Roads And Buildings Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 8,219Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
554432Tender No
Short NIT No .12/EE / DB / HD / 2024-25 Dated.24.10.2024Tender Authority
Roads And Buildings Department ViewPurchaser Address
-Website
http://http://www.rnbgujarat.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
FDR work;Providing B.T Patch work for pot holes of depth ranging from 70mm using 40 mm HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and (VG-10) grade Bitumen at 42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG-10 grade bitumen at 72 Kg/1cum , including removal of the loose meterial in the pot holes, trimming the edges to provide firm verticle faces, cleaning applying tack coat, filling the pot holes compacting and finishing and blinding the surface using stone dust/sand, including cost of all materials T&P and labour charges for all operations etc, complete. (Broken edges, potholes and road cutings)
390
434
169377
... More
FDR work;Scarifying the existing B.T surface to a depth of 50mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000mrts as per MoRT&H (5th revision) specin.305.4.3
800
10
8320
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements