Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Civil And Construction
Road Construction
Opening Date16 Feb 2024
Closing Date26 Feb 2024
Tender Amount₹ 6,79,33,739 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BOQ;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadam Specification including premixing the material with water at OMC in Mechanical mix plant, haulage of mixed material to site , laying in uniform layers with sensor paver in base courses on well prepared surface and compacting with Vibratory roller and finishing to the line & levels etc. complete as per MoRT&H specification 406 (5th Revision) and as directed by the Engineer-in-Charge

527

2529

1332783

... More
BOQ;Providing and applying Prime Coat with bitumen emulsion (Medium Setting, MS-1) on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-charge.

3375

37

125550

... More
BOQ;Providing and applying Tack coat with bitumen Emulsion (Rapid Setting RS-1) @ 0.20 Kg/ Sqm using Emulsion pressure distributor on the prepared bituminous/granular surface treated with prime coat for finished item of work as per MoRT&H Specification Clause 503 (5th revision) and as directed by the Engineer-in-Charge. Before Laying BC

3375

11

39150

... More
BOQ;Providing and laying of 30 mm thick Bituminous Concrete using 100-120 TPH Batch Mix type Hot Mix Plant, paver finisher with HBG crushed aggregates of Grading-2 as per table 500-17 of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade (minimum 5.40% of weight of total mix), haulage to site, laid over a previously prepared surface and compacted as per Clauses 501.6 and 501.7 using Tandem Roller and PTR and finishing to the required grade, level and alignment etc. complete as per MoRT&H Specifications Clause 507 (5th Revision) and as directed by the Engineer-in-Charge.

101

10568

1067368

... More
BOQ;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work as per MoRT&H specification 304(5th revision) and as directed by the Engineer-in-Charge for foundation.

240

125

30000

... More
BOQ;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for base coarse For pipe culvert

20

5020

100400

... More
BOQ;Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for bodywalls .

124

6626

821624

... More
BOQ;Providing, laying Reinforced cement concrete Hume pipes of different diameter 1000mm Dia., of NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work. for Hume pipes

30

9665

289950

... More
BOQ;Filling in between body walls with selected earth including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200&2907 (5th revision) and as per Drawing and technical specifications for finished item of work

128

237

30336

... More
BOQ;Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.

1.5

39807

59711

... More
BOQ;Forming embankment, Subgrade and shoulders with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and charges, complete for finished item of work as per MoRT&H specification 305 (5th revision)

17720

251

4447720

... More
BOQ;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

2025

2281

4619025

... More
BOQ;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadam Specification including premixing the material with water at OMC in Mechanical mix plant, haulage of mixed material to site , laying in uniform layers with sensor paver in base courses on well prepared surface and compacting with Vibratory roller and finishing to the line & levels etc. complete as per MoRT&H specification 406 (5th Revision) and as directed by the Engineer-in-Charge

1463

2529

3699927

... More
BOQ;Providing and applying Prime Coat with bitumen emulsion (Medium Setting, MS-1) on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-charge.

9375

37

348750

... More
BOQ;Providing and applying Tack coat with bitumen Emulsion (Rapid Setting RS-1) @ 0.20 Kg/ Sqm using Emulsion pressure distributor on the prepared bituminous/granular surface treated with prime coat for finished item of work as per MoRT&H Specification Clause 503 (5th revision) and as directed by the Engineer-in-Charge. Before Laying BC

9375

11

108750

... More
BOQ;Providing and laying of 30 mm thick Bituminous Concrete using 100-120 TPH Batch Mix type Hot Mix Plant, paver finisher with HBG crushed aggregates of Grading-2 as per table 500-17 of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade (minimum 5.40% of weight of total mix), haulage to site, laid over a previously prepared surface and compacted as per Clauses 501.6 and 501.7 using Tandem Roller and PTR and finishing to the required grade, level and alignment etc. complete as per MoRT&H Specifications Clause 507 (5th Revision) and as directed by the Engineer-in-Charge.

281

10568

2969608

... More
BOQ;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work as per MoRT&H specification 304(5th revision) and as directed by the Engineer-in-Charge for foundation.

240

125

30000

... More
BOQ;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for base coarse For Pipe culvert

20

5023

100460

... More
BOQ;Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for bodywalls .

124

6630

822120

... More
BOQ;Providing, laying Reinforced cement concrete Hume pipes of different diameter 1000mm Dia., of NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work. for Hume pipes

30

9665

289950

... More
BOQ;Filling in between body walls with selected earth including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200&2907 (5th revision) and as per Drawing and technical specifications for finished item of work

128

237

30336

... More
BOQ;Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.

1.5

39807

59711

... More
BOQ;Forming embankment, Subgrade and shoulders with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and charges, complete for finished item of work as per MoRT&H specification 305 (5th revision)

17970

251

4510470

... More
BOQ;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

2025

2281

4619025

... More
BOQ;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadam Specification including premixing the material with water at OMC in Mechanical mix plant, haulage of mixed material to site , laying in uniform layers with sensor paver in base courses on well prepared surface and compacting with Vibratory roller and finishing to the line & levels etc. complete as per MoRT&H specification 406 (5th Revision) and as directed by the Engineer-in-Charge

1463

2529

3699927

... More
BOQ;Providing and applying Prime Coat with bitumen emulsion (Medium Setting, MS-1) on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-charge.

9375

37

348750

... More
BOQ;Providing and applying Tack coat with bitumen Emulsion (Rapid Setting RS-1) @ 0.20 Kg/ Sqm using Emulsion pressure distributor on the prepared bituminous/granular surface treated with prime coat for finished item of work as per MoRT&H Specification Clause 503 (5th revision) and as directed by the Engineer-in-Charge. Before Laying BC

9375

11

108750

... More
BOQ;Providing and laying of 30 mm thick Bituminous Concrete using 100-120 TPH Batch Mix type Hot Mix Plant, paver finisher with HBG crushed aggregates of Grading-2 as per table 500-17 of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade (minimum 5.40% of weight of total mix), haulage to site, laid over a previously prepared surface and compacted as per Clauses 501.6 and 501.7 using Tandem Roller and PTR and finishing to the required grade, level and alignment etc. complete as per MoRT&H Specifications Clause 507 (5th Revision) and as directed by the Engineer-in-Charge.

281

10568

2969608

... More
BOQ;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work as per MoRT&H specification 304(5th revision) and as directed by the Engineer-in-Charge for foundation.

240

125

30000

... More
BOQ;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for base coarse

20

5023

100460

... More
BOQ;Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for bodywalls .

124

6630

822120

... More
BOQ;Providing, laying Reinforced cement concrete Hume pipes of different diameter 1000mm Dia., of NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work. for Hume pipes

30

9665

289950

... More
BOQ;Filling in between body walls with selected earth including cost ,conveyance and of all materials to site etc., complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200&2907 (5th revision) and as per Drawing and technical specifications for finished item of work

128

237

30336

... More
BOQ;Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.

0.36

39807

14331

... More
BOQ;Forming embankment, Subgrade and shoulders with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and charges, complete for finished item of work as per MoRT&H specification 305 (5th revision)

2612

251

655612

... More
BOQ;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

972

1893

1839996

... More
BOQ;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadam Specification including premixing the material with water at OMC in Mechanical mix plant, haulage of mixed material to site , laying in uniform layers with sensor paver in base courses on well prepared surface and compacting with Vibratory roller and finishing to the line & levels etc. complete as per MoRT&H specification 406 (5th Revision) and as directed by the Engineer-in-Charge

702

2129

1494558

... More
BOQ;Providing and applying Prime Coat with bitumen emulsion (Medium Setting, MS-1) on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-charge.

4500

37

167400

... More
BOQ;Providing and applying Tack coat with bitumen Emulsion (Rapid Setting RS-1) @ 0.20 Kg/ Sqm using Emulsion pressure distributor on the prepared bituminous/granular surface treated with prime coat for finished item of work as per MoRT&H Specification Clause 503 (5th revision) and as directed by the Engineer-in-Charge. Before Laying BC

4500

11

51750

... More
BOQ;Providing and laying of 30 mm thick Bituminous Concrete using 100-120 TPH Batch Mix type Hot Mix Plant, paver finisher with HBG crushed aggregates of Grading-2 as per table 500-17 of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade (minimum 5.40% of weight of total mix), haulage to site, laid over a previously prepared surface and compacted as per Clauses 501.6 and 501.7 using Tandem Roller and PTR and finishing to the required grade, level and alignment etc. complete as per MoRT&H Specifications Clause 507 (5th Revision) and as directed by the Engineer-in-Charge.

135

10118

1365930

... More
BOQ;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work as per MoRT&H specification 304(5th revision) and as directed by the Engineer-in-Charge for foundation.

74

125

9250

... More
BOQ;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for base coarse

22

4735

104170

... More
BOQ;Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for bodywalls .

49

6330

310170

... More
BOQ;Providing, laying Reinforced cement concrete Hume pipes of different diameter 1000mm Dia., of NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work. for Hume pipes

30

9922

297660

... More
BOQ;Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.

0.6

39807

23884

... More
BOQ;Forming embankment and shoulders with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and charges, complete for finished item of work as per MoRT&H specification 305 (5th revision)

4353

251

1092603

... More
BOQ;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

1620

1938

3139560

... More
BOQ;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadam Specification including premixing the material with water at OMC in Mechanical mix plant, haulage of mixed material to site , laying in uniform layers with sensor paver in base courses on well prepared surface and compacting with Vibratory roller and finishing to the line & levels etc. complete as per MoRT&H specification 406 (5th Revision) and as directed by the Engineer-in-Charge

1170

2175

2544750

... More
BOQ;Providing and applying Prime Coat with bitumen emulsion (Medium Setting, MS-1) on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-charge.

7500

37

279000

... More
BOQ;Providing and applying Tack coat with bitumen Emulsion (Rapid Setting RS-1) @ 0.20 Kg/ Sqm using Emulsion pressure distributor on the prepared bituminous/granular surface treated with prime coat for finished item of work as per MoRT&H Specification Clause 503 (5th revision) and as directed by the Engineer-in-Charge. Before Laying BC

7500

11

86250

... More
BOQ;Providing and laying of 30 mm thick Bituminous Concrete using 100-120 TPH Batch Mix type Hot Mix Plant, paver finisher with HBG crushed aggregates of Grading-2 as per table 500-17 of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade (minimum 5.40% of weight of total mix), haulage to site, laid over a previously prepared surface and compacted as per Clauses 501.6 and 501.7 using Tandem Roller and PTR and finishing to the required grade, level and alignment etc. complete as per MoRT&H Specifications Clause 507 (5th Revision) and as directed by the Engineer-in-Charge.

225

10170

2288250

... More
BOQ;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work as per MoRT&H specification 304(5th revision) and as directed by the Engineer-in-Charge for foundation.

98

125

12250

... More
BOQ;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for base coarse For Side Drain

29

4781

138649

... More
BOQ;Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for bodywalls .

65

6378

414570

... More
BOQ;Providing, laying Reinforced cement concrete Hume pipes of different diameter 1000mm Dia., of NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work. for Hume pipes

40

9937

397480

... More
BOQ;Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.

0.6

39807

23884

... More
BOQ;Forming embankment and shoulders with borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P and charges, complete for finished item of work as per MoRT&H specification 305 (5th revision)

4353

251

1092603

... More
BOQ;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.

1620

1734

2809080

... More
BOQ;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix Macadam Specification including premixing the material with water at OMC in Mechanical mix plant, haulage of mixed material to site , laying in uniform layers with sensor paver in base courses on well prepared surface and compacting with Vibratory roller and finishing to the line & levels etc. complete as per MoRT&H specification 406 (5th Revision) and as directed by the Engineer-in-Charge

1170

1965

2299050

... More
BOQ;Providing and applying Prime Coat with bitumen emulsion (Medium Setting, MS-1) on prepared surface of Granular base including cleaning of road surface and spraying emulsion at the rate of 0.70 Kg/sqm using emulsion pressure distributor etc., complete for finished item of work as per MoRT&H Specification 502 (5th Revision) and as directed by the Engineer-in-charge.

7500

37

279000

... More
BOQ;Providing and applying Tack coat with bitumen Emulsion (Rapid Setting RS-1) @ 0.20 Kg/ Sqm using Emulsion pressure distributor on the prepared bituminous/granular surface treated with prime coat for finished item of work as per MoRT&H Specification Clause 503 (5th revision) and as directed by the Engineer-in-Charge. Before Laying BC

7500

11

86250

... More
BOQ;Providing and laying of 30 mm thick Bituminous Concrete using 100-120 TPH Batch Mix type Hot Mix Plant, paver finisher with HBG crushed aggregates of Grading-2 as per table 500-17 of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG 30 grade (minimum 5.40% of weight of total mix), haulage to site, laid over a previously prepared surface and compacted as per Clauses 501.6 and 501.7 using Tandem Roller and PTR and finishing to the required grade, level and alignment etc. complete as per MoRT&H Specifications Clause 507 (5th Revision) and as directed by the Engineer-in-Charge.

225

9933

2234925

... More
BOQ;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work as per MoRT&H specification 304(5th revision) and as directed by the Engineer-in-Charge for foundation.

98

125

12250

... More
BOQ;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for base coarse

29

4572

132588

... More
BOQ;Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, (excluding seigniorage) and conveyance of all materials to site and all labour charges , centering, machine mixing, laying in position, Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for bodywalls .

65

6161

400465

... More
BOQ;Providing, laying Reinforced cement concrete Hume pipes of different diameter 1000mm Dia., of NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (5th revision) and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of work. for Hume pipes

40

9816

392640



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.