Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Civil And Construction
Road Construction
Opening Date2 Sep 2024
Closing Date5 Sep 2024
Tender Amount₹ 6,10,010 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
A.M. to R and B Pebbair Section Package roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On NH-7 Venkatapur road from km 0/0 to 10/833

13000

2

33800

... More
A.M. to R and B Pebbair Section Package roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On NH-7 Venkatapur road from km 0/0 to 10/833

5200

2

15080

... More
A.M. to R and B Pebbair Section Package roads;Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil obtained from side earth and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005) on NH-7 Venkatapur road from km 0/0 to 10/833

2000

39

79800

... More
A.M. to R and B Pebbair Section Package roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on NH-7 Venkatapur road from km 0/0 to 10/833

25

575

14375

... More
A.M. to R and B Pebbair Section Package roads;Providing and Engaging Front end loader/JCB 1 Cum capacity for removal of fallen trees, enchroachments etc., for unscattered work in emergency for complete finished item of work as per the instructions of Engineer-in-Charge.(SSR 2023-24 Page N0 39) ( for making kacha drains, high berm cutting and Jungle clearance) on NH-7 Venkatapur road from km 0/0 to 10/833

6

2028

12168

... More
A.M. to R and B Pebbair Section Package roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . on NH-7 Venkatapur road from km 0/0 to 10/833

728

29

21112

... More
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340

50

464

23200

... More
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340

50

279

13950

... More
A.M. to R and B Pebbair Section Package roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340

6

2026

12156

... More
A.M. to R and B Pebbair Section Package roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340

2080

2

5408

... More
A.M. to R and B Pebbair Section Package roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340

2080

2

6032

... More
A.M. to R and B Pebbair Section Package roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340

6

545

3270

... More
A.M. to R and B Pebbair Section Package roads;Providing and Engaging Front end loader/JCB 1 Cum capacity for removal of fallen trees, enchroachments etc., for unscattered work in emergency for complete finished item of work as per the instructions of Engineer-in-Charge.(SSR 2023-24 Page N0 39) ( for making kacha drains, high berm cutting and Jungle clearance) on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340

5

2028

10140

... More
A.M. to R and B Pebbair Section Package roads;Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil obtained from side earth and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005) on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340

400

38

15360

... More
A.M. to R and B Pebbair Section Package roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340

300

29

8700

... More
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)

15

469

7035

... More
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)

15

283

4245

... More
A.M. to R and B Pebbair Section Package roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)

5

1979

9895

... More
A.M. to R and B Pebbair Section Package roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)

1040

2

2704

... More
A.M. to R and B Pebbair Section Package roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)

1040

2

3016

... More
A.M. to R and B Pebbair Section Package roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)

6

545

3270

... More
A.M. to R and B Pebbair Section Package roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . on Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)

300

29

8700

... More
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Srirangapur Branch road from km 0/0 to 8/0

30

507

15210

... More
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Srirangapur Branch road from km 0/0 to 8/0

30

307

9210

... More
A.M. to R and B Pebbair Section Package roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Srirangapur Branch road from km 0/0 to 8/0

8

2356

18848

... More
A.M. to R and B Pebbair Section Package roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On Srirangapur Branch road from km 0/0 to 8/0

7800

2

20280

... More
A.M. to R and B Pebbair Section Package roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On Srirangapur Branch road from km 0/0 to 8/0

5200

2

15080

... More
A.M. to R and B Pebbair Section Package roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Srirangapur Branch road from km 0/0 to 8/0

10

575

5750

... More
A.M. to R and B Pebbair Section Package roads;Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil obtained from side earth and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005)on Srirangapur Branch road from km 0/0 to 8/0

1000

39

39900

... More
A.M. to R and B Pebbair Section Package roads;Providing and Engaging Front end loader/JCB 1 Cum capacity for removal of fallen trees, enchroachments etc., for unscattered work in emergency for complete finished item of work as per the instructions of Engineer-in-Charge.(SSR 2023-24 Page N0 39) ( for making kacha drains, high berm cutting and Jungle clearance) on Wanaparthy - Pebbair road from km 1/0 to 11/0

2

2028

4056

... More
A.M. to R and B Pebbair Section Package roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . on Srirangapur Branch road from km 0/0 to 8/0

600

29

17400



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.