Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Roads And Buildings Department Tender
Civil And Construction
Opening Date9 Feb 2024
Closing Date16 Feb 2024
Tender Amount₹ 4,90,36,935
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
496240Tender No
Chief Engineer (R&B), D&P,LWE, RSW,QC& Admn NIT No.2050/155/3rd call/B22/CE (D&P, LWE, RSW, QC, Admn.&RR)/ LWE/EE/DEE/AEE2/2023-24, Dt:05.02.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Plain cement concrete M20 grade using 40, 20 & 10mm metal (HBG) mechanically mixed in foundation complete as per drawings and technical specification Clauses 802,804,805,806,807 ,1202 and 1204 MORD and 1500,1700 & 2200 MORTH, including contractor profit & overhead charges , excluding seigniorage charges and GST etc.,complete for cutoff wall and foundations
396
6761
2677356
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Plain cement concrete M20 grade using 40, 20 & 10mm metal (HBG) mechanically mixed in sub structure complete as per drawings and technical specification Clauses 802,804,805,806,807 ,1202 and 1204 MORD and 1500,1700 & 2200 MORTH, including contractor profit & overhead charges , excluding seigniorage charges and GST etc.,complete for sub structure of piers, abutments and wing walls.For Return walls -RW
197
7151
1408747
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Plain cement concrete M20 grade using 40, 20 & 10mm metal (HBG) mechanically mixed in sub structure complete as per drawings and technical specification Clauses 802,804,805,806,807 ,1202 and 1204 MORD and 1500,1700 & 2200 MORTH, including contractor profit & overhead charges , excluding seigniorage charges and GST etc.,complete for sub structure of piers, abutments and wing walls.For Return walls -RW1
115
7801
897115
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and laying Reinforced cement concrete M 30 grade(Design Mix) using 20 & 10mm metal mechanically mixed in sub structure as per drawings and technical specifications Clauses 800 ,1205.4 and 1205.5 MORD/ sections 1500, 1600 & 1700 MORTH, including contractor profit & overhead charges, excluding seigniorage charges , cost of steel etc., complete for Substructure of abutment height up to 5.00m
300.71
8765
2635723
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and laying Reinforced cement concrete M 30 grade(Design Mix) using 20 & 10mm metal mechanically mixed in sub structure as per drawings and technical specifications Clauses 800 ,1205.4 and 1205.5 MORD/ sections 1500, 1600 & 1700 MORTH, including contractor profit & overhead charges, excluding seigniorage charges , cost of steel etc., complete for Substructure of abutment height above 5.00m
89.57
9012
807205
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and laying Reinforced cement concrete M 30 grade(Design Mix) using 20 & 10mm metal mechanically mixed in sub structure as per drawings and technical specifications Clauses 800 ,1205.4 and 1205.5 MORD / sections 1500, 1600 & 1700 MORTH, including overhead charges & contractor profit , excluding seigniorage charges , cost of steel etc., complete for Bed Blocks / Backing walls
114
8765
999210
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and laying Reinforced cement concrete M 30 grade(Design Mix) using 20 & 10mm metal mechanically mixed in super structure as per drawings and technical specifications Clauses 800 ,1205.4 and 1205.5 MORD / sections 1500, 1600 & 1700 MORTH, including contractor profit & overhead charges , excluding seigniorage charges and GST upto 5m height .For super structure
368
10359
3812112
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;P.C.C M15 ordinary grade levelling course below approach slab complete as drawing and technical specifications clauses 800 and 1211 MORD & 2700 MoRTH including overhead charges & contractors profit , excluding Seigniorage charges, and GST charges., complete Under Approach slabs
8
6980
55840
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Vibrated reinforced cement concrete M 30 grade (Design Mix)using 20mm & 10mm metal mechanically mixed for approach slab as per drawing and technical specifications clauses 800 and 1211 MORD sections 1500,1600 & 1700 & 2704 MORTH including overhead charges & contractors profit , excluding Seigniorage charges, and GST charges but excluding cost of steel ., complete For Approach slabs
17
7522
127874
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and laying cement concrete wearing course M 30 (Design Mix) grade using 20 & 10mm metal mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 & 1206.3 MORD and 2702 MORTH including overhead charges & contractors profit , excluding Seigniorage charges, and GST charges but excluding cost of steel .,complete
83
8298
688734
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Vibrated reinforced cement concrete M 40 grade using 20mm & 10mm hard broken graded granite crushed metal (SS-5) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P and all water leads etc., complete as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 809,1500,1600,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for Crash barrier, excluding Reinforcement.
69
9127
629763
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Cost,Supply and fixing of Bituminous Mastic Pad 25.4mm including cost & conveyance and all labour charges and including contractors profit & overhead charges, excluding seigniorage charges and GST charges etc. complete.
68
839
57052
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Supplying, fitting, and placing HYSD bar reinforcement Fe 500 in foundation complete as per drawing and technical specifications Clauses 1000 and 1202 MORD / 1100, 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & contractors profit excluding seigniorage charges and GST charges etc. complete.
75.67
78614
5948721
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Supplying, fitting, and placing HYSD bar reinforcement Fe500 in sub structure complete as per drawing and technical specifications Clauses 1000 and 1202 MORD / 1100, 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & contractors profit excluding seigniorage charges and GST charges etc. complete.
75.39
78873
5946235
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Supplying, fitting, and placing HYSD bar reinforcement Fe500 in super structure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded including overhead charges & contractors profit and etc. complete.
76.25
80620
6147275
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD/2706 & 2200 MoRTH including contractors profit & Over head charges,excluding Seigniorage charges, GST etc., Complete .
569
379
215651
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8/ 710.1.4 of IRC:78 and 2200 MoRTH including Over head charges & contractors profit excluding Seigniorage charges and GST charges etc., Complete
202
2377
480154
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD/ 710.1.4 of IRC, 78 & 2200 MORTH, includingOver head charges & contractors profit , excluding Seigniorage charges and GST charges.,Complete
195
698
136110
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Supplying and fixing of drainage spouts complete as per drawing and Technical Specification No.2705 (As per Data communicated vide Circular Memo No. D&P/Bridge work estimates/Non SSR Items/rates/2009-1 Dt 13-08-09 of the Chief Engineer (R&B), Designs & Planning wing,) including Over head charges & contractors profit ,excluding Seigniorage charges and GST etc., complete.
24
2513
60312
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Earthwork excavation in embankment for Quadrants with carted earth with all leads and lifts complete as per MORTH specification No 305
1618.79
222
359371
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand 6 percent bitumen by weight including Over head charges & contractors profit ,excluding Seigniorage charges and GST etc., complete.
60
34
2040
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Construction of RCC guide posts of 250mm dia M20 grade cast-in-situ with 20mm nominal size agrregate (HBG) true to line and grade tolerance of vertical RCC posts not to exceed 1 in 500 as i per drawing and Technical Specification Clause 1608.2 including contractors profit &Over head charges, but excluding Seignorage& GST, but excluding Seignorage& GST
120
742
89040
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new,plastered /concrete surface as per drawing and technical specification clause 1701 MORD including contractors profit &Over head charges
256
146
37376
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 (5th revision ) and as directed by the Engineer-in-Charge for quadrential revetment.
139
2261
314279
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and laying Pitching slopes laid over prepared filter media/gravel backing as per drawing and technical specifications clause 1302 MORD/2504 MORTH including cost, and conveyance of all materials and labour charges etc.,complete including contractor profit & over head charges excluding seigniorage charges and GST etc., complete
64.8
1165
75492
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and laying of strip seal expansion joint to maximum horizontal movement upto 70mm, including cost,conveyance of all materials to site and labour charges for cutting,fixing & painting exposed surfaces of MS angles with anti corrosive paints etc., complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier
59.15
6715
397192
Bridge portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Supplying,fitting and fixing in position true to line and level elastomeric neoprene bearing confirming to IRC :83 (Part -II) ,section IX and clause 2005 of MORTH Specifications complete including all accessories as per drawing and technical specifications and MORTH Spn 2000 & 2200.Bearing size 500X360X99mm
36
5550
199800
Approach portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Approaches:Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges,excluding Seigniorage charges and GST etc., complete.
900
2
2070
Approach portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Construction of embankment with approved material obtained from borrow pits with all lifts ,transporting to site, spreading , grading to required slope and compacting with Vibratory Roller 80-100 KN to meet requirement of table 300.1 and 300-2 with lead upto 1000 m as per techincal specification clause 301.5 MORD including contractors profit & Over head charges,excluding Seigniorage charges and GST etc., complete.
8418
222
1868796
Approach portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C +Stone dust) CBR value not less than 20 and PI value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding Seigniorage charges, GST Complete .
438
3225
1412550
Approach portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Construction of shoulders by providing selected earth having minimum CBR of 10 % ,MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface , and compacted at OMC with Vibratory roller 80-100 KN to meet requirement of Table 300.2 with as per Technical Specification clause 303 MORD/305 MORTH, by using machinery including contractors profit & Over head charges,excluding Seigniorage charges and GST etc., complete.
225
304
68400
Approach portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/MORTH, including contractors profit & Over head charges ,excluding Seigniorage charges and GST etc.,Complete .
525
3983
2091075
Approach portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and applying prime coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam) ,including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .
2100
44
94290
Approach portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and applying tack coat with bitumen VG 10 Grade (Bulk) using Bitumen pressure distributor at the rate of 0.20 Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge and including contractors profit & Over head charges but excluding Seigniorage charges, GST Complete .
2100
17
35742
Approach portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and laying Bituminous Concrete with 100-120 TPH Batch Type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified Grading, premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification clause No :509 complete in all respects, including contractors profit & Over head charges excluding Seigniorage charges and GST., Complete
63
12095
761985
Approach portion at Km 5/2 to 4 on R/F Mowad to Chorpalli;Providing and laying reinforced cement concrete Hume pipes of 1000mm dia NP3 class for pipe culverts including cost and conveyance of pipes etc., complete and labour charges for laying, jointing of 1000mm dia RCC Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work.
75
4785
358875
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements