Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Roads And Buildings Department Tender
Civil And Construction
Road Construction
Opening Date31 Jul 2024
Closing Date3 Aug 2024
Tender Amount₹ 6,10,010
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
532451Tender No
DB/HD/03/2024-25, Dt: 27.07.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
A.M. to R and B Pebbair Section Package roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Srirangapur Branch road from km 0/0 to 8/0
10
575
5750
A.M. to R and B Pebbair Section Package roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On Srirangapur Branch road from km 0/0 to 8/0
5200
2
15080
A.M. to R and B Pebbair Section Package roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On Srirangapur Branch road from km 0/0 to 8/0
7800
2
20280
A.M. to R and B Pebbair Section Package roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Srirangapur Branch road from km 0/0 to 8/0
8
2356
18848
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Srirangapur Branch road from km 0/0 to 8/0
30
307
9210
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Srirangapur Branch road from km 0/0 to 8/0
30
507
15210
A.M. to R and B Pebbair Section Package roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . on Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)
300
29
8700
A.M. to R and B Pebbair Section Package roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)
6
545
3270
A.M. to R and B Pebbair Section Package roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)
1040
2
3016
A.M. to R and B Pebbair Section Package roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)
1040
2
2704
A.M. to R and B Pebbair Section Package roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)
5
1979
9895
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)
15
283
4245
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Hyd - Bengalore road Old NH7 (Kothakota town portion) from km 131/605 to 135/328 (work in km 135/0 to 135/328)
15
469
7035
A.M. to R and B Pebbair Section Package roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340
300
29
8700
A.M. to R and B Pebbair Section Package roads;Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil obtained from side earth and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005) on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340
400
38
15360
A.M. to R and B Pebbair Section Package roads;Providing and Engaging Front end loader/JCB 1 Cum capacity for removal of fallen trees, enchroachments etc., for unscattered work in emergency for complete finished item of work as per the instructions of Engineer-in-Charge.(SSR 2023-24 Page N0 39) ( for making kacha drains, high berm cutting and Jungle clearance) on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340
5
2028
10140
A.M. to R and B Pebbair Section Package roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340
6
545
3270
A.M. to R and B Pebbair Section Package roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340
2080
2
6032
A.M. to R and B Pebbair Section Package roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340
2080
2
5408
A.M. to R and B Pebbair Section Package roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340
6
2026
12156
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340
50
279
13950
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on Hyd - Bengalore road Old NH7 (Pebbair town portion) road from km 152/275 to 156/340
50
464
23200
A.M. to R and B Pebbair Section Package roads;White washing two coats with paint grade white lime to basement to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of alll materials to site , labour charges and incidental charges such as scaffolding , lift charges etc., complete and cost of overheads & contractors profit complete for finished item of work . on NH-7 Venkatapur road from km 0/0 to 10/833
728
29
21112
A.M. to R and B Pebbair Section Package roads;Providing and Engaging Front end loader/JCB 1 Cum capacity for removal of fallen trees, enchroachments etc., for unscattered work in emergency for complete finished item of work as per the instructions of Engineer-in-Charge.(SSR 2023-24 Page N0 39) ( for making kacha drains, high berm cutting and Jungle clearance) on NH-7 Venkatapur road from km 0/0 to 10/833
6
2028
12168
A.M. to R and B Pebbair Section Package roads;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge. on NH-7 Venkatapur road from km 0/0 to 10/833
25
575
14375
A.M. to R and B Pebbair Section Package roads;Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil obtained from side earth and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005) on NH-7 Venkatapur road from km 0/0 to 10/833
2000
39
79800
A.M. to R and B Pebbair Section Package roads;Clearing of heavy Jungle including all labour charges etc., complete for finished item of work. On NH-7 Venkatapur road from km 0/0 to 10/833
5200
2
15080
A.M. to R and B Pebbair Section Package roads;Clearing of light Jungle including all labour charges etc., complete for finished item of work. On NH-7 Venkatapur road from km 0/0 to 10/833
13000
2
33800
A.M. to R and B Pebbair Section Package roads;Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadam specification including cost, (excluding seigniorage) of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with Mechanical paver in base courses on well prepared surface and compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on levels for finished item of work) on NH-7 Venkatapur road from km 0/0 to 10/833
30
2322
69660
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on NH-7 Venkatapur road from km 0/0 to 10/833
100
307
30700
A.M. to R and B Pebbair Section Package roads;Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all operations etc., complete. on NH-7 Venkatapur road from km 0/0 to 10/833
100
505
50500
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements