Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Civil And Construction
Building Construction
Opening Date27 Jan 2025
Closing Soon4 Feb 2025
Tender Amount₹ 16,13,038 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of New Sub Centre Building;Supply of -------Module box Makes : Similar to Switches

2

130

260

... More
Construction of New Sub Centre Building;Supply and fixing of 12 Way SPN DB Horizontal/tier type with IP 43 Protection as per IS:13032 and suitable for 12 Nos S.P. out goings and for 1 No 3 pole Incommer with 1 No 40A TP MCB and 12 Nos 6-32 A 10kA SP MCBs of including internal connections, etc., complete.

1

5193

5193

... More
Construction of New Sub Centre Building;Supply and Run of 2 of 36/0.3mm (2.50 Sq.mm) FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing pipe for run of mains inlcuding all labour charges etc., complete.Cable Makes : Finolex / RR kabel / Havells / Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR) / GM(HFFR) / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./ DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) / Southking (HFFR) / Fortune Arrt (HFFR)

60

99

5940

... More
Construction of New Sub Centre Building;Supply and fixing of Modular type Stepped electronic regulator for sweep AC ceiling fans of 900mm / 1200mm / 1400mm. Makes : Legrand Lyncus / GM Four Five / Million / Goldmedal Curve / Anchor Roma Plus / Crabtree Verona / Panasonic Vision / Hager Insista / Benlo Vesta / Polycab Levana / Salzar Elite / Elleys E-Soft / Fybros Four-X

6

561

3366

... More
Construction of New Sub Centre Building;Supply, Transportation and Fixing of 48" (1200mm) Sweep ISI mark Ceiling Fan as per IS 374 - 1979 1 Star rated Ceiling Fan with double ball bearings but without regulator including all standard accessories and all labour charges etc., complete. Makes : Crompton / Havells / Orient

6

2144

12864

... More
Construction of New Sub Centre Building;Supply and transportation of 20W +/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with PC body, wide operating voltage with Single / double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver andfrosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya/ Keselec/ FIEM / Arraystorm / GM / Goldmedal LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

16

461

7376

... More
Construction of New Sub Centre Building;Supply and fixing of ISI mark 16A3pin 6A 3pin 1way modular combi socket 16A modular switch ,on 3 Modular box with suitable cover frame and earth connections including cost and conveyance of all material and all labour charges etc., complete .

4

875

3500

... More
Construction of New Sub Centre Building;Supply and fixing of 6A/10A ISI Mark 3/2 pin Modular socket with 6A/10A 1way Modular switch, 3 Module box with cover frame on a Common switch board including cost and conveyance of all materials and all labour charges etc., complete.

13

395

5135

... More
Construction of New Sub Centre Building;Wiring with run of 3 of 22/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Concealed pipe wiring including cost and conveyance of all material and all labour charges etc., complete for fan and exhaust fan points

6

768

4608

... More
Construction of New Sub Centre Building;Wiring with run of 2 of 22/0.3mm (1.0 Sqmm) FRLS / HFFR PVC insulated flexible ISI mark copper cable in existing PVC conduit pipe including Supply and fixing of Jumbo Ceiling rose and 6A/10A ISI Mark 1way Modular switch with required modular box and cover frame in existing Concealed pipe wiring including cost and conveyance of all material and all labour charges etc along with ferrules., complete for light and bell points.Cable Makes : Finolex / RR kabel / Havells / Beljin(HFFR)/Ollivin(HFFR) / Finecab (HFFR) / GM(HFFR) / Gold Medal(HFFR) /Million(HFFR) / KEI (HFFR) / Polycab (HFFR) / V-Guard (HFFR)./ DEC(HFFR) / Bonton (HFFR) and Avocab (HFFR) / Southking (HFFR) / Fortune Arrt (HFFR) Makes : Legrand Lyncus / GM Four Five / Million / Goldmedal Curve / Anchor Roma Plus / Crabtree Verona / Panasonic Vision / Hager Insista / Benlo Vesta / Polycab Levana / Salzar Elite / Elleys E-Soft / Fybros Four-X

18

623

11214

... More
Construction of New Sub Centre Building;Supply and laying of ISI 20 mm outer dia medium (1.80mm thickness) grade with IS:9537 part 3 rigid PVC pipe with PVC junction boxes and all required accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size Modular deep box including all labour charges etc., complete.(Makes : Sudhakar / GM / Modi / AKG / VIP)

104

67

6968

... More
Construction of New Sub Centre Building;Supplying & fixing stainless steel sink size 20" x18" x 8 " (508x457.2x203.2mm) 1 mm thick with accessories, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overhead & contractor's profit etc. complete for finished item of work in all floors as directed by Engineer-in-charge.

1

5077

5077

... More
Construction of New Sub Centre Building;Supplying & fixing of 4" (101.6) multi floor trap with out Jalli- UPVC/SWR Pipe fittings, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads & contractors profit etc. complete for finished item of work.

4

749

2996

... More
Construction of New Sub Centre Building;Supplying & fixing of 4" (101.6) multi floor trap with out Jalli- UPVC/SWR Pipe fittings, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads & contractors profit etc. complete for finished item of work.

2

134

268

... More
Construction of New Sub Centre Building;Supplying & fixing of 3" (75 mm nominal size ) Nahany Trap with Jali - UPVC/SWR Pipe fittings, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc. complete for finished item of work

2

122

244

... More
Construction of New Sub Centre Building;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded conenction conforming to IS 8931, including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads and contractor's profit, etc. complete for finished item of work.

4

275

1100

... More
Construction of New Sub Centre Building;S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 15.90mm OD Pipe

9

155

1395

... More
Construction of New Sub Centre Building;S&F premium make CPVC Pipes - SDR13.5, including the cost of pipe & its fittings & labour charges complete including cost and conveyance of all materials to site, all operational, incidental, labour charges, cost of overheads & contractor profit etc.complete for finished item of work as directed by Engineer-in-charge 28.60mm OD Pipe

21

235

4935

... More
Construction of New Sub Centre Building;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions etc., as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326). 110 mm dia.

27

448

12096

... More
Construction of New Sub Centre Building;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions etc., as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326). 75 mm dia.

27

298

8046

... More
Construction of New Sub Centre Building;Supply ,Transportation and laying of NP3 Hume Pipe Type Septic Tank including all labour charges and Transportation charges for finished item of work as per directions of Engineer in Charge 1000 mm dia.

1

14800

14800

... More
Construction of New Sub Centre Building;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks, including cost and conveyance of all materials to site, all operational,incidental , labour charges, overheads and contractor's profit etc. complete for finished item of work.

500

10

5000

... More
Construction of New Sub Centre Building;Supplying & Fixing Orissa Pan White glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap : 580 mm x 440 mm duly providing constructing Brick masonry seat using 2nd class bricks, CC Squatting plate in P.C.C 1:2:4, S&F PVC Low level system with internal components & short bend: 10 Litres capacity Single Flush, S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 and S&F 15 mm nominal size PVC connection with brass union nut C.P coated including cost and conveyance of all materials , operational, incidental, labour charges, overheads and contractor's profit etc.,. complete as per standard practice for finished item of work.

2

5242

10484

... More
Construction of New Sub Centre Building;Providing Kitchen Platfrom with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black set over a base coat of CM (1:8) prop. 20mm thick, including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of granite to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, granite, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying granite to required slope as directed by the Engineer- in-charge, cost of overheads & contractors profit etc., complete for finished item of work (APSS No.701 & 707)

2.3

3579

8232

... More
Construction of New Sub Centre Building;Supply and fixing of pre cast RCC Racks (1:1:2) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 6mm HBG chips, cement and sand for cupboard racks and platforms as per the approved design including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, cost of centering charges and shuttering machine mixing, laying concrete in position, curing etc., overheads & contractors profit, lift charges for finished item of work. (APSS No. 402) (Fine aggregate with 50% river sand & 50% Manufactured sand)

3.6

855

3078

... More
Construction of New Sub Centre Building;Dadooing to walls with digital / polished glazed full body porcelain highlighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of C.M (1:5) proportion, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, coloured cement, overheads & contractors profit etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.

12.3

1244

15301

... More
Construction of New Sub Centre Building;Flooring with Non-skid red or white full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of overheads and contractor profit for finished item of work. (APSS No.707 & 701)

6.7

775

5198

... More
Construction of New Sub Centre Building;Painting to flush shutters two coats of ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit over wood primer coat including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper for neat finish etc., complete and including cost of overheads & contractors profit (APSS No.1200, 1207 & 1211) in all floors.

17.9

170

3043

... More
Construction of New Sub Centre Building;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) casement windows open able shutters duly manufactured using UPVC reinforced profiles of (48mm x 60mm) (58mm x60mm) x 2.0 mm for outer frames, (64mm x 60mm) (72mm x 60mm) x2.0 mm for mullion section for two or more open able shutters and (78mm x 60mm)/(72mm x 42mm)x2.0 mm for outward open able shutter frame or (70mm x 60mm)/(72mm x 42mm) x 2.0 mm for inward open able shutter frame capable of mounting single glazing system structurlly rinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2mm perfabricated and welded through fusion welding the window sash shallbe fitted with 5mm thick clear float glass of reputed make duly fixed with TPV Gaskets/EPDM weathering seal resistant accessories for casement window friction stay hinges of stainless steel grade 304-2 Nos per sash handle with mazk alloy casting 1No per sush locking systen suitable concealed 1No per sash provided with raiser wedges for smooth operation and the system is to be installed at the site using anchor fastenmers, silicon rubber sealant easy glazing at site etc., including cost and conveyance of all materials accessories labour charges for transportation erection at site with templaters for casement sizing complete for finished item of work.

8.5

6275

53338

... More
Construction of New Sub Centre Building;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made from M.S. tubes of 19-gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in-charge, manufacturer?s specification & drawing for finished item of work

3.2

2292

7334

... More
Construction of New Sub Centre Building;Supply and fixing of 30 mm thick Flush Door shutter solid bond wood block board type with commercial ply on both faces with 1no. 250 mm long Aldrop, 2 nos. 125 mm lond door handle, 1 no. 150 mm long tower bolt, 1 no. 250 mm long door latch and 3 Butt Hinges including c/c of all materials and labour chrges etc., complete

9

2780

25020

... More
Construction of New Sub Centre Building;Providing and fixing factory-made solid Wood Polymer Composite (WPC) single extruded Door Frame section of 100*65 MM with encapsulation of 6 MM rigid layer on all external surfaces. The door frame will have a rebate of 32MM/ 37 MM. The two Vertical members are to be joined together with the horizontal member using 8x75 MM long MS Star full thread screws to be used with reverse forward speed control hand drilling machine. The ready/assembled door frame is fixed to wall using Z Hand fast 300 MM long hold fast.

27.6

777

21445

... More
Construction of New Sub Centre Building;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Interior Grade- 1 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for Internal walls - Plastic emulsion paint - 2 Coats + 1 coat primer.

320.2

123

39385

... More
Construction of New Sub Centre Building;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ litre of approved brand and shade over a base coat of approved water based Cement Primer of Exterior Grade- 2 making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete and cost of overheads & contractors profit for finished item of work as per SS 912 for external walls for:-External Colouring - Plastic emulsion paint - 3 Coats.

99.8

219

21856

... More
Construction of New Sub Centre Building;Skirting with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs for internal wall to 10 cm height with length equal to flooring stones and matching the flooring joint lines and set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work.(APSS No.701 &707) The skirting should flush online with plastering.

10.1

918

9272

... More
Construction of New Sub Centre Building;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15)of any colour and finish in all shades and designs set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste mixed with pigment of matching shade to match the shade of tiles to full depth including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water, tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No.701 & 707)

80.8

926

74821

... More
Construction of New Sub Centre Building;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop. using screened sand 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), water proofing compound, water etc., to site, all operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903).

109.9

452

49675

... More
Construction of New Sub Centre Building;Ornamental ceiling plastering 12mm thick using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8 mm thick in CM(1:5) and top coat of 4mm thick in CM(1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .(SS 901,903 & 904)

80.8

429

34663

... More
Construction of New Sub Centre Building;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS Jack Prop Cup lock Pipe Scaffolds) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

339.2

409

138733

... More
Construction of New Sub Centre Building;Reinforced Solid Fly-ash Block Masonry for partition walls (100 mm thick) for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 100 x 140 mm for manufacturing of flyash solid blocks from approved source having minimum crushing strength of 5 N/sq.mm. and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls wherever applicable including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding cost of seigniorage charges on all materials, but including cost of scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds) and all operational, incidental , labour charges like mixing cement mortar, lift charges, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 509 & 501)

69.8

759

52978

... More
Construction of New Sub Centre Building;Solid Fly-ash Block masonry 225 mm thick for panel walls in super structure, parapet walls with cement mortar (1:6) prop (Cement:sand) using solid fly-ash blocks of size 290 x 225 x 140 mm from approved source having minimum crushing strength of 5 N/sq.mm. including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), bricks, water etc., to site, excluding seigniorage on all materials but including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges (with MS Jack Prop Cup lock Pipe Scaffolds, constructing masonry, lift charges, curing overheads & contractors profit etc., complete for finished item of work as per SS 504. for:-Fly Ash Block Masonry in CM 1:6 (290x225x140)

22.5

6974

156915

... More
Construction of New Sub Centre Building;Supplying, fitting and placing thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade as per IS 1786-1979 manufactured by Primary producers like TATA,SAIL,VSP, Jindal as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of overheads & contractors profit etc., complete for finished item of work ( APSS No.126)

2.89

64098

185243

... More
Construction of New Sub Centre Building;Plain Cement Concrete corresponding to M-20 grade as per IS 456 nominal mix using 20mm size graded aggregate machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, all operational, incidental and labour charges such as mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete including HIRE CHARGES FOR CENTERING & SCAFFOLDING (using etc., but excluding cost of steel and its fabrication charges for finished item of work, for:-Machine Mix-PCC : M-20 NOMINAL MIX Centering with Steel up to 3.66M. FOR STEPS.

1.8

6202

11164

... More
Construction of New Sub Centre Building;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand) (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, centering using Cuplock scaffolding system using MS Plate shutter all charges for mixing, laying concrete in position, curing & lift charges and cost of overheads & contractors profit etc., complete for Bed Blocks for finished item of work. (APSS No. 402): HAND MIXING

0.8

4769

3815

... More
Construction of New Sub Centre Building;Supply and placing of the Design Mix Concrete M 20 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate) ( consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., for 60 cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting concrete, laying concrete, curing, cost of overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work for sunshades (APSS No. 402, 403 & 903) & 903)

12.8

1161

14861

... More
Construction of New Sub Centre Building;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Cuplock scaffolding system using MS Plate shutteretc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR SLABS.

109.9

1479

162542

... More
Construction of New Sub Centre Building;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Cuplock scaffolding system using MS Plate shutter, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR BEAMS.

4.3

12458

53569

... More
Construction of New Sub Centre Building;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR LINTELS

0.6

12868

7721

... More
Construction of New Sub Centre Building;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Cuplock scaffolding system using MS Plate shutteretc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR COLUMNS.

5.3

12066

63950

... More
Construction of New Sub Centre Building;Supply and placing of Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 350 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR PLINTH BEAMS.

4.8

11602

55690

... More
Construction of New Sub Centre Building;Supply and placing of Design Mix Concrete M25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard Granite metal (coarse aggregate)(consisting of nominal size metal 60% of 20mm , 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm ) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) (with 50% river sand & 50% manufactured sand) coarse aggregate, water etc., to site, centering using Cuplock scaffolding system using MS Plate shutter, etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing and cost of overheads & contractors profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) FOR FOOTINGS.

5.4

8985

48519

... More
Construction of New Sub Centre Building;Filling with carted gravel by mechanical means in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310).

42

471

19782

... More
Construction of New Sub Centre Building;Filling with useful available excavated earth (excluding rock) by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P and cost of overheads & contractors profit etc., complete for finished item of work for (APSS NO.309&310)

70.9

170

12053

... More
Construction of New Sub Centre Building;Random Rubble stone masonry in CM (1:6) prop: (Cement: Screened sand) using hard Granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand (with 50% river sand & 50% manufactured sand), water, stones etc., to site, labour for cutting stones to required size and shape, mixing of cement mortar, construction, curing and cost of overheads & contractors profit etc.,complete for finished item of work in foundation and basement. (APSS No. 601 & 615).

17.7

3728

65986

... More
Construction of New Sub Centre Building;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed Granite metal from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for mixing, laying concrete in foundations , ramming, finishing top surface to the required level, curing including cost of overheads & contractors profit etc., complete for finished item of work. (APSS No. 402) MACHINE MIXING

6.4

3579

22906

... More
Construction of New Sub Centre Building;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, all charges for machine mixing, laying concrete in foundations and under flooring bed, finishing top surface to the required level curing etc., and overheads & contractors profit complete for finished item of work. (APSS No. 402) MACHINE MIXING

5.2

3741

19453

... More
Construction of New Sub Centre Building;Earth work excavation for (Sumps, Tanks and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means

28.7

74

2124

... More
Construction of New Sub Centre Building;Earth work excavation for BUILDING foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work excluding dewatering charges as per SS 20B (APSS 308) in Ordinary Soil-Mechanical Means.

42.2

130

5486



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.