Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
504287Tender No
e NIT No 70/2/SRD/DCE(R)/EE R/DEE-2/AEE/2023, Date.24.02.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
boq;Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete for finished item of work as per MoRT&H specification 304(5th revision) and as directed by the Engineer-in-Charge for foundation,for Drain work.
10800
53
573480
... More
boq;Construction of earthen shoulders with selective soils obtained from barrowed earth with an extra lead of kms. with MDD of 17.5Kn/Cum from approved sources, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P and charges, complete for finished item of work as per MoRT&H specification 305(5th revision) ,for Road work.
7740
251
1942740
... More
boq;Providing 30 mm thick compacted Bituminous Concrete with 100-120 TPH Batch mix plant using HBG crushed aggregates of size 9.5mm and below Grading ? 3 as per specification 507 of MoRT&H (5th revision), premixed with VG-30 grade @ 5.4% of mix and Hydrated lime@2%, transporting the hot mix to work site, laying with Hydrostatic sensor paver 100 TPH to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work,,for Road work.
1935
10128
19597680
... More
boq;Providing and laying Dense graded bituminous macadam with 100-120 TPH batch type HMP using HBG crushed aggregates of Grading-II as per table 500-10 of MoRT&H Specification 505 (5th revision) premixed with bituminous binder of VG-30 grade @ 4.5% of weight of total mixture, transporting the hot mix to work site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment, rolled as per Clauses 501.6 and 501.7 to achive the desired compaction for finished item of work as directed by the Engineer-In-Charge including hire and operational charges all T&P and all other contingent charges necessary excluding cost of seiniorage charges of all materials etc., completes and as per MoRT&H specification No.505 (5th revision) (Excluding Taxes charges),for Road work.
1935
9071
17552385
... More
boq;Providing and applying tack coat with Emulsion RS-1(Bulk) using Emulsion pressure distributor at the rate of 0.2Kgs per sqm on the prepared bituminous/granular surface cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.,for Road work.
103200
11
1207440
... More
boq;Providing and applying prime coat with Bitumen Emulsion (Slow Setting-1) on the prepared surface of granular base including clearing of road surface and sparaying primer at the rate of 0.70kg/sqm using mechanical means for finished item of work as per MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-Charge.,for Road work.
38700
39
1544130
... More
boq;Providing, Laying, Spreading and compacting graded HBG/HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. ,for Road work.
9890
2129
21055810
... More
boq;Construction of Granular sub-base by providing HBG material confirming to Grading - VI of MoRT&H Table 400-1 including cost, (excluding seigniorage) charges and conveyance of all materials to work site and spreading in uniform layers with motor grader or by approved means, on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., complete for finished item of work as per MoRT&H Specification.401 (5th revision) and as directed by the Engineer-in-charge. (Payment will be made based on levels for finished item of work ).,for Road work.
8084
1893
15303012
... More
boq;Construction of subgrade with material obtained from borrowed useful earth from outside road boundary MDD of 18 KN/Cum , CBR = 12%, PI < 12%, by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision).( Note:The Work of Subgrade shall be carried out as per plan and profile and payment shall be made based on approved plan and profile by the levels),for Road work.
23650
297
7024050
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements