Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 72,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
571401Tender No
Chief-Engineer (R&B) State Roads &CRN, Hyderabad e NIT No.10/KMM/5/1/CE(SR&CRN)/SE(D&P)/EE-3/DEE-2/AE/2024-25 Dt:20.01.2025Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
BOQ;Proving and laying Vibrated cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges, centering, machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure for Abutments and wing walls
143
7513
1074359
... More
BOQ;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-Charge for Foundation of Raft Foundation
114
7578
863892
... More
BOQ;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th Revision ) and as directed by the Engineer-in-Charge for Abutment Bed blocks & Backing walls, (Sub Structure)
10
8035
80350
... More
BOQ;Furnished and placing reinforced cement concrete in Super Structure of VRCC M25grade as per drawing and Technical Specification and MoRT&H Specification No.1500, 1600 & 1700 excluding cost of steel & its fabrication charges. As per MOST Drg.No:SD/118
107
8855
947485
... More
BOQ;Providing and laying Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour charges, centering, machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 2700 (5th Revision) for Levelling course below approach slab.
11
6336
69696
... More
BOQ;Providing and laying Vibrated reinforced cement concrete M30 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as per MOST Drg. SD/104 and as directed by the Engineer-in-Charge for Approach slab.
28
7473
209244
... More
BOQ;Providing and laying Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing SD/205 but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2702 (5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck slab.
14
7493
104902
... More
BOQ;Providing and laying Vibrated reinforced cement concrete M 40 grade using 20mm & 10mm HBT crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing SD/205 but excluding cost of steel and its fabrication charges as per MoRT&H specification nos 809, 1500, 1700 & 2200 -for Crash Barriers.
12
8628
103536
... More
BOQ;Providing HYSD bars (Fe-500) of different diameters, Procured from Primary steel producers like TATA,SAIL, VSP wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.
11.8
87456
1031981
... More
BOQ;Providing HYSD bars (Fe-500) of different diameters, Procured from Primary steel producers like TATA,SAIL, VSP wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
2.6
85173
221450
... More
BOQ;Providing HYSD bars (Fe-500) of different diameters, Procured from Primary steel producers like TATA,SAIL, VSP wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Foundation of R.C.C items.
6.5
84842
551473
... More
BOQ;Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0.25 cum of CC (1:4:8) including cost and conveyance of materials to site and including labour charges for packing the stones for revetment etc., but excluding labour charges complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for revetment.
8.3
2807
23298
... More
BOQ;Providing rough stone revetment 300 mm thick using 300mm size rough stonevariety including cost, and conveyance of all materials to site,including labour chargesfor packing the stones for revetment etc., but excluding labour charges complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for toe walls.
6
1855
11130
... More
BOQ;Providing and laying filter material with selected earth underneath pitching in slopes including cost, and conveyance of materials to site including labour charges etc., complete for finished item of work as per MoRT&H Specification 305, 309 & 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetment.
4.1
368
1509
... More
BOQ;Back filling behind Abutments with selected Soil including cost ,conveyance of all materials to site etc., but excluding seigniorage charges complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work
24
368
8832
... More
BOQ;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBT metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.
38
2116
80408
... More
BOQ;Providing weep holes in plain/ reinforced concrete abutment,wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure at 1.00 m C/C in both horizontal and vertical direction so that the weep holes in each horizontal direction staggered from the weep holes laying above and below lines as shown in drawing including cost and coveyance of the A.C. pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face etc., but excluding seigniorage charges complete for finished item of work for weep holes as per MORT&H specification No 2706 & 2200 (5th revision)
91
472
42952
... More
BOQ;Supplying & fixing of Drainage spouts complete as per MoRT&H specification No. 2705 and as per drawing No. SD/203 complete for finished item of work
2
1428
2856
... More
BOQ;Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulders laid dry without wire crates.
93
1756
163308
... More
BOQ;Forming embankment with borrowed useful earth from outside road boundary by mechanical means upto SDR with extra lead of 5 Km including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H and CBR not less than 10%, including all hire and operational charges of T&P , complete for finished item of work as per MoRT&H specification 305 (5th revision) (Payment will be made based on level for finished item of work) ..
1813.5
378
685503