Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Opening Date31 Oct 2024
Closing Date14 Nov 2024
Tender Amount₹ 15,94,935 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Compound wall in R and B Guest House in Peddapalli town;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS JACKPROP , CUPLOCK & PIPE SCAFFOLDS) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

277.65

548

152152

... More
Construction of Compound wall in R and B Guest House in Peddapalli town;Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand(50% river sand & 50 % Manufacture sand), blocks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges(with MS jack prop Cuplock pipes Scaffolding), constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140)

36.87

8602

317156

... More
Construction of Compound wall in R and B Guest House in Peddapalli town;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand (with 50% river sand & 50% manufactured sand), water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc., complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

58.62

4523

265138

... More
Construction of Compound wall in R and B Guest House in Peddapalli town;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work (APSS NO.309&310) - MECHANICAL MEANS

33.97

223

7575

... More
Construction of Compound wall in R and B Guest House in Peddapalli town;Supplying, fitting and placing thermo Mechanically Treated (TMT/HYSD) (grade as per structural drawings confirming to IS 1786) manufactured with in Telangana with minimum integrated installed Production of 2Lakh MT per annum by Primary producers like AF STAR TMT/MS LIFE TMT , Radha TMT, SUGNA TMT as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

2.24

75520

169165

... More
Construction of Compound wall in R and B Guest House in Peddapalli town;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Columns upto an un-supported height of 3.66m

12.76

15113

192842

... More
Construction of Compound wall in R and B Guest House in Peddapalli town;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR PLINTH BEAMS.

6.21

14365

89207

... More
Construction of Compound wall in R and B Guest House in Peddapalli town;Supply and placing of Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTINGS

11.52

11121

128114

... More
Construction of Compound wall in R and B Guest House in Peddapalli town;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No. 402) MACHINE MIXING

3.6

4340

15624

... More
Construction of Compound wall in R and B Guest House in Peddapalli town;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

4.89

4524

22122

... More
Construction of Compound wall in R and B Guest House in Peddapalli town;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.

88.12

159

14011



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.