Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Civil And Construction
Bridge Construction
Opening Date25 Apr 2023
Closing Date2 May 2023
Tender Amount₹ 89,95,592 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Supplying & fixing of Drainage spouts complete as per MoRT&H specification No. 2705 and as per drawing No. SD/203 complete for finished item of work

4

1411

5644

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulders laid dry without wire crates.

138

1808

249504

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Providing weep holes in plain/ reinforced concrete abutment,wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure at 1.00 m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction staggered from the weep holes laying above and below lines as shown in drawing including cost and coveyance of the A.C. pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., but excluding seigniorage charges complete for finished item of work for weep holes as per MORT&H specification No 2706 & 2200 (5th revision)

39

457

17823

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBT metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.

54

2182

117828

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Back filling behind Abutments with selected Soil including cost ,conveyance of all materials to site etc., but excluding seigniorage charges complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work

40

359

14360

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Providing and laying filter material with selected earth underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 305, 309 & 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.

7

359

2513

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Providing rough stone revetment 300 mm thick using 300mm size rough stonevariety including cost, and conveyance of all materials to site,including labour chargesfor packing the stones for revetment etc., but excluding labour charges complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for toe walls.

8

1894

15152

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.25 cum of CC (1:4:8) including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., but excluding labour charges complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for revetment.

14

2831

39634

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Supplying, fitting, and placing uncoated HYSD bars Fe-500 of different diameters procured from primary producers like TATA,SAIL,VSP,J.S.W & Shyam as approved by Ministry of Steel, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including overlapping wastage and welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

6

91997

551982

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Supplying, fitting, and placing uncoated HYSD bars Fe-500 of different diameters procured from primary producers like TATA,SAIL,VSP,J.S.W & Shyam as approved by Ministry of Steel, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including overlapping wastage and welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for Substructure of R.C.C items.

21

89949

1888929

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Supplying, fitting, and placing uncoated HYSD bars Fe-500 of different diameters procured from primary producers like TATA,SAIL,VSP,J.S.W & Shyam as approved by Ministry of Steel, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including overlapping wastage and welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th Revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.

3

89649

268947

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Providing and laying Vibrated reinforced cement concrete M 40 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing SD/205 but excluding cost of steel and its fabrication charges as per MoRT&H specification nos 809, 1500, 1700 & 2200 -for Crash Barriers.

14

7289

102046

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Providing and laying Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing SD/205 but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck slab.

17

6343

107831

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Providing and laying Vibrated reinforced cement concrete M30 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as per MOST Drg. SD/104 and as directed by the Engineer-in-Charge for Approach slab.

29

6352

184208

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Vibrated reinforced cement concrete M 35 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-Charge for (Sub Structure)

253

6969

1763157

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Providing and laying Vibrated reinforced cement concrete M 35 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2100 (5th Revision ) and as directed by the Engineer-in-Charge for foundation

34

6525

221850

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost,seignorage and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Cut off Walls

69

5959

411171

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, _ and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Levelling course.

41

6359

260719

... More
Reconstruction of Box Bridge at Km 1/2 to 4 in place of existing causeway on Lingala to Appaipally;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete including _ charges for finished item of work as per MoRT&H specification 304 (5th Revision) and as directed by the Engineer-in-Charge. In ordinary soils upto SDR soils by Mechanical means

603

139

83817



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.