For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Roads And Buildings Department Tender
Civil And Construction
Road Construction
Opening Date30 Nov 2024
Closing Soon4 Dec 2024
Tender Amount₹ 3,39,254
Costs
EMD
₹ 3,400Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
559583Tender No
NITNo.EE(R&B)/SRD/PAtoEE/DB/T1/15/16/2024-2025, dt:28/11/2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
boq;Providing B.T. Patchwork for pot holes of depth ranging from 50-70mm and above using 40mm HBG metal with required quantity of 10-12mm size HBG key chips and VG-10 grade Bitumen at 42 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG chips and VG-10 grade Bitumen at 72 Kgs/1Cum., including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete on NH to Ananthasagar (via) Julkal from Km 0/0 to 6/0.
75
364
27300
boq;Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps etc., complete for finished item of work on Road from Shankarampet to Narayankhed (via) Bujrampally from Km 8/0 to 14/2
5600
4
22400
boq;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work on Road from Shankarampet to Narayankhed (via) Bujrampally from Km 8/0 to 14/2
9
1678
15102
boq;Providing B.T. Patchwork for pot holes of depth ranging from 25 to 35mm, using 20-25mm HBG metal with required quantity of 10-12mm size HBG key chips and VG-10 grade Bitumen at 72 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole, including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete for finished item of work on Road from Shankarampet to Narayankhed (via) Bujrampally from Km 8/0 to 14/2
84
224
18816
boq;Providing B.T. Patchwork for pot holes of depth ranging from 50-70mm and above using 40mm HBG metal with required quantity of 10-12mm size HBG key chips and VG-10 grade Bitumen at 42 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG chips and VG-10 grade Bitumen at 72 Kgs/1Cum., including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete on Road from Shankarampet to Narayankhed (via) Bujrampally from Km 8/0 to 14/2
32
354
11328
boq;Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil(obtained from road boundary) and compacting with appropriate equipment as per MORT&H specification No.3003 complete for finished item of work. with Side earth on Road from Shankarampet to Narayankhed (via) Bujrampally from Km 8/0 to 14/2
7500
3
22500
boq;White washing to culverts with 2 coats of best shell lime including cost and conveyance of materials , scrapping the old surface, labour charges and all operational and hire charges etc., complete for finished item of work as directed by the Engineer-In-charge on Road from Shankarampet to Narayankhed (via) Bujrampally from Km 8/0 to 14/2
283
29
8207
boq;Engaging labour for remove the debries litter vents, raingulies clearance etc., complete for finished items of work on Road from Shankarampet to Narayankhed (via) Bujrampally from Km 8/0 to 14/2
15
575
8625
boq;Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps etc., complete for finished item of work on Mudutuntal 'X' road to Chapta road from Km 0/0 to 7/2.
7000
4
28000
boq;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work on Mudutuntal 'X' road to Chapta road from Km 0/0 to 7/2.
12
1841
22092
boq;Providing B.T. Patchwork for pot holes of depth ranging from 25 to 35mm, using 20-25mm HBG metal with required quantity of 10-12mm size HBG key chips and VG-10 grade Bitumen at 72 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole, including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete for finished item of work on Mudutuntal 'X' road to Chapta road from Km 0/0 to 7/2.
79
230
18170
boq;Providing B.T. Patchwork for pot holes of depth ranging from 50-70mm and above using 40mm HBG metal with required quantity of 10-12mm size HBG key chips and VG-10 grade Bitumen at 42 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG chips and VG-10 grade Bitumen at 72 Kgs/1Cum., including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete on Mudutuntal 'X' road to Chapta road from Km 0/0 to 7/2.
69
364
25116
boq;White washing to culverts with 2 coats of best shell lime including cost and conveyance of materials , scrapping the old surface, labour charges and all operational and hire charges etc., complete for finished item of work as directed by the Engineer-In-charge on Mudutuntal 'X' road to Chapta road from Km 0/0 to 7/2.
738
29
21402
boq;Engaging labour for remove the debries litter vents, raingulies clearance etc., complete for finished items of work on Mudutuntal 'X' road to Chapta road from Km 0/0 to 7/2.
6
575
3450
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%