Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Road Construction
Opening Date16 Jan 2025
Closing Date27 Jan 2025
Tender Amount₹ 87,04,47,933 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
4 Lane Sripada Rao Marg;Providing and laying filter material underneath pitching in slopes complete as per drawing and Technical specifications clause 2504.

47

457

21479

... More
4 Lane Sripada Rao Marg;Providing HYSD bars ( Fe-500 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for Superstructure fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2300 (5th revision) and as per I.S.1786 of 1985including contractors profit and overheads complete for finished item of work and as directed by engineer in charge

201

85530

17191530

... More
4 Lane Sripada Rao Marg;Providing HYSD bars ( Fe-500 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for Substructure fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786 of 1985including contractors profit and overheads complete for finished item of work and as directed by engineer in charge

118

82946

9787628

... More
4 Lane Sripada Rao Marg;Providing HYSD bars ( Fe-500 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for Foundation fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2100 (5th revision) and as per I.S.1786 of 1985including contractors profit and overheads complete for finished item of work and as directed by engineer in charge

244

82566

20146104

... More
4 Lane Sripada Rao Marg;Elastomeric bearing

537600

-

382771

... More
4 Lane Sripada Rao Marg;Supplying and fixing of Drainage spouts complete as per MoRT&H specification No. 2705 (5th Revision) and as per drawing Sd/205 including cost of all materials ,transportation,contractors profit and overheads complete for finished item of work and as directed by engineer in charge

48

1428

68544

... More
4 Lane Sripada Rao Marg;Providing and fixing 20mm thick Compressible Fiber board joint filler in expansion joint and in between retaining wall and side wall complete as per drawing and Technical Specifications Section 2604 (5th Revision) including contractors profit and overheads complete for finished item of work and as directed by engineer in charge in structures

78

949

74022

... More
4 Lane Sripada Rao Marg;Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions as per technical specification 2607 for installation including contractors profit and overhead charges and as directed by the Engineer-in-Charge

175

7136

1248800

... More
4 Lane Sripada Rao Marg;Providing RCC M40 Crash Barrier (cement content 0.43 t /cum) using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., excluding reinforcement steel and including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing as per MoRT&H specification 809, 1600, 1700 (5th Revision) & IRC-6 including contractors profit and overhead charges and as directed by the Engineer-in-Charge

536

7714

4134704

... More
4 Lane Sripada Rao Marg;Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

254

833

211582

... More
4 Lane Sripada Rao Marg;Providing and Laying wearing course comprising of 40 mm Bituminous concrete of grading1i with bitumen concent 5.4 content of mix a over 25mm thick mastic asphalt with on top of deck slab including cost of tack coat complete on strcuture as per Clause 507 & 516 including contractors profit and overhead charges and as directed by the Engineer-in-Charge.

2159

1281

2765679

... More
4 Lane Sripada Rao Marg;Providing RCC M30 (cement content 0.406 t /cum)for Approach slab in structures using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing,including cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704 (5th Revision) including contractors profit and overhead charges and as directed by the Engineer-in-Charge

53

6759

358227

... More
4 Lane Sripada Rao Marg;Providing cement concrete PCC 15 M Grade(cement content 0.275 t/cum ) for structures levelling below approach slabs including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500 & 2100, 2700 (5th revision ) for foundations in culverts,lined drain,water chutes,dissipation chambers including contractors profit and overhead charges and as directed by the Engineer-in-Charge

26

6150

159900

... More
4 Lane Sripada Rao Marg;Providing RCC M 35 grade for Super structure (cement content 0.406 t ) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1700 & 2300 (5th revision) including contractors profit and overhead charges but excluding seignorages and as directed by the Engineer-in-Charge (5m to 10m)

1477

8616

12725832

... More
4 Lane Sripada Rao Marg;Providing RCC M 35 grade for Sub structure (cement content 0.422 t /cum) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1700 & 2200 (5th revision) including contractors profit and overhead charges but excluding seignorages and as directed by the Engineer-in-Charge for Abutment,Piers,Bearing pedestals - Height Upto 5m

758

7396

5606168

... More
4 Lane Sripada Rao Marg;Providing RCC M 30 grade for Sub structure (cement content 0.406 t/cum ) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1700 & 2200 (5th revision) including contractors profit and overhead charges but excluding seignorages and as directed by the Engineer-in-Charge for Retaiining walls

215

7289

1567135

... More
4 Lane Sripada Rao Marg;Providing RCC M 30 grade for Foundation (cement content 0.406 t/cum ) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1700 & 2100 (5th revision) including contractors profit and overhead charges but excluding seignorages and as directed by the Engineer-in-Charge

195

6858

1337310

... More
4 Lane Sripada Rao Marg;Providing and fabrication of MS liners for piles complete as per drawing and technical specification section 1100

