Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Roads And Buildings Department Tender
Civil And Construction
Road Construction
Opening Date31 Jul 2024
Closing Date3 Aug 2024
Tender Amount₹ 6,10,826
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
532448Bid Award Id
ViewTender No
DB/HD/03/2024-25, Dt: 27.07.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
A.M. to R and B Ghanpur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Nagarkurnool - Gopalpet via Thudukurthy road from km 14/0 to 25/0
300
388
116400
... More
A.M. to R and B Ghanpur Section Package I roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . on Khillaghanpur - Kothamolgera road from km 18/0 to 23/5
200
29
5800
... More
A.M. to R and B Ghanpur Section Package I roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Khillaghanpur - Kothamolgera road from km 18/0 to 23/5
5
575
2875
... More
A.M. to R and B Ghanpur Section Package I roads;Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil obtained from side earth and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005) on Khillaghanpur - Kothamolgera road from km 18/0 to 23/5
800
39
31920
... More
A.M. to R and B Ghanpur Section Package I roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On Khillaghanpur - Kothamolgera road from km 18/0 to 23/5
1800
2
5220
... More
A.M. to R and B Ghanpur Section Package I roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On Khillaghanpur - Kothamolgera road from km 18/0 to 23/5
1800
2
4680
... More
A.M. to R and B Ghanpur Section Package I roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Khillaghanpur - Kothamolgera road from km 18/0 to 23/5
10
1922
19220
... More
A.M. to R and B Ghanpur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Khillaghanpur - Kothamolgera road from km 18/0 to 23/5
50
233
11650
... More
A.M. to R and B Ghanpur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Khillaghanpur - Kothamolgera road from km 18/0 to 23/5
100
370
37000
... More
A.M. to R and B Ghanpur Section Package I roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . on Jangamaipally - Gahanpur road from km 0/0 to 10/4
100
29
2900
... More
A.M. to R and B Ghanpur Section Package I roads;Providing and Engaging Front end loader/JCB 1 Cum capacity for removal of fallen trees, enchroachments etc., for unscattered work in emergency for complete finished item of work as per the instructions of Engineer-in-Charge.(SSR 2023-24 Page N0 39) ( for making kacha drains, high berm cutting and Jungle clearance) on Jangamaipally - Gahanpur road from km 0/0 to 10/4
2
2028
4056
... More
A.M. to R and B Ghanpur Section Package I roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Jangamaipally - Gahanpur road from km 0/0 to 10/4
5
575
2875
... More
A.M. to R and B Ghanpur Section Package I roads;Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil obtained from side earth and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005) on Jangamaipally - Gahanpur road from km 0/0 to 10/4
500
39
19950
... More
A.M. to R and B Ghanpur Section Package I roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On Jangamaipally - Gahanpur road from km 0/0 to 10/4
1800
2
5220
... More
A.M. to R and B Ghanpur Section Package I roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On Jangamaipally - Gahanpur road from km 0/0 to 10/4
1800
2
4680
... More
A.M. to R and B Ghanpur Section Package I roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Jangamaipally - Gahanpur road from km 0/0 to 10/4
20
2343
46860
... More
A.M. to R and B Ghanpur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Jangamaipally - Gahanpur road from km 0/0 to 10/4
150
244
36600
... More
A.M. to R and B Ghanpur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Jangamaipally - Gahanpur road from km 0/0 to 10/4
300
393
117900
... More
A.M. to R and B Ghanpur Section Package I roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . on Balijapally branch road from km 0/0 to 4/2
100
29
2900
... More
A.M. to R and B Ghanpur Section Package I roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Balijapally branch road from km 0/0 to 4/2
3
575
1725
... More
A.M. to R and B Ghanpur Section Package I roads;Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil obtained from side earth and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005) on Balijapally branch road from km 0/0 to 4/2
500
39
19950
... More
A.M. to R and B Ghanpur Section Package I roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On Balijapally branch road from km 0/0 to 4/2
1800
2
5220
... More
A.M. to R and B Ghanpur Section Package I roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On Balijapally branch road from km 0/0 to 4/2
1800
2
4680
... More
A.M. to R and B Ghanpur Section Package I roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Balijapally branch road from km 0/0 to 4/2
5
2204
11020
... More
A.M. to R and B Ghanpur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. onBalijapally branch road from km 0/0 to 4/2
10
240
2400
... More
A.M. to R and B Ghanpur Section Package I roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Balijapally branch road from km 0/0 to 4/2
20
385
7700
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements