Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Civil And Construction
Building Construction
Opening Date3 Jul 2024
Closing Date11 Jul 2024
Tender Amount₹ 6,38,898 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building Work;Providing and Fixing factory made polyvinylchloride (PVC) Door Frame of the size 50X47mm with a wall thickness of 5mm made out of extruded 10mm rigid PVC foam sheet,mitre cut at two corners and joined with 2 nos of 150mm long brackets of 15X15mm M.S.Square tube.The two vertical door profiles are to be reinforced with 19X19mm M.S Square tube of 19 gauges.The door frame shall be fixed to the wall using 65/100mm long M.S Screws through he frame by using PVC fasteners.A minimum of 4nos of screws to be provided for each vertical member & minimum 2 nos for horizontal member etc

3

4469

13407

... More
Building Work;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling watering and tamping, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractors profit, etc. complete for finished item of work

15

814

12210

... More
Building Work;Providing 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm of ISI marked including cost of necessary PVC Bends, shoes, PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials to site, operational & incidental charges, all labour charges for fixing at site etc., and Overheads & Contractors profit complete for finished item of work. (APSS No. 1328)

15

404

6060

... More
Building Work;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and excluding primer in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 2 Coats. GF

119.02

268

31897

... More
Building Work;Painting to New iron works with 2 coats of ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit of approved brand and shade to give an even shade after thoroughly cleaning and sand papering the surface to remove all dirt and remains , including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. including cost of overheads & contractors profit for finished item of work for:-Painting to Iron work - Synthetic enamel paint to New Iron Work - 2 coats

21.58

125

2698

... More
Building Work;Providing Mild Steel, Structural Steel, I.e., Angles, Channels, MS Plates and I sections of different sizes, cutting and fabricating to required sizes and shapes, placing in position as per approved designs and drawings, including cost and conveyance of all Mild steel sections and all wastages such as overlaps, couplings, welded joints, etc., and all operational, incidental charges, Including Labour charges for fabricating all heavy steel works like Trusses,Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc and Labour charges for fixing Trusses, Stanchions, Heavy Beams and Girders erecting and fixing in position by using chain pulley blocks, Derek pole arrangements and cranes etc., including overheads and contractor's profit complete for finished item of work.

134.05

156

20912

... More
Building Work;Supply and fixing of roofing with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove, including cost and conveyance of all materials, all operational, incidental labour charges, overheads and contractor's profit complete for finished item of work.

17.66

931

16441

... More
Building Work;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

0.1

84289

8429

... More
Building Work;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR Columns

0.39

14300

5577

... More
Building Work;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTINGS,

0.6

10790

6474

... More
Building Work;Flooring with Chequered Cement Concrete heavy duty tiles conforming to IS: 13801 using aggregates, cement, pigments of size 300 x 300 mm and thickness 20 mm of any shades set over base coat of cement mortar (1:6) 12 mm thick over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade, cost of all materials like cement, sand (with 50% river sand & 50% manufactured sand) water and tiles etc., overheads and contractors profit, complete for finished item of work.

52.95

874

46278

... More
Building Work;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).

21.47

510

10950

... More
Building Work;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental chargeson materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges,curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) ,

148.48

510

75725

... More
Building Work;Masonry work in CM(1:6) prop (Cement : Screened sand) with fly ash cement / lime solid blocks of size 290mm x 225mm x 140mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) , constructing masonry, lift charges, curing, cost of overheads and contractors profit etc., complete for finished item of work. (APSS No. 501 & 504).

12.44

8065

100329

... More
Building Work;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

7.31

4499

32888

... More
Building Work;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.

6.29

461

2900



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.