75

110317

8273775

... More
4 Lane Sripada Rao Marg;Reinforced Cement concrete for reinforced concrete in pile cap M35 grade; complete as per drawing and technical specifications section 1100

1570

7117

11173690

... More
4 Lane Sripada Rao Marg;Bored cast-in-situ M35 grade piles 1200mm dia. excluding reinforcement complete as per drawing and technical specification section 1100 and removal of excavated earth with all leads and lifts

831

14596

12129276

... More
4 Lane Sripada Rao Marg;Providing cement concrete PCC 15 M Grade(cement content 0.275 t/cum ) for structures levelling including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500 & 2100 (5th revision ) for foundations in culverts,lined drain,water chutes,dissipation chambers including contractors profit and overhead charges and as directed by the Engineer-in-Charge

176

6150

1082400

... More
4 Lane Sripada Rao Marg;Backfilling behind abutment, wing wall and return wall complete as per drawing and Technical Specifications complete as per clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications including contractors profit and overhead charges and as directed by the Engineer-in-Charge

987

457

451059

... More
4 Lane Sripada Rao Marg;Providing and laying of granular materials/stone crushed aggregates satisfying the requirements laid down in Clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including Overhead charges and contractors profit for culverts as per drawing and technical specifications and as directed by the Engineer-in-charge in structures

354

3047

1078638

... More
4 Lane Sripada Rao Marg;Earthwork excavation in soils upto SDR by mechanical means for foundationsIn all types of soil by mechanical means (0.0m -3.0m) for new structure as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work, excluding seigniorage charges, as per MoRT&H specification 304 (5th Revision) including contractors profit and overhead charges and as directed by the Engineer-in-Charge

2795

143

399685

... More
4 Lane Sripada Rao Marg;MAJOR BRIDGE

-

-

-

... More
4 Lane Sripada Rao Marg;Providing and Laying in position Plain Cement Concrete of Grade M 20 in Toe walls complete as per drawings and Technical Specifications Sections 1500, 1700, 2100, 2507 and 2700.

7

5728

40096

... More
4 Lane Sripada Rao Marg;Providing and fixing 20mm thick Compressible Fiber board joint filler in expansion joint and in between retaining wall and side wall complete as per drawing and Technical Specifications Section 2604 (5th Revision) including contractors profit and overheads complete for finished item of work and as directed by engineer in chargein culverts

16

949

15184

... More
4 Lane Sripada Rao Marg;Providing weep holes in Abutments, Return walls for culverts and retaining walls with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (5th Revision).including contractors profit and overheads complete for finished item of work and as directed by engineer in charge

2774

396

1098504

... More
4 Lane Sripada Rao Marg;Providing and laying filter material underneath pitching in slopes complete as per drawing and Technical specifications clause 2504.

1

409

409

... More
4 Lane Sripada Rao Marg;Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications clause 2504.

2

2548

5096

... More
4 Lane Sripada Rao Marg;Providing HYSD bars ( Fe-500 ) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2100 (5th revision) and as per I.S.1786 of 1985 for foundation and sub-structure in culverts including Overheads and Contractor's Profit but excluding Seignorage charges.

312

74291

23178792

... More
4 Lane Sripada Rao Marg;Providing RCC M 25 Grade with cement Quantity 0.403 t/cum including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1700 & 2300 (5th revision ) including contractor's profit and overheads and excluding seignorage charges, for Super-Structure in culverts

1051

7077

7437927

... More
4 Lane Sripada Rao Marg;Providing RCC M 25 Grade with cement Quantity 0.403 t/cum including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1700 & 2200 (5th revision ) including contractor's profit and overheads and excluding seignorage charges, for Sub-structure in culverts

1507

6507

9806049

... More
4 Lane Sripada Rao Marg;Providing RCC M 25 Grade with cement Quantity 0.403 t/cum including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1700 & 2100 (5th revision ) including contractor's profit and overheads and excluding Seignorage charges, for foundations in culverts

1349

6137

8278813

... More
4 Lane Sripada Rao Marg;Providing cement concretePCC 15 M Grade with cement Quantity 0.275 t/cum for levelling courseincluding cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1700 & 2100 (5th revision ) for foundations in culverts,curtain walls, dissipation chambers ,rcc retaining walls

402

5508

2214216

... More
4 Lane Sripada Rao Marg;Providing and laying of granular materials/stone crushed aggregates satisfying the requirements laid down in Clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including Overhead charges and contractors profit for culverts as per drawing and technical specifications and as directed by the Engineer-in-charge.

1652

2729

4508308

... More
4 Lane Sripada Rao Marg;Back filling behind Abutments with gravel in culverts including cost ,conveyance of all materials to site etc., complete as per clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications including contractors profit and overheads complete for finished item of work in culverts and as directed by engineer in charge

2227

409

910843

... More
4 Lane Sripada Rao Marg;Earthwork excavation in soils upto SDR by mechanical means for foudation of culverts as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work, excluding seigniorage charges, as per MoRT&H specification 304 (5th Revision) including contractors profit and overheads complete for finished item of work and as directed by engineer in charge upto 3.00m deep.

2641

128

338048

... More
4 Lane Sripada Rao Marg;CULVERTS

-

-

-

... More
4 Lane Sripada Rao Marg;Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per SSR Data

1800

285

513000

... More
4 Lane Sripada Rao Marg;Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Shyam Steel & JSW as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

89.1

74291

6619328

... More
4 Lane Sripada Rao Marg;Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Shyam Steel & JSW as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for foundation RCC items.

87.62

73950

6479499

... More
4 Lane Sripada Rao Marg;Vibrated cement concrete M20 Grade Concrete using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub Strcture

2970

6158

18289260

... More
4 Lane Sripada Rao Marg;Vibrated cement concrete M20 Grade Concrete using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for foundation

2921

5822

17006062

... More
4 Lane Sripada Rao Marg;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for levelling course.

363

5395

1958385

... More
4 Lane Sripada Rao Marg;Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete including for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge

5445

53

292941

... More
4 Lane Sripada Rao Marg;For Retaining Wall

-

-

-

... More
4 Lane Sripada Rao Marg;Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces

12272

115

1411280

... More
4 Lane Sripada Rao Marg;Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified

4197

6909

28997073

... More
4 Lane Sripada Rao Marg;Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Shyam Steel & JSW as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for foundation RCC items.

441.2

73950

32626740

... More
4 Lane Sripada Rao Marg;Vibrated cement concrete M20 Grade Concrete using 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub Strcture

11030

6158

67922740

... More
4 Lane Sripada Rao Marg;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for levelling course.

1012

5395

5459740

... More
4 Lane Sripada Rao Marg;Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete including for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge

15187

53

817061

... More
4 Lane Sripada Rao Marg;For Side Drain

-

-

-

... More
4 Lane Sripada Rao Marg;Construction of Median and Island above road level with material brought from borrow pits, spread, sloped and compacted as per clause 407

12928

352

4550656

... More
4 Lane Sripada Rao Marg;Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces

9576

115

1101240

... More
4 Lane Sripada Rao Marg;Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,Shyam Steel & JSW as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for foundation RCC items.

116.8

73950

8637360

... More
4 Lane Sripada Rao Marg;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Sub structure

862

6507

5609034

... More
4 Lane Sripada Rao Marg;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Foundation

599

6137

3676063

... More
4 Lane Sripada Rao Marg;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for levelling course.

168

5395

906360

... More
4 Lane Sripada Rao Marg;Central Median

-

-

-

... More
4 Lane Sripada Rao Marg;Forming shoulders with borrowed useful earth from outside road boundary having MDD not less than 1.75 gm/cc by mechanical means up to SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and (excluding seigniorage) charges, complete for finished item of work as per MoRT&H specification 305

8505

407

3461535

... More
4 Lane Sripada Rao Marg;Providing 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 2 as per specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler, transporting the hot mix to work site, laying with full width Hydrostatic Sensor paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

4594

12233

56198402

... More
4 Lane Sripada Rao Marg;Providing and laying of Dense Graded Bituminous Macadam with 100-120 TPH batch type hot mix plant using HBG crushed aggregates of Grading - II as per table 500-10 of MoRT&H Specification 505 (5th revision) premixed with bitumen VG-30 grade @ 4.50% of weight of total mixture, transported to site, laid over a previously prepared surface with Hydrostatic Sensor paver to the required grade, level and alignment and rolled as per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as directed by the Engineer-in-Charge including hire and operational charges all T&P and all other contingent charges necessary including charges of all materials etc., complete and as per MoRTH specification No. 505(5th Revision)

5230

10928

57153440

... More
4 Lane Sripada Rao Marg;Providing and applying tack coat with Bitumen Emulsion with (RS-1) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.

245597

13

3266440

... More
4 Lane Sripada Rao Marg;Providing and aplying Prime coat with bitumen emulsion (Slow setting SS1) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.

140989

45

6344505

... More
4 Lane Sripada Rao Marg;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work.

38587

3306

127568622

... More
4 Lane Sripada Rao Marg;Construction of Granular sub-base by providing HBG/HBT material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

36116

3019

109034204

... More
4 Lane Sripada Rao Marg;Construction of Sub grade with approved material obtained from borrow pits with all lifts and leads transporting to site, spreading, grading to required slope and compacted, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil , spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per MoRT&H specification 305 (5th Revision) (CBR=10; PI=18%)

96634

452

43678568

... More
4 Lane Sripada Rao Marg;Construction of embankment with material obtained from borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision).

174673

452

78952196

... More
4 Lane Sripada Rao Marg;Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness by Mechanical means as per the Techinical Specification Clause 201 MoRTH 5th Revision

28.21

39698

1119881



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.