contractors profit complete for finished item of work for:-Polishing to wood work - Melamine Polishing to Wood Work.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

434

159

69006

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

3410

159

542190

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

3412

159

542508

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

3410

159

542190

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

3412

159

542508

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

3410

159

542190

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

3182

159

505938

... More
20 Residential Quarters and Health Club;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

632

285

180120

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

1010

285

287850

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

1010

285

287850

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

1010

285

287850

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

1010

285

287850

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

1010

285

287850

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

570

285

162450

... More
20 Residential Quarters and Health Club;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

2168

257

557176

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

2168

257

557176

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

2168

257

557176

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

2168

257

557176

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

2168

257

557176

... More
20 Residential Quarters and Health Club;Providing and applying synthetic plaster putty or equivalent putty of white cement or polymer or cement based such as birla wall care putty or equivalent of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying putty paint filler by putty knife / muslin pad, air dry for 2 - 3 hrs for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for internal walls - :-Internal Colouring - Providing Putty.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

100

4764

476400

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

100

4764

476400

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

100

4764

476400

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

100

4764

476400

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

100

4764

476400

... More
20 Residential Quarters and Health Club;Supply and fixing of box type cup board using Cement Bonded Particle Board conforming to IS 14276 for making frame of size 100mm x 35mm using two sandwiched 16MM boards, one Cement Bonded Particle Board conforming to IS 14276 and one Cement Bonded Prelaminated Particle Board with plain 35mm wood lipping. The Shutters are made of 16MM thick Cement Bonded Prelaminated Particle Board (Pre-Laminated Cement Bonded Particle Board) of approved shade inclusive of hardware like M.S. powder coated Piano hinges of size ¾? x ¾? , Aluminium powder coated handles of size 4? (101.6mm), Aluminium tower bolt 4? (101.6mm) Godrej locks, screws, wood lipping and synthetic glue, cost of overheads and contractors profit, etc., complete finish item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

422

765

322830

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

422

765

322830

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

422

765

322830

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

422

765

322830

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

422

765

322830

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

116

765

88740

... More
20 Residential Quarters and Health Club;Supplying and fixing stainless steel works such as raling, hand rale, grills etc., using Stainless Steel Tubes, sections, plates, sheets & pipes of all sizes & Diameters for - 304 Grade as per the approved drawing including cost and conveyance of all materials to site, Labour charges for Fabrication of stainless steel works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish, overheads & contractors profit etc ., complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

18

3755

67590

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

18

3593

64674

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

18

3431

61758

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

18

3269

58842

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

18

3107

55926

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

6

2945

17670

... More
20 Residential Quarters and Health Club;RCM facia 50mm thick in CM (1:3) (with 50% river sand & 50% manufactured sand) using screened sand for drop walls, fins with rabbit wire mesh & nomianl reinforcement as directred by Engineer - In - Charge with dubara sponge finishing,including cost and conveyance of all materials to site, all operationals &incidental charges,cost and conveyance of cement,wire mesh,water to work site,centering,scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) and form work,lift charges etc., and overheads & contractors profit complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work(APSS NO.403&903)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

195

156

30420

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

1507

156

235092

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

1507

156

235092

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

1507

156

235092

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

1507

156

235092

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

1507

156

235092

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

1118

156

174408

... More
20 Residential Quarters and Health Club;Supplying and fixing of MS doors, grill to windows, ventilators / in open court yards using MS square bars, cutting and fabricating to required sizes and shapes, placing in position as per approved designs and drawings, including cost and conveyance of all Mild steel sections and all wastages such as overlaps, couplings, welded joints, etc., and all operational, incidental charges, Including Labour charges for fabricating all heavy steel works like Trusses,Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc and Labour charges for fixing Trusses, Stanchions, Heavy Beams and Girders erecting and fixing in position by using chain pulley blocks, Derek pole arrangements and cranes etc., including overheads and contractor's profit complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

8.64

7279

62890.56

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

8.64

7279

62890.56

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

8.64

7279

62890.56

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

8.64

7279

62890.56

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

8.64

7279

62890.56

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

10.8

7279

78613.2

... More
20 Residential Quarters and Health Club;Providing, supplying & fixing of Fixed Louvered Ventilator made from multi chambered uPVC sections with Glazing bead shall be co-extruded with Grey colour soft PVC. having isolated drainage and reinforced with Galvanized Iron profiles throughout the window. The outer frame having an overall size of 60 mm x 55 mm x 2.40 with reinforcement of 1 mm thickness and Mullion with overall size of 74 mm x 60 mm x 2.40 mm with reinforcement of 1 mm thickness. (Composition of profile shall consists of a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin).Ventilator shall be provided with 4.5 mm Pin Head glass, standard hardware. Wall thickness of frame & Mullion shall be 2.4 mm., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site including overheads and contractor profit etc., complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

12.96

8088

104820.48

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

91.8

8088

742478.4

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

91.8

8088

742478.4

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

91.8

8088

742478.4

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

91.8

8088

742478.4

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

91.8

8088

742478.4

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

63.72

8088

515367.36

... More
20 Residential Quarters and Health Club;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

20.16

7750

156240

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

20.16

7750

156240

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

20.16

7750

156240

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

20.16

7750

156240

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

20.16

7750

156240

... More
20 Residential Quarters and Health Club;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding doors with mesh shutter provision ? (2-glass shutters)- 95 -Series duly manufactured using UPVC reinforced profiles(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (108 mm x 45 mm)/(95.50 mm x 60 mm) x 2.20 mm for outer frames, (75 mm x 39 mm)/(66 mm x 42 mm) x 2.20 mm for sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be coextruded with Grey colour soft PVC. Door shall be provided with standard hardware & multi point locking system of Patio/Bent espagulate .the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

33.6

6751

226833.6

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

26.88

6751

181466.88

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

33.6

6751

226833.6

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

26.88

6751

181466.88

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

33.6

6751

226833.6

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

31.5

6751

212656.5

... More
20 Residential Quarters and Health Club;Providing and fixing factory made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and including Flush door shutters of 30 mm thick solid bond wood block board type with commercial ply ON BOTH faces conforming to IS:2202 and providing and fixing PVC door cladding to the flush doors shutter it shall be pasted with synthetic glue 1 mm thick including cost of Aluminium fixtures 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, 1 No. Latch - 300 mm long, 2 Nos. handles of 150 mm size and 3 nos of butt hinges of 125mm including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, overheads & contractors profit etc., complete for finished item of work. Toilet door(D4)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

15.12

6727

101712.24

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

59.64

6727

401198.28

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

51.24

6727

344691.48

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

59.64

6727

401198.28

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

51.24

6727

344691.48

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

59.64

6727

401198.28

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

42

6727

282534

... More
20 Residential Quarters and Health Club;Supplying and fixing SINGLE shutter door using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and flush door shutters of 35mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202, including cost of SS fixtures, 1 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, Aluminium 1No. Latche-300mm long, 3 Nos. Hinges-125 mm long and 2 Nos. handles of 150 mm size, 1 no. rubber bush & Aluminium 1 No. heavy duty door stopper including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame, cost of overheads & Contractor's profit etc., complete for finished item of work as per APSS 1001 & 1002 (Door size : 1.05X2.15m - D3)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

12.48

6209

77488.32

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

12.48

6209

77488.32

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

12.48

6209

77488.32

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

12.48

6209

77488.32

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

12.48

6209

77488.32

... More
20 Residential Quarters and Health Club;Supplying and fixing DOUBLE SHUTTER DOOR WITH FIXED FAN LIGHT using solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast and Flush door shutters of 35 mm thick solid bond wood block board type with Teak ply ON BOTH faces conforming to IS:2202 as per drawing including cost of Stainless steel fixtures of 2 No tower bolt of 250x10mm dia, 1 No. Aldrops - 300 mm long, Aluumium 1No. Latche-300mm long, 4 Nos. handles of 150 mm size & Aluminium 2 No. heavy duty door stopper, 2 no rubber bushes. 6Nos Hinges of 125mm and 4mm thick pin headed glass in the ventilator portion including fixing the fixtures to door with required no. of screws, bolts and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc.cost of overhead & contractor's profit complete for finished item of work as per APSS 1001 & 1002 (Door size :D2-1.20*2.60)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

4

2478

9912

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

4

2413

9652

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

4

2348

9392

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

4

2284

9136

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

4

2219

8876

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

8

2154

17232

... More
20 Residential Quarters and Health Club;Providing skirting with Granite stone tiles 8 mm thick (mirror polished) of premium quality set over base coat of CM (1:5) 12mm thick with Grey cement slurry of honey like consistency spread at the rate of 3.3 Kgs of cement per Sq.m and jointed with white cement to full depth (joints of stone should be flushed)including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, etc., to site, cost of base coat all labour charges like dressing to the required size, mixing of mortar, curing and lift charges including cutting the brick wall to place the stones and redoing the surface smooth and overheads & contractors profit, complete for finished item of works (APSS No.707 & 701). The skirting should flush online with plastering.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

6

5636

33816

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

6

5541

33246

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

6

5446

32676

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

6

5351

32106

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

6

5256

31536

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

6

5161

30966

... More
20 Residential Quarters and Health Club;Skirting with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of regular colours (other than black) in single piece with edges flat nosed set over a base coat of CM (1:5) 12 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work (APSS No.701 & 707)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

90

1549

139410

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

90

1497

134730

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

90

1445

130050

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

90

1393

125370

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

90

1340

120600

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

54

1288

69552

... More
20 Residential Quarters and Health Club;Skirting with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

18

5301

95418

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

18

5236

94248

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

18

5171

93078

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

18

5106

91908

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

18

5042

90756

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

16

4977

79632

... More
20 Residential Quarters and Health Club;Providing cladding with 16 to 18 mm thick High Polished Granite up to 8'-00 (2.43 M) of premium colours (other than black) in single piece set over a base coat of CM (1:3) 20 mm thick with grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement sand (with 50% river sand & 50% manufactured sand), water flooring stones etc. to site, cost of base coat and all operational and labour charges such as mixing mortar, dressing, fixing in position, lift charges, cost of overheads & contractors profit etc. complete for finished item of work. (APSS No.701 & 707)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

254

1757

446278

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

254

1704

432816

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

254

1652

419608

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

254

1600

406400

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

254

1547

392938

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

326

1495

487370

... More
20 Residential Quarters and Health Club;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

18

7786

140148

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

18

7594

136692

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

18

7402

133236

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

18

7210

129780

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

18

7019

126342

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

24

6827

163848

... More
20 Residential Quarters and Health Club;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for treads (S.S.701 & special)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

10

4843

48430

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

10

4777

47770

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

10

4711

47110

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

10

4645

46450

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

10

4579

45790

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

14

4513

63182

... More
20 Residential Quarters and Health Club;Providing 16 to 18mm thick high polished granite stone slabs of regular colours (other than black) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand (with 50% river sand & 50% manufactured sand) , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work for Risers (S.S.701 & special)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

20

6833

136660

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

20

6737

134740

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

20

6641

132820

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

20

6544

130880

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

20

6448

128960

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

14

6352

88928

... More
20 Residential Quarters and Health Club;Providing Sills with 16 to 18mm thick high polished granite stone slabs of regular colour (other than black) length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using Manufactured sand(Rock sand) and natural river sand in the ratio of 50:50 over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding on both the edges of sill, polishing charges and cost of base coat and overheads & contractors profit, complete for finished item of work (S.S.701 & special)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

12

4647

55764

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

12

4550

54600

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

12

4454

53448

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

12

4358

52296

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

12

4262

51144

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

26

4166

108316

... More
20 Residential Quarters and Health Club;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)-Kitchen Plotforms

-

-

-

... More
20 Residential Quarters and Health Club;Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any shades set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade, cost of all materials like cement, sand (with 50% river sand & 50% manufactured sand) water and tiles etc., overheads and contractors profit, complete for finished item of work.- Stilt Floor

420

916

384720

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

86

2286

196596

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

86

2234

192124

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

86

2182

187652

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

86

2129

183094

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

86

2077

178622

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

94

2025

190350

... More
20 Residential Quarters and Health Club;Flooring with Granite stone tiles 8 mm thick (mirror polished) of premium quality set over a base coat of CM (1:8) prop. 12 mm thick and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., and overheads & contractors profit, complete for finished item of work. (APSS No.707 & 701)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

12

5194

62328

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

12

5097

61164

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

12

5001

60012

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

12

4905

58860

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

12

4809

57708

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

12

4713

56556

... More
20 Residential Quarters and Health Club;Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) of regular colours (other than black) set over a base coat of CM (1:8) prop. 20mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work . (APSS No.701 & 707)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

802

1558

1249516

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

802

1506

1207812

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

802

1454

1166108

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

802

1401

1123602

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

802

1349

1081898

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

500

1297

648500

... More
20 Residential Quarters and Health Club;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

56

1225

68600

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

56

1173

65688

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

56

1120

62720

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

56

1068

59808

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

56

1016

56896

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

52

963

50076

... More
20 Residential Quarters and Health Club;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)

-

-

-

... More
20 Residential Quarters and Health Club;Granolithic Concrete flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal and screened sand laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal sand (with 50% river sand & 50% manufactured sand) and water, overheads & contractors profit, complete for finished item of work. (APSS No.701 & 710)- Terrace Floor

66

661

43626

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

1252

869

1087988

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

136

822

111792

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

136

775

105400

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

136

728

99008

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

136

681

92616

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

136

634

86224

... More
20 Residential Quarters and Health Club;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

846

864

730944

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

3578

810

2898180

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

3578

756

2704968

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

3578

703

2515334

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

3578

649

2322122

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

3578

595

2128910

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

2524

541

1365484

... More
20 Residential Quarters and Health Club;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

-

-

-

... More
20 Residential Quarters and Health Club;Plastering 20mm thick using screened sand with CM (1:5) (with 50% river sand and 50% Manufactured sand) including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, curing, cutting grooves as directed by Engineer - in - charge and cost of overheads & contractors profit etc., complete for finished item of work for basement. (SS 901,903 & 904)- Stilt Floor

84

265

22260

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

212

924

195888

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

700

865

605500

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

700

805

563500

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

700

745

521500

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

700

685

479500

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

700

626

438200

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

1122

566

635052

... More
20 Residential Quarters and Health Club;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

1.2

91815

110178

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

1.2

90182

108218.4

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

1.2

88549

106258.8

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

1.2

86915

104298

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

1.2

85282

102338.4

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

1.2

83649

100378.8

... More
20 Residential Quarters and Health Club;Providing Mild steel (MS) steel bars ( (Fe 250 grade as per IS 432) of different diameters including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials and cost of overheads & contractors profit etc., complete for finished item of work in all floors.( APSS No.126)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

8

94641

757128

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

33.4

93008

3106467.2

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

32.2

91375

2942275

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

33.4

89742

2997382.8

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

32.2

88108

2837077.6

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

33.4

86475

2888265

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

86.8

84842

7364285.6

... More
20 Residential Quarters and Health Club;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

30

4531

135930

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

30

4340

130200

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

30

4148

124440

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

30

3957

118710

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

30

3766

112980

... More
20 Residential Quarters and Health Club;Providing and laying cinder concrete in cement cinder mix (1:15) prop. using 12.5 mm nominal size cinder laid in layers and compacted as directed for filling sunken floors including cost and conveyance of all materials, water to work site, all operational, incidental, labour charges, such as mixing cement & cinder, cost of overheads and contractor's profit etc. complete for finished item of work.

-

-

-

... More
20 Residential Quarters and Health Club;Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for Dummy columns using 40mm size (SS5) hard Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, machine mixing, vibrating, lifting concrete mechanically, laying concrete, curing , overheads & contractors profit, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc. including all operational, incidental and labour charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work upto un supported height up to 3.66 m for dummy columns (APSS No. 402) - Terrace Floor-

10.4

18951

197090.4

... More
20 Residential Quarters and Health Club;Residential Quarters - SILL SLABS - Stilt Floor

1

5815

5815

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

0.8

7314

5851.2

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

8

7065

56520

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

8

6815

54520

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

8

6565

52520

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

8

6315

50520

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

8

6065

48520

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

6

5815

34890

... More
20 Residential Quarters and Health Club;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

196

1483

290668

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

196

1388

272048

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

196

1294

253624

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

196

1199

235004

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

196

1104

216384

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

428

1010

432280

... More
20 Residential Quarters and Health Club;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 290mm x 100mm x 140mm having minimum compressive strength of 50 Kg/Sq.cm and placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, and cost of overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

108

12838

1386504

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

266

12235

3254510

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

268

11631

3117108

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

266

11027

2933182

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

268

10424

2793632

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

266

9820

2612120

... More
20 Residential Quarters and Health Club;Residential Quarters -Ground Floor

146

9216

1345536

... More
20 Residential Quarters and Health Club;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504).

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

60

1512

90720

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

66

1464

96624

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

60

1417

85020

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

66

1369

90354

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

60

1321

79260

... More
20 Residential Quarters and Health Club;Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

54

826

44604

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

54

806

43524

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

54

787

42498

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

54

768

41472

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

54

748

40392

... More
20 Residential Quarters and Health Club;Residential Quarters - Stilt Floor

26

729

18954

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Platforms 50 mm thick .

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

9

1555

13995

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

72

1493

107496

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

72

1431

103032

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

72

1368

98496

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

72

1306

94032

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

72

1242

89424

... More
20 Residential Quarters and Health Club;Residential Quarters -Stilt Floor

44

1181

51964

... More
20 Residential Quarters and Health Club;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903)

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - STEPS - Fifth Floor

2

9496

18992

... More
20 Residential Quarters and Health Club;Residential Quarters - STEPS - Fourth Floor

2

9372

18744

... More
20 Residential Quarters and Health Club;Residential Quarters - STEPS - Third Floor

2

9259

18518

... More
20 Residential Quarters and Health Club;Residential Quarters - STEPS - Second Floor

2

9145

18290

... More
20 Residential Quarters and Health Club;Residential Quarters - STEPS - First Floor

2

9032

18064

... More
20 Residential Quarters and Health Club;Residential Quarters - STEPS - Stilt Floor

2

8918

17836

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 175mm THICK - Fifth Floor

276

2113

583188

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 175mm THICK - Fourth Floor

254

2071

526034

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 175mm THICK - Third Floor

276

2031

560556

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 175mm THICK - Second Floor

254

1991

505714

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 175mm THICK - First Floor

276

1952

538752

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 175mm THICK - Stilt Floor

276

1912

527712

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 150mm THICK - Terrace Floor

86

1978

170108

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 150mm THICK - Fifth Floor

38

1939

73682

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 150mm THICK - Fourth Floor

38

1899

72162

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 150mm THICK - Third Floor

38

1860

70680

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 150mm THICK - Second Floor

38

1822

69236

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 150mm THICK - First Floor

38

1782

67716

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 150mm THICK - Stilt Floor

38

1744

66272

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 125mm THICK - Terrace Floor

130

1834

238420

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 125mm THICK - Fifth Floor

826

1796

1483496

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 125mm THICK - Fourth Floor

822

1755

1442610

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 125mm THICK - Third Floor

826

1717

1418242

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 125mm THICK - Second Floor

822

1679

1380138

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 125mm THICK - First Floor

826

1639

1353814

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF SLAB 125mm THICK - Stilt Floor

872

1600

1395200

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF BEAMS - Terrace Floor

10

15584

155840

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF BEAMS - Fifth Floor

64

15242

975488

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF BEAMS - Fourth Floor

64

14894

953216

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF BEAMS - Third Floor

64

14551

931264

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF BEAMS - Second Floor

64

14211

909504

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF BEAMS - First Floor

64

13868

887552

... More
20 Residential Quarters and Health Club;Residential Quarters - ROOF BEAMS - Stilt Floor

64

13526

865664

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS AND SLABS.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters Terrace Floor

0.8

20039

16031.2

... More
20 Residential Quarters and Health Club;Residential Quarters Fifth Floor

8

19154

153232

... More
20 Residential Quarters and Health Club;Residential Quarters -Fourth Floor

8

18267

146136

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

8

17382

139056

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

8

16495

131960

... More
20 Residential Quarters and Health Club;Residential Quarters - First Floor

8

15609

124872

... More
20 Residential Quarters and Health Club;Residential Quarters - Stilt Floor

6

14722

88332

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Terrace Floor

18

16859

303462

... More
20 Residential Quarters and Health Club;Residential Quarters - Fifth Floor

71.4

16451

1174601.4

... More
20 Residential Quarters and Health Club;Residential Quarters - Fourth Floor

71.4

16021

1143899.4

... More
20 Residential Quarters and Health Club;Residential Quarters - Third Floor

71.4

15614

1114839.6

... More
20 Residential Quarters and Health Club;Residential Quarters - Second Floor

71.4

15206

1085708.4

... More
20 Residential Quarters and Health Club;Residential Quarters- First Floor

71.4

14798

1056577.2

... More
20 Residential Quarters and Health Club;Residential Quarters - Ground Floor

94

14391

1352754

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, in BUILDINGS.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - 150M Thick Side Walls - First Floor

42

3917

164514

... More
20 Residential Quarters and Health Club;Residential Quarters - 150M Thick Side Walls - Ground Floor

34

3367

114478

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS, WATER TANKS, RCC WALLS in BUILDINGS.

-

-

-

... More
20 Residential Quarters and Health Club;Residential Quarters - Plinth Beams

58

12831

744198

... More
20 Residential Quarters and Health Club;Residential Quarters -Pedestals

74

9670

715580

... More
20 Residential Quarters and Health Club;Residential Quarters -FOOTING

764

8918

6813352

... More
20 Residential Quarters and Health Club;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using Batching Plant of capacity 50 cum per hour and transporting concrete to site by Transit mixer of 2cum capacity and pumping concrete; using pump and using 20mm graded machine crushed hard Granite metal (coarse aggregate) from approved quarry including adding superplasticiser of high range water reducing admixture conforming to IS 9103-1999 including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand and 50% manufactured sand), coarse aggregate, water, superplasticiser etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and overheads & contractors profit complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) for following items of work for Footings, Pedestals & Plinth Beams

-

-

-

... More
20 Residential Quarters and Health Club;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand (with 50% river sand & 50% manufactured sand), water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc., complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

28

4518

126504

... More
20 Residential Quarters and Health Club;Pre construction Anti termite is a process in which chemical toxic to sub terrain termites is apply/ inject into soil during early stage of building Construction Treatment of soil Beneath the building and around the foundations conduct and chemical use as per BIS - IS 6313 (Part -2) 2013 code specification & CIB RC registered termiticide which creates a continuous chemical barrier beneath the building which kills or repels terminates & impervious to tremite entry Imidacloprid 30.5% SC (IS 63131) dissolve 2.1 Ml/1 liter of water and apply emulsion/solution @ 7.5 Litres/Square meter (Sqm) of internal, external vertical surface of the columns , plinth beams (Back filling) walls and floor junction, external perimeters, along retaining wall @ 5.0 Liters/Sqm of the horizontal surface of basement top surface of the basement filling below flooring bed (Plinth) & @ 2.0 Litres/ Line meter at expansion joints. The substructure of a depth of 500mm around columns & 300mm deep around plinth beams, basements & floor filling area including excavation channel along the wall & rodding etc. cost & Conveyance of all materials to the site, cost of labour for spraying, rodding, cost of overheads and contractors profit, etc. complete for furnished item of work as per the approval of the Engineer-in-charge (Plinth area measurements will be taken for payment)

1180

165

194700

... More
20 Residential Quarters and Health Club;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No. 402) MACHINE MIXING

134

4392

588528

... More
20 Residential Quarters and Health Club;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)

1222

229

279838

... More
20 Residential Quarters and Health Club;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

136

4584

623424

... More
20 Residential Quarters and Health Club;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.Upto 3M Depth

1916

159

304644

... More
20 Residential Quarters and Health Club;20 Residential Quarters

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.