Roads And Buildings Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Roads And Buildings Department Tender

Works
Civil And Construction
Drainage Work
Pipe Line Project
Opening Date19 Oct 2024
Closing Date23 Oct 2024
Tender Amount₹ 8,22,576 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Others;Plastering 12mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, all operational, incidental charges on materials, cost of all labour charges for mixing mortar, finishing, scaffolding (with MS CUPLOCK SCAFFOLD SYSTEM USING MS STEEL PLATE SHUTTERS) , lift charges, curing, cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

25

510

12762.25

... More
Others;Supplying and laying, jointing and testing SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in cm (1½:1) prop, including excavation of trenches and socket pits in any soils (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling watering and tamping etc complete for finished item of work. ( 101.4 mm (4") dia ).

18.43

513

9454.59

... More
Others;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) under foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, all charges for laying concrete under foundations and under flooring bed, finishing top surface to the required level curing etc.,complete for finished item of work. (APSS No. 402): HAND MIXING

5

4285

21425

... More
Others;S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge TBSC.J-1V-09 P- No.263. of Sor 23-24.

400

410

164000

... More
Others;Carting of debries 16 kms from mpl limits including loading and unloading etc, complete

25

284

7100

... More
Others;S&F premium make CPVC Pipes of 54mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge TBSC.J-1V-12 P- No.264. of Sor 23-24.

140

1481

207340

... More
Others;Supplying and fixing of SWR PVC pipes of 4 Kg/Sq.cm. and fixing all specials such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps with required number of Bombay nails etc., with solvent jointing as per standard practice including cost and conveyance of all materials to site, all operational, incidental, labour charges, overheads & contractors profit etc., complete for finished item of work at all floor levels . (APSS No. 1302 1319 & 1326) AS PER DATA. - Verticals 75mm

350

312

109200

... More
Others;do, Verticals 110mm

350

462

161700

... More
Others;Supply of 50mm PPR Ball Valve conforming to DIN Standards 8077/8092

12

661

7932

... More
Others;HIRE CHARGES FOR ACCESS SCAFFOLDING- using Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts. Wall Plates etc., for fixing sheets and applying Birla putty and painting etc.complete 3.66 to 7.32M, DUCT-GF

178.61

11

1984.36

... More
Others;do, DUCT-1st Flr

178.61

15

2759.52

... More
Others;do, DUCT-2nd Flr

178.61

19

3534.69

... More
Others;do, DUCT-3rd Flr

178.61

24

4308.07

... More
Others;do, DUCT-4th Flr

178.61

28

5083.24

... More
Others;do, DUCT-5th Flr

178.61

32

5858.41

... More
Others;do, DUCT-6th Flr

178.61

37

6633.58

... More
Others;do, DUCT-7th Flr

178.61

41

7408.74

... More
Others;do, DUCT-8th Flr

178.61

45

8183.91



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.