Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
490752Bid Award Id
ViewTender No
DRBO/R&B/ MDK/ 4 /2023-24/292/9 Dated : 8-1-2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
repairs and renovations;Making up loss of material/irregularities on the shoulder to the design level by adding fresh approved soil and compacting with appropriate equipment as per MORT&H Specification No. 3003 with carted earth for Alladurga Feeder road km 0/0 - 1/0
80
36
2928
... More
repairs and renovations;Providing B.T. Patchwork for pot holes of depth ranging from 25 to 35mm, using 20-25mm HBT metal with required quantity of 10-12mm size HBT key chips and VG-10 grade Bitumen at 72 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole, including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete.for Chevella to Pocharam road from km 0/0 to km 11/0
500
229
114500
... More
repairs and renovations;Providing B.T. Patchwork for pot holes of depth ranging from 50 to 70mm, using 40mm HBT metal with required quantity of 10-12mm size HBT key chips and VG-10 grade Bitumen at 42 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBT chips and VG-10 grade Bitumen at 72 Kgs/1Cum., including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete.for Chevella to Pocharam road from km 0/0 to km 11/0
120
366
43920
... More
repairs and renovations;Providing, Laying, Spreading and compacting graded HBG/HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.for Chevella to Pocharam road from km 0/0 to km 11/0
4
1730
6920
... More
repairs and renovations;Clearing Juliflora jungle (prosafis) including up-rooting and removing of stumps including all labour charges etc.and removal of debries from road site complete for finished item of work as directed by the engineer-in-charge.for Chevella to Pocharam road from km 0/0 to km 11/0
5000
4
20000
... More
repairs and renovations;Making up loss of material/irregularities on the shoulder to the design level by adding fresh approved soil and compacting with appropriate equipment as per MORT&H Specification No. 3003 with carted earth for Chevella to Pocharam road from km 0/0 to km 11/0
500
36
18300
... More
repairs and renovations;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge for Chevella to Pocharam road from km 0/0 to km 11/0
4
545
2180
... More
repairs and renovations;Providing and engaging Front end roller /JCB for removal of fallen trees encrachments etc. including all labour and operational and maintanance charges of T&P etc. complete.for Chevella to Pocharam road from km 0/0 to km 11/0
3
2028
6084
... More
repairs and renovations;Providing B.T. Patchwork for pot holes of depth ranging from 25 to 35mm, using 20-25mm HBT metal with required quantity of 10-12mm size HBT key chips and VG-10 grade Bitumen at 72 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole, including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete.for Dosapally to Gajawada road from km 0/0 to km 7/0
300
231
69300
... More
repairs and renovations;Providing B.T. Patchwork for pot holes of depth ranging from 50 to 70mm, using 40mm HBT metal with required quantity of 10-12mm size HBT key chips and VG-10 grade Bitumen at 42 Kgs./1Cum. of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBT chips and VG-10 grade Bitumen at 72 Kgs/1Cum., including removal of the loose material in the pot holes, trimming the edges to provide firm vertical faces, cleaning, applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials, T&P and labolur charges for all operations etc. complete.for Dosapally to Gajawada road from km 0/0 to km 7/0
40
369
14760
... More
repairs and renovations;Providing, Laying, Spreading and compacting graded HBG/HBG crushed stone aggregate to Wet Mix macadem specification including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.for Dosapally to Gajawada road from km 0/0 to km 7/0
4
1790
7160
... More
repairs and renovations;Clearing Juliflora jungle (prosafis) including up-rooting and removing of stumps including all labour charges etc.and removal of debries from road site complete for finished item of work as directed by the engineer-in-charge.for Dosapally to Gajawada road from km 0/0 to km 7/0
4000
4
16000
... More
repairs and renovations;Making up loss of material/irregularities on the shoulder to the design level by adding fresh approved soil and compacting with appropriate equipment as per MORT&H Specification No. 3003 with carted earth for Dosapally to Gajawada road from km 0/0 to km 7/0
400
36
14640
... More
repairs and renovations;Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy season as per the instructions of Engineer-in-Charge for Dosapally to Gajawada road from km 0/0 to km 7/0
4
545
2180
... More
repairs and renovations;Providing and engaging Front end roller /JCB for removal of fallen trees encrachments etc. including all labour and operational and maintanance charges of T&P etc. complete.for Dosapally to Gajawada road from km 0/0 to km 7/0
3
2028
6084
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements