Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Roads And Buildings Department Tender
Civil And Construction
Road Construction
Opening Date12 Jan 2024
Closing Date19 Jan 2024
Tender Amount₹ 6,10,897
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
490881Bid Award Id
ViewTender No
DB/HD/06/2023-24/05, Dt: 02.01.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
AM to R and B Atmakur Section Package I roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. on Atmakur - Jurala road from km 0/0 to 4/0
1625
2
4225
... More
AM to R and B Atmakur Section Package I roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) onAtmakur - Jurala road from km 0/0 to 4/0
10
1816
18160
... More
AM to R and B Atmakur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Atmakur - Jurala road from km 0/0 to 4/0
50
273
13650
... More
AM to R and B Atmakur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Atmakur - Jurala road from km 0/0 to 4/0
40
452
18080
... More
AM to R and B Atmakur Section Package I roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Atmakur (R&B) road - Devarkadra via Nilividi, Konnur road from km 0/0 to 11/0 (work in reach km 0/0 to 8/6).
14
545
7630
... More
AM to R and B Atmakur Section Package I roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. on Atmakur (R&B) road - Devarkadra via Nilividi, Konnur road from km 0/0 to 11/0 (work in reach km 0/0 to 8/6).
1430
2
4147
... More
AM to R and B Atmakur Section Package I roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. on Atmakur (R&B) road - Devarkadra via Nilividi, Konnur road from km 0/0 to 11/0 (work in reach km 0/0 to 8/6)
3250
2
8450
... More
AM to R and B Atmakur Section Package I roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) onAtmakur (R&B) road - Devarkadra via Nilividi, Konnur road from km 0/0 to 11/0 (work in reach km 0/0 to 8/6)
15
1652
24780
... More
AM to R and B Atmakur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Atmakur (R&B) road - Devarkadra via Nilividi, Konnur road from km 0/0 to 11/0 (work in reach km 0/0 to 8/6)
100
269
26900
... More
AM to R and B Atmakur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Atmakur (R&B) road - Devarkadra via Nilividi, Konnur road from km 0/0 to 11/0 (work in reach km 0/0 to 8/6)
100
443
44300
... More
AM to R and B Atmakur Section Package I roads;Providing and Engaging Front end loader/JCB 1 Cum capacity for removal of fallen trees, enchroachments etc., for unscattered work in emergency for complete finished item of work as per the instructions of Engineer-in-Charge. On Wanaparthy - Atmakur road from km 8/0 to 31/670 (work in reach km 8/0 to 27/0 .
20
3331
66624
... More
AM to R and B Atmakur Section Package I roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Wanaparthy - Atmakur road from km 8/0 to 31/670 (work in reach km 8/0 to 27/0 .
25
545
13625
... More
AM to R and B Atmakur Section Package I roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. on Wanaparthy - Atmakur road from km 8/0 to 31/670 (work in reach km 8/0 to 27/0 .
2600
2
7540
... More
AM to R and B Atmakur Section Package I roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. on Wanaparthy - Atmakur road from km 8/0 to 31/670 (work in reach km 8/0 to 27/0
9100
2
23660
... More
AM to R and B Atmakur Section Package I roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) onWanaparthy - Atmakur road from km 8/0 to 31/670 (work in reach km 8/0 to 27/0
25
1839
45975
... More
AM to R and B Atmakur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Wanaparthy - Atmakur road from km 8/0 to 31/670 (work in reach km 8/0 to 27/0
150
274
41100
... More
AM to R and B Atmakur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Wanaparthy - Atmakur road from km 8/0 to 31/670 (work in reach km 8/0 to 27/0
150
454
68100
... More
AM to R and B Atmakur Section Package I roads;Providing and Engaging Front end loader/JCB 1 Cum capacity for removal of fallen trees, enchroachments etc., for unscattered work in emergency for complete finished item of work as per the instructions of Engineer-in-Charge. On Amarchinta - Alipur road from km 0/0 to 6/0 .
6
3331
19987
... More
AM to R and B Atmakur Section Package I roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Amarchinta - Alipur road from km 0/0 to 6/0 .
10
545
5450
... More
AM to R and B Atmakur Section Package I roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. on Amarchinta - Alipur road from km 0/0 to 6/0 .
650
2
1885
... More
AM to R and B Atmakur Section Package I roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. on Amarchinta - Alipur road from km 0/0 to 6/0
2600
2
6760
... More
AM to R and B Atmakur Section Package I roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) onAmarchinta - Alipur road from km 0/0 to 6/0
10
1792
17920
... More
AM to R and B Atmakur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Amarchinta - Alipur road from km 0/0 to 6/0
70
273
19110
... More
AM to R and B Atmakur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Amarchinta - Alipur road from km 0/0 to 6/0
50
451
22550
... More
AM to R and B Atmakur Section Package I roads;Providing and Engaging Front end loader/JCB 1 Cum capacity for removal of fallen trees, enchroachments etc., for unscattered work in emergency for complete finished item of work as per the instructions of Engineer-in-Charge. On Devarkadra - Kothapally road from km 29/0 to 32/4 .
4
3331
13325
... More
AM to R and B Atmakur Section Package I roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Devarkadra - Kothapally road from km 29/0 to 32/4 .
10
545
5450
... More
AM to R and B Atmakur Section Package I roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. on Devarkadra - Kothapally road from km 29/0 to 32/4 .
325
2
943
... More
AM to R and B Atmakur Section Package I roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. on Devarkadra - Kothapally road from km 29/0 to 32/4
1300
2
3380
... More
AM to R and B Atmakur Section Package I roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) onDevarkadra - Kothapally road from km 29/0 to 32/4
10
1629
16290
... More
AM to R and B Atmakur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Devarkadra - Kothapally road from km 29/0 to 32/4
30
268
8040
... More
AM to R and B Atmakur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Devarkadra - Kothapally road from km 29/0 to 32/4
25
442
11050
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements