Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Road Construction
Opening Date18 Dec 2024
Closing Date31 Dec 2024
Tender Amount₹ 13,47,10,904 
Notes
Download

Costs

Summary

Widening And Strengthening Of A.duppalapally To Khaji Ramaram Via Kanakanalapally, Thanderpally

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road work;Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete including for finished item of work as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge for retaining wall

113

54

6204

... More
Road work;Providing and laying boulders apron for bed protection against scour with stone boulders weighing not less than 40kg with 300mm thick each complete as per drawing and specification. complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for slab culverts

238

1480

352240

... More
Road work;Drainage spouts complete as per drawing and technical specifications Clause 1209 MORD & 2705 MORTH for slab culverts

6

2954

17724

... More
Road work;Providing Weep holes in VCC Abutment/ Wing wall/return wall with 100mm Diameter AC pipe extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes laying above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per SSR Data for slab culverts

176

286

50336

... More
Road work;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal (excluding seigniorage) charges, and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work for slab culverts

116

1664

193024

... More
Road work;Back filling behind abutment with borrowed earth suitably compacted / rammed including cost, (excluding seigniorage) and conveyance of materials to site etc., complete as per drawing and MoRT&H ( 5th Revision) and as directed by the Engineer-in-Charge for slab culverts

101

255

25755

... More
Road work;Providing and laying filter material with Selected Earth underneath pitching in slopes including cost, _ charges and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment for slab culverts

17

255

4335

... More
Road work;Providing dry rough stone revetment 300 mm thick with HBG stone of not less than 300 mm size including cost, (excluding seigniorage) charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for Pitching of slopes for slab culverts

18

1480

26640

... More
Road work;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.20 cum of CC (1:4:8) including cost, _ charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 (5th revision ) and as directed by the Engineer-in-Charge for quadrential revetment for slab culverts

34

2330

79220

... More
Road work;Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP, JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 & 2200 (5th revision) and as per I.S.1786 of 1985 for superstructure for slab culverts

20

78093

1561860

... More
Road work;Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for substructure for slab culverts

4.7

75733

355945

... More
Road work;Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP,JSW and Shyam as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for RCC items foundation for slab culverts

14

75386

1055404

... More
Road work;Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified for slab culverts

74

3686

272764

... More
Road work;Vibrated cement concrete M 15 Grade Concrete using 40mm, 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500, 1700, 2100 (5th Revision) for leveling course for slab culverts

16

5428

86848

... More
Road work;Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for wearing coat over deck slab for slab culverts

26

6450

167700

... More
Road work;Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for approach slab for slab culverts

58

6421

372418

... More
Road work;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for superstructure for slab culverts

156

7300

1138800

... More
Road work;Vibrated Renforced cement concrete M25 Grade Concrete using 40mm, 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500, 1700, 2200 (5th Revision) for Bed Block and Backing wall for slab culverts

17

6903

117351

... More
Road work;Vibrated cement concrete M20 Grade Concrete using 40mm, 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500, 1700, 2200 (5th Revision) for sub structure/ Wing walls for slab culverts

269

6447

1734243

... More
Road work;Vibrated Renforced cement concrete M25 Grade Concrete using 40mm, 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500, 1700, 2200 (5th Revision) for Foundations - Raft for slab culverts

248

6527

1618696

... More
Road work;Vibrated cement concrete M20 Grade Concrete using 40mm, 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500, 1700, 2200 (5th Revision) for footings for slab culverts

223

6096

1359408

... More
Road work;Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for levelling course for slab culverts

47

4880

229360

... More
Road work;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge for slab culverts

924

130

120120

... More
Road work;Providing HYSD bars (Fe-500 From Primary Producers like TATA, SAIL, VSP, JSW & Shyam Steel as approved by Ministry of Steel) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Cover slab of R.C.C items for side drains

10.8

75733

817916

... More
Road work;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per SBD specification as directed by the Engineer-in-Charge for Cover Slab for side drains

180

6511

1171980

... More
Road work;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges ,centering, machine mixing, laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Substructure/ Walls for side drains

910

5646

5137860

... More
Road work;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for levelling course for side drains

270

4487

1211490

... More
Road work;Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete including for finished item of work as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge for side drains

2000

54

109800

... More
Road work;Providing, laying Reinforced cement concrete Hume pipes of 1000 mm Dia., NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work for pipe culverts

270

9250

2497500

... More
Road work;Vibrated cement concrete M20 Grade Concrete using 40mm, 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500, 1700, 2200 (5th Revision) for Sub structure for pipe culverts

366

6096

2231136

... More
Road work;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for levelling course for pipe culverts

105

4487

471135

... More
Road work;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seigniorage charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge for Pipe culverts

980

130

127400

... More
Road work;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR = 10%, PI < 18% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)

11397

334

3806598

... More
Road work;Contraction sawn joint groove (using diamond studded blades) 2 mm wide and 1/3 depth of the Cement Concrete pavement (slab). These grooves shall be cut when the concrete is greenish or with in 24hrs of laying.

23393

60

1403580

... More
Road work;Construction of Cement Concrete road by providing VCC M 40 Grade pannel of size (1.0mx1.0m) using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 & 2702 (5th Revision) and as directed by the Engineer-in-Charge for C.C Pavement.

2520

6829

17209080

... More
Road work;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500, 1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for levelling course

1090

4487

4890830

... More
Road work;Providing 40 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of Grading ? 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and Hydrated lime, transporting the hot mix to work site, laying with full width paver to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

1708

10662

18210696

... More
Road work;Providing and applying tack coat with bitumen emulsion (Rapid settting-I) (Bulk) using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge

42700

13

559370

... More
Road work;Providing and applying Prime coat with bitumen emulsion (Slow setting SS1) bulk using emulsion pressure distributor on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor for finished item of work as per MoRT&H specification 502 (5th Revision) and as directed by the Engineer - in charge.

42700

44

1887340

... More
Road work;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification 406 (5th revision) for finished item of work.

11133

2140

23824620

... More
Road work;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage charges) and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

10001

1885

18851885

... More
Road work;Construction of Embankment & Subgrade with material obtained from borrowed useful earth from outside road boundary MDD of 18 KN/Cum , CBR = 10%, PI < 18%, by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision). Note: The work of embankment and subgrade shall be carried out as per Plan & Profile and Payment will be based on levels for finished item of works

39200

380

14896000

... More
Road work;Forming embankment with excavated earth obtained from roadway excavation for Embankment by mechanical means upto SDR including pre-watering of soil, removal of top soil, excavation of soils, depositing the soils on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and complete for finished item of work as per MoRT&H specification 305 (5th revision).

12050

163

1964150

... More
Road work;Earthwork excavation in soils upto SDR by mechanical means including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete including for finished item of work for trench cutting as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge

15062

54

826904

... More
Road work;Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3

22875

10

244763

... More
Road work;Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness by Mechanical means as per the Techinical Specification Clause 201 MoRTH 5th Revision

3.44

40469

139213



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